Time Zone (UTC-04:00) Eastern Time

Work Order Details Report Date 7/12/24 9:18 PM


Page 1 of 3

Work Order D2-69938 Asset CGW001D22A


Scheduled Start Date 7/17/24 9:00 PM Scheduled Completion Date 7/17/24 10:00 PM
Project Number Task Number

Work Order Information


Work Order Description Cover Glass Washer Asset Description COVER GLASS WASHER 2A
(Turbo): Filter
Replacement
Work Order Type Preventive Released Date 7/12/24 4:37 AM
Work Order Subtype Production Maintenance Completed Date
Work Order Status Released Resequencing Operations During Execution No

Work Definition Details


Work Definition Name NA00001919: Cover Glass
Washer (Turbo): Filter
Replacement
Work Definition Version 1
Work Definition Version Date 7/16/24 9:00 PM
Time Zone (UTC-04:00) Eastern Time
Work Order Details Report Date 7/12/24 9:18 PM
Page 2 of 3

Work Order D2-69938 Asset CGW001D22A


Scheduled Start Date 7/17/24 9:00 PM Scheduled Completion Date 7/17/24 10:00 PM
Project Number Task Number

Work Order Operations


Operation Operation Execution Operation Operation Allow Work Scheduled Scheduled Scheduled Actual Actual Quantity
Sequence Code Sequence Name Type Resequence Center Start Date Completion Quantity Start Date Completion
Date Date Ready Completed
10 See DCC IN_HOUSE No DMT2R 7/17/24 9:00 7/17/24 10:00 1
Attachment ESOURC PM PM
ES

Operation Materials
Material Description Date Required Issued Open Available On Unit Of Supply Supply Sub Supply
Required Quantity Quantity Quantity Hand Measure Type Inventory Locator

60025597 Filter,Bag,50 7/17/24 9:00 4 4 4 Each Push SHOPFLOOR


Micron,7\" Dia, PM
32\" L
60032643 Filter, Main, Air 7/17/24 9:00 1 1 0 Each Push SHOPFLOOR
Inlet, for CGW PM
Turbo
60038004 Filter,Cartridge, 7/17/24 9:00 15 15 102 Each Push SHOPFLOOR
10 Micron,20 in, PM
SG10

Operation Resources
Resource Resource Type Basis Activity Job Equipment Usage Unit Of Required Issued Open Start Completion
Sequence Profile Profile Rate or Measure Quantity Quantity Quantity Date Date
Amount
1 MTC MECH Labor Variable 1 Hours 1 1 7/17/24 7/17/24 10:00 PM
9:00
PM
Time Zone (UTC-04:00) Eastern Time
Work Order Details Report Date 7/12/24 9:18 PM
Page 3 of 3

Work Order D2-69938 Asset CGW001D22A


Scheduled Start Date 7/17/24 9:00 PM Scheduled Completion Date 7/17/24 10:00 PM
Project Number Task Number
Operation Operation Execution Operation Operation Allow Work Scheduled Scheduled Scheduled Actual Actual Quantity
Sequence Code Sequence Name Type Resequence Center Start Date Completion Quantity Start Date Completion
Date Date Ready Completed