Financial Year : 2019-20 (for the period from 16-AUG-2019 to 31-MAR-2020)

Name & Designation of the Officer Reported Upon SHRI AKSHAY KUMAR SAHOO

ASSISTANT EXECUTIVE ENGINEER (CIVIL),ENGINEER-


IN-CHIEF (CIVIL), ODISHA,ODISHA

Service and Group (A/B) to which the Officer ODISHA ENGINEERING SERVICE
belongs
Group - A
_____________________________________________________________________________________________

Details of Transmission / Movement of PAR


( To be filled in at the time of transmission by respective officer / staff)

Transmission by Transmitted to whom (Name, Designation & Address)


Appraisee
Reporting 1. SHRI PRADEEP KUMAR DAS (EXECUTIVE ENGINEER,ENGINEER-IN-CHIEF (CIVIL),
Authority ODISHA,ODISHA)
(From:16-AUG-2019 To:31-MAR-2020)
Reviewing 1. SHRI DIPAK KUMAR TRIPATHY (SUPERINTENDING ENGINEER, LAVEL-II,ROADS AND
Authority BUILDING (CIVIL), ODISHA, BHUBANESWAR)
(From:16-AUG-2019 To:31-MAR-2020)
Accepting 1. BIJAYA KUMAR SAHU (CHIEF ENGINEER (CIVIL), DESIGNS,ENGINEER-IN-CHIEF
Authority (CIVIL), ODISHA,ODISHA)
(From:16-AUG-2019 To:23-OCT-2019)

2. SHRI JNANARANJAN BEURA (CHIEF ENGINEER,RESEARCH DEVELOPMENT AND


QUALITY PROMOTION,BHUBANESWAR)
(From:24-OCT-2019 To:04-NOV-2019)

3. BIJAYA KUMAR SAHU (CHIEF ENGINEER (CIVIL), DESIGNS,ENGINEER-IN-CHIEF


(CIVIL), ODISHA,ODISHA)
(From:05-NOV-2019 To:31-JAN-2020)

4. SHRI ANIL KANTA TRIPATHY (ENGINEER-IN-CHIEF,ENGINEER-IN-CHIEF (CIVIL),


ODISHA,ODISHA)
(From:01-FEB-2020 To:09-FEB-2020)

5. SHRI RAJENDRA KUMAR NAYAK (CHIEF ENGINEER,ENGINEER-IN-CHIEF (CIVIL),


ODISHA,ODISHA)
(From:10-FEB-2020 To:31-MAR-2020)
PERFORMANCE APPRAISAL REPORT
for
Group A and Group B Officers of Govt. of Odisha.
Report for the financial year 2019-20

( Period from 16-AUG-2019 to 31-MAR-2020 )

PERSONAL DATA
PART-I (To be filled in by the Appraisee )

1. Full Name of the Officer: SHRI AKSHAY KUMAR SAHOO

2. Date of Birth: 02-JUL-1980

3. Service to which the Officer belongs: ODISHA ENGINEERING SERVICE

4. Group to which the Officer belongs(A or B): A

5. Designation during the period of Report: ASSISTANT EXECUTIVE ENGINEER (CIVIL),ENGINEER-IN-CHIEF


(CIVIL), ODISHA,ODISHA

6. Office to which posted with Head Quarters: ENGINEER-IN-CHIEF (CIVIL), ODISHA,


BHUBANESWAR,Bhubaneswar

7. Period(s) of absence (on leave, training etc., Nil


if 30 days or more).Please mention date(s):

8. Name & Designation of the Reporting Authority 1. SHRI PRADEEP KUMAR DAS (EXECUTIVE ENGINEER,ENGINEER-
and period worked under him/her: IN-CHIEF (CIVIL), ODISHA,ODISHA)
(From:16-AUG-2019 To:31-MAR-2020)
_______________________________________________

9. Name & Designation of the Reviewing Authority 1. SHRI DIPAK KUMAR TRIPATHY (SUPERINTENDING ENGINEER,
and period worked under him/her: LAVEL-II,ROADS AND BUILDING (CIVIL), ODISHA,
BHUBANESWAR)
(From:16-AUG-2019 To:31-MAR-2020)
_______________________________________________

10. Name & Designation of the Accepting Authority 1. BIJAYA KUMAR SAHU (CHIEF ENGINEER (CIVIL),
and period worked under him/her: DESIGNS,ENGINEER-IN-CHIEF (CIVIL), ODISHA,ODISHA)
(From:16-AUG-2019 To:23-OCT-2019)

2. SHRI JNANARANJAN BEURA (CHIEF ENGINEER,RESEARCH


DEVELOPMENT AND QUALITY PROMOTION,BHUBANESWAR)
(From:24-OCT-2019 To:04-NOV-2019)

3. BIJAYA KUMAR SAHU (CHIEF ENGINEER (CIVIL),


DESIGNS,ENGINEER-IN-CHIEF (CIVIL), ODISHA,ODISHA)
(From:05-NOV-2019 To:31-JAN-2020)

4. SHRI ANIL KANTA TRIPATHY (ENGINEER-IN-CHIEF,ENGINEER-


IN-CHIEF (CIVIL), ODISHA,ODISHA)
(From:01-FEB-2020 To:09-FEB-2020)

5. SHRI RAJENDRA KUMAR NAYAK (CHIEF ENGINEER,ENGINEER-


IN-CHIEF (CIVIL), ODISHA,ODISHA)
(From:10-FEB-2020 To:31-MAR-2020)
_______________________________________________
SHRI AKSHAY KUMAR SAHOO
Signature of the Appraisee
PART-II SELF-APPRAISAL
(To be filled in by the Appraisee )

1. Brief description of duties/tasks entrusted.(in about 200 words)


I have been assigned under Design-V Bridges in Directorate of Design and mainly
entrusted the works of Phulbani (R&B) Division, Boudh (R&B) Division, Balliguda (R&B)
Division. Apart from this Works of Malkanagiri (R&B) Division, Angul (R&B) Division,
Kalahandi (R&B) Division, Deogarh (R&B) Division, Bargarh (R&B) Division, Bhubaneswar
(R&B) Division No-II were also assigned. The works primarily includes GAD Drawings,
Foundation and Sub structure Design of Open Raft and Pile foundations , Sub structure
Designs of Wall Type piers , Corbels , Circular RC Piers , Pier Cap. The observations on
submitted Hydraulic Particulars and Soil Investigation Reports were scrupulously studied
and assisted for seeking compliance in case of any data inconsistency and inadequacy
prior to take up of any GAD and Design Works . Also, assisted to the Departmental
Investigation Team for Paga-Narsignhpur Road failure and submitted the report jointly to
E.I.C.( Civil), Odisha with other team members.

_____________________________________________________________________________________________
2. Physical / Financial Targets & Achievements
_____________________________________________________________________________________________
SL. Task Target Achievement Qualitative % of % of Achievement
No Achievement
1 Construction of H L Bridge As entrusted completed 100 100
over River Potteru at Km
19/000 over Gorakhpalli on
Podia- Pusuguda Road
2 Sub structure, Raft As assigned completed and 100 100
Foundation and Super drawings issued as
structure design of per requisition
Construction of HL bridge
over Telmahul (Phatamura)
Nallah at 2/900 Km on
Diptipur- Gaisilat in the
District of Bargarh
3 Construction of H.L. Bridge As assigned by SE completed and test 100 100
at 6/330 Km on Designs ( Bridges) report awaited
Kapilaprasad-Jatani Road-
Test Piles of Kapila Prasad
BBSR Division-II along with
Revised GAD due to span
revision proposal
4 Assisting Investigation work Submission of Submitted 85 100
with Dr N C Pal ,SE , Er. Investigation
Fakirmohan Panigrahi SE Report on Paga-
and Er. Jayant Dhal EE Gopinathpur Road
Cuttack , RD &QP under Cuttack
(R&B) Division No-
II
5 Foundation and Sub As entrusted completed 100 100
structure Design of
Construction of H L Bridge
over Medalia Nallah at 1/200
Km on Tinkbir- Kushkulia
Road
6 Construction of H.L. Bridge Sub structure AL Completed and 100 100
over Jhidingpeta at 33/900 and AR, P1 and P2 issued
Km on P-B-D Road MDR- with Revised GAD
60A
7 Construction of HL Bridge Revised GAD, As entrusted 100 100
over Nahuruni Nallah at 2nd Structural Design
Km on Kanaloi- Kudanali Drawings of
Road Foundations, Sub
structures
8 Construction of HL Bridge Requisition for
Completed and 85 100
over River Bada Salunki at GAD issued
3/000 Km on Sankarkhole-
Kainjhar-Puburia-Mandakia
Road ODR
_____________________________________________________________________________________________
3.(i) Significant work, if any, done

Timely delivery of GAD and Designs as assigned during the period of reporting.
(ii) Work Done For Implementation of 5TS (Transparency,Teamwork,Technology,Transformation and Time):
Analysis , verification of Hydraulic particular, Soil Reports and Design calculations have been put up in respective files
for review and approval of higher officials . Some critical cases in deciding type of foundations , Formation Level etc
were carried out in consultations with higher officers and my colleagues in the Directorate to arrive at a timely and
sustainable solution. Use of Microsoft Excel Spread sheet, STAAD Pro, LEAP Bridge soft ware in Design and analysis
have been learnt and were used appropriately for rational and economy in design. Impromptu delivery of works assigned
to me , had saved time to carry out further way forwards at Field Levels.
4. Hindrance

Due to paucity of colleagues and staffs at Directorate soon after my joining and a fresher to
join for learning Codes available spread sheets and techniques and subsequently
discharging assignments in time was definitely a cumbersome task but with the guidance
of Higher Officers in the Directorate and Colleagues in the Cell have eased my difficulty to
some extent. Still capacity building and thorough study on software , various IRC and IS
codes , specialised trainings are necessary .