CONCEALED PLUMBING CL – 25

Check List :

1. Latest approved plumbing layout.


2. Waterproofing requirements.
3. Customer changes / NOC.
4. Chasing with cutter.
5. Ensure type and approved brand of materials ( pipe & fittings ) for concealed piping
work.
6. Coaltar painting to all concealed lines / insulation if any for hot water lines.
7. Ensure all taps position at tile joints. All fittings to be flush with tiles.
8. Proper filling with mortar.
9. Testing with required pressure and its record. To be tested at 10 kg / cm2 for GI /
CPVC pipe line and 07 kg / cm2 for Copper pipe line.
10. Identification marks of PMC & Domestic water.
11. Provision of nahani tarp, P-trap, CI bends outlets below waterproofing.
12. Fixtures levels.
13. Provide escape spouts at top coat level.

Records : Pressure test.


Consumption Statement.

WATER SUPPLY - RISING MAINS AND DISTRIBUTION CL – 26

Check List :

1. Consultant’s approved drawings / specifications for materials and pumps / work order.
2. Ensure the provision of valve and NRV, PRV
3. Position of delivery pipes, air vent pipes, over flow pipes, wash out drain pipes.
4. Joining and alignment of pipes near overhead tank.
5. Installation of water pumps of required capacity its Earthing and Electrical connection.
6. If auto control system is provided, then ensure
a) Quality of the sensors of the system.
b) Display panel for water tank.
c) Cabling used for system.
d) Protection for dry run.
7. Proper clamping for pipes.
8. Adopt telescopic arrangement in down take pipe lines and check the plumb and
alignment.
9. Pressure of water to each floor.
10. Identification marks on pipes PMC / wash water supply.

Records : Consumption Statement.

PRAVINYA GUTTA
FOURTH YEAR
BUILDING DRAINAGE SYSTEM UPTO
THE VERTICAL STACK CL – 27
Check List :
1. Check sequence of waterproofing before starting work.
2. Procurement of material as per approved drawing and changes in outlet of sanitary
wares.
3. Ensure the provision for bends, branch pieces etc.
4. Ensure the verticality of the stack before joining internal branches
5. Ensure leak proof joints
6. Ensure sufficient slope to horizontal drain pipes.
7. Introduce plug socket for cleaning.
8. Ensure inspection eye provided wherever necessary.
9. Ensure the position, levels of sanitary ware from the floor levels.
10. Ensure provision of anti siphon age pipes and elongated length of vent pipe above the
roof level.
11. Clamping the pipes rigidly to maintain verticality, plumb, line level, and slopes.
12. Ensure the free flow of drainage for the desired discharge by testing all the lines.
13. Do not mix rain water outlets in to sewage or sullage drains.
14. Rain water outlets to connect to rainwater harvesting system.
Records : Consumption Statement

C.P. AND SANITARY FITTINGS CL – 28


Check List :
1. Refer to specification and schedule of fittings, fixtures and sanitary ware and type of
outlet trap of W.C.
2. Customer changes and NOC
3. Free flow of water at least 15 minutes by removing plugs and then fixing fittings /
sanitary wares.
4. C.P. fixtures should be fixed with cloth packing while using the spanners.
5. Check all the fittings for free flow of water, leakages if any ( to be rectified )
6. Fix the identification mark on domestic and PMC water connection.
7. Ensure the sanitary fitting before fixing for colour code, defects if any.
8. Ensure proper grouting of EWC / WB brackets.
9. Ensure the proper functioning of flush tank / half turn valve / PVC connection for colour
code, defects if any.
10. Seat cover of correct size and matching colour.
11. Check for cleaning of tiles and sanitary ware, C.P. fiitings
12. Ensure that the plugs for boiler connections are easy to remove but at the same time
the plug is non-leaking.

STANDARD HEIGHTS OF PLUMBING FITTINGS


Sr. No. Fittings Height from FFL
1 Open Mixer 30”
2 Shower 78”
3 Tumbler Cock 12”
4 Wash Basin 33”
5 Angle Cock for Wash Basin 18”
6 Angle Cock for Flush Tank 24’
7 Bottle Trap Outlet 18”
8 Low level Cistern height 36”
9 Urinal 24”
10 Soap Dish 36”
11 Kitchen Sink Cock 39”
12 Kitchen Platform 31”
13 Flush Valve 41”
14 Fourway Divertor / Single Lever Divertor 39”
SEWAGE SYSTEM FROM
VERTICAL STACK TO SEPTIC TANK / DRAIN CL – 29

Check List :

1. Approved drawing / work order / specifications for materials.


2. Sewage line to be 5 m away from UGWT
3. Ensure all invert levels and proper slope.
4. Ensure the alignment of the line.
5. Record initial ground level.
6. Record excavated ground level.
7. Lay pipe in the upgrade direction of the slope and ensure all branches are connected
with proper slope.
8. Fill the joints as specified.
9. Sufficient time before backfilling (2 days)
10. Ensure minimum interval of chambers and provision of chambers at turnings. Ensure
drop in invert level in each chamber between incoming and outgoing pipes.
11. Ensure that all the chambers / manholes are plastered from inside & outside with
footsteps.
12. Ensure free flow in the pipe line till connecting drain to septic tank or Municipal
chamber.

Records : Consumption Statement / as built drawing

SEPTIC TANK CL – 30

Check List :

1. Approved drawing
2. Invert level of incoming sewer.
3. Record initial ground level.
4. Record final excavated ground level.
5. PCC / RCC, BBM, Water-proofing to be done as per respective check list.
6. Inlet – Outlet levels of tank.
7. Free board.
8. All the documents, Size of the compartments and the baffle walls.
9. Filler media materials and filling procedure.
10. Water tightness of septic tank.
11. Vents are provided.
12. Connected effluent to sock pit or nearest drain or STP

Records : Consumption Statement / as built drawing

EXTERNAL WATER SUPPLY – RISING MAIN CL – 31

Check List :

1. Approved drawing / work order / specification for materials.


2. Whether automatic level control system is to be provided.
3. Pump HP head, discharge and quality of foot valve.
4. Pump foundation.
5. Proper earthing for electrical supply.
6. Union joint on suction and delivery side of pump for easy maintenance.
7. Motor testing
8. Dry run protection.
9. Quality of sensors.
10. Quality of control panels.
11. No air is trapped on suction side.
12. All joints are watertight / leakages to be repaired.
13. NRV and sluice / gate valves on rising main.
14. Identification for drinking water, wash water and recycled water for flushing.
15. Record the time required to fill the OHWT
16. Ensure that the NRV flap closes as soon as pump stops.
17. Ensure that no water is stagnant on the pump room floor.
18. As built drawing to be prepared.

Records : Consumption Statement

ELECTRICAL WIRING, FITTINGS AND FIXTURES CL – 32

Check List :

1. Refer to schedule and specifications of fittings and fixtures


2. Customer changes / N.O.C.
3. The quality gauges and the brand name of the wires, as per the approvals, before
starting the works.
4. Check the colour code and specification of the wire for points and avoid joints wiring.
5. Fix the accessories on the boards, as required with line and level and of approved
brand.
6. Terminate the wire in accessories, considering an extra length for looping.
7. Connect the wires in accessories, considering an extra length for looping.
8. After starting the supply, switch on the main switch and check all the points with
megar and test lamp.

WIRES AND THEIR COLOURS

1.5 mm2 Point Wiring Yellow


2.5 mm2 Sub Main and 16 A Point Red
4 mm2 Boiler and AC Point Blue

COLOUR PURPOSE
Red, Yellow, Blue Phase Wires
Black Neutral
Green Earthing

EXTERNAL ELECTRICAL M.S.E.D.C.L. SUPPLY CL – 33

Check List :

1. Civil instrument work of LT room and transformer yard based on approved layout of
M.S.E.D.C.L. and electrical inspector and detailing by Architects and RCC consultants.
2. M.S.E.D.C.L. approved layout of transformer, four pole structure, LT / HT panels,
earthing provision switchgear, feeder pillars, cable layout from transformer to meter
board including sizing.
3. Work order for transformer, LT / HT panels, switchgear, cables, steel structure, feeder
pillar and all accessories required.
4. Electrical contractors scope of work, his work order, installation schedule.
5. Approvals from M.S.E.D.C.L. and electrical inspector after erection.
6. M.S.E.D.C.L. supply from outside mains for charging transformer, testing and
commissioning of the total system.

Records : Approved drawing from M.S.E.D.C.L., Architect and Consultant.

Material Consumption
EXTERNAL ELECTRICAL GENERATOR SUPPLY CL – 34

Check List :

1. Civil construction work as per manufacturer’s requirement, detailing by architect and


RCC consultant.
2. Approved layout of generator foundation, AMF and switching panels, diesel stock
provision, ducting and ventilation, chimney for smoke disposal, earthing, canopy etc by
the approved suppliers and erection contractor.
3. Schedule for erection, testing and commissioning.
4. Approval from electrical inspector concerned.
5. Maintenance Manual.
6. Maintenance contract.

Records : Approved Drawings / Fuel consumption records

FIRE FIGHTING SYSTEM CL – 46

Check List :

1. The capacity of U.G.W.T. and O.H.W.T. with provision in that for fire fighting storage.
2. Other requirement as per municipal authorities in provisional N.O.C.
3. Authorized agency for fire fighting installation work.
4. Quality of material supplied by the contractor refers work order.
5. Civil work like excavation, making holes to the bricks, wall, concrete and refinishing of
the same is done properly as per the requirements of working agency.
6. Scaffolding fixed in such a way that no work in fire fighting is disturbed.
7. Testing done before inspection by Municipal authorities.
8. All G.I. / M.S. pipe line for straightness, level plumb, etc for perfect ness.
9. G.I. / M.S. line painted in red colour.
10. Check all required electrical connections are provided and are in working condition.
11. Check that all fire extinguishers are working and installed at proper location.
12. Fire hydrant located is easily accessible.
COLLECTION AND DISPOSAL OF DRY GARBAGE / WET GARBAGE CL - 51

Check List :

1. For 100 kg wet garbage per day (approximately half kg / family / day), construct 7
bins of size 8’ x 4’ x 2’6” (plastering is optional) over ground level along suitable part
of the compound wall.
2. Bins should be marked “Monday, Tuesday,…..” for efficient disposal.
3. Spread broken piece of bricks evenly at bottom of bins.
4. On the layer of bricks spread coconut fiber, dry leaves.
5. Instruct every flat owner to collect wet and dry garbage in separate bags or buckets.
6. Ensure that the person is appointed for collecting wastage from every house.
7. Ensure that the person collects wet and dry garbage separately.
8. Spread wet garbage inside bin (of respective day)
9. Sprinkle rock-dust on it.
10. On these layers sprinkle vermi ++ Biosanitizer (Biosanitizer is an enzyme used to
process biodegradable waste in simple and efficient manner).
11. Cover it with thin layer of garden waste.
12. Sprinkle ‘Sujala Biosanitizer’ water with a watering can evenly over entire bins. (Packet
of ‘Sujala Biosanitizer’ to be left in watering can permanently)
13. Repeat the process in the next bin for next day.
14. Spread the waste wet in every day in the respective bin only, but every day sprinkle
‘Sujala Biosanitizer’ water in all bins.
15. Ensure that the dry wastage is separate like paper and plastic for recycling and
remaining garbage dump into the PMC separate dust bin for dry garbage.
16. Ensure that the PMC container comes and collects all the wastage and dump into the
depot everyday.
17. A.M.C. may be given to approved agency.
Records : Waste Collecting Register.

WORKING AND MAINTENANCE OF FIRE FIGHTING EQUIPMENTS CL –53

Check List :

1. Ensure that OHWT capacity 10,000 liters serve for fire fighting.
2. Ensure that UGWT capacity 50,000 liters serve for fire fighting if applicable.
3. Ensure that 4” dia pipeline for each building in each one main valve & NRV at OHWT &
3 HP with back up pump is connected to the line. Hydrant valve with lugs for every
floor to attach delivery hose & branch pipe fire alarm system with control panel pill box
& siren at ground floor.
4. Ensure that the oiling to lungs assembly, Female coupling hydrant Spindles, Gate
Valves Spindle & pump checking for inner gaskets of hydrant valve & coupling.
5. Ensure that the Portable extinguisher for each building servicing fire extinguisher
quarterly done and yearly refilling and demonstration before refilling.
6. Ensure that Fire Drill System is done quarterly.

Records : Fire Fighting Maintenance Register.