Professional Documents
Culture Documents
ON SITE EMERGENCY PLAN_2020 _Final
ON SITE EMERGENCY PLAN_2020 _Final
ON SITE EMERGENCY PLAN_2020 _Final
ON SITE EMERGENCY
PLAN
Page 1 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
TABLE OF CONTENTS
S. No. TITLE Page No.
1. GENERAL INFORMATION 3
1.1 Introduction of the company 4
1.2 Organization’s EHS policy 5
1.3 Definitions, scope & objectives of onsite emergency plan 6
1.4 Working pattern 6
1.5 Geographical details 7
1.6 Demographical details 8
1.7 Meteorological data 9
1.8 Humidity 9
1.9 Temperature 10
1.10 Rainfall 10
1.11 Wind 10
2. IDENTIFICATION OF HAZARD & RISK ASSESSMENT 11
2.1 Identification of Hazard 11
2.1.1 Factory layout. 11
2.1.2 Storage hazard & controls. 11
2.1.3 Process hazard & controls. 11
3. EMERGENCY ORGANIZATION 16
3.1 Emergency arrangements 16
3.1.1 Assembly point. 16
3.1.2 Emergency control center. 17
3.1.3 Fire protection arrangement 17
3.1.4 Medical services 18
3.1.5 Emergency preparedness 19
3.1.6 Functions (Responsibilities) During an Emergency in Organization 19
4. COMMUNICATION SYTEM 32
5. ACTION ON SITE 33
5.1 Emergency action plan 34
6. TRAINING AND REHEARSAL 36
6.1 Training 37
6.2 Rehearsal 37
7. LIST OF EXHIBITS 37
8. ABBREVIATIONS 37
9. REVISION HISTORY 39
Page 2 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
1. GENERAL INFORMATION
Despite having best safety measures and systems, the probability of occurrence of an incident, having
disastrous consequences, in a plant cannot be totally ruled out. In some cases, this may result in loss of life
and/or extensive damage to property. To minimize the potential of such a loss and damage, it is necessary to
plan responses to such emergencies in advance. Fire, Explosion, Gas release, Chemical spills and the forces
of nature (Natural calamity) are among the conditions that may lead to an emergency in the chemical
industries.
APOTEX RESEARCH PVT LTD is aware of its responsibility towards the Safety, Health & Environment
protection within and around its neighborhood and has formulated this emergency plan to minimize and
control the loss of life and property.
This EMERGENCY PLAN is a description of series of actions and decisions, which when carried out is
intended to control or minimize the adverse results of an emergency.
Each one of us and community have a role to play in case of an emergency. Our preparedness to prevent and
control emergency are more important than our guesses or the probability. Failure to prepare in advance is to
invite hazard. One who has an effective emergency plan has hope of survival.
Control depends on an immediate response to procedures that must have been learned. It depends on
how well individuals know on what to do in an emergency.
Emotional security depends on facts, understanding, sound action and basic emergency.
It is normal to be afraid, but excessive and irrational behavior leads to mass hysteria.
All have powers within limits of their powers, it is the ability to control the information and support during
preparation of this plan is vital.
The primary objective of this manual is to provide concepts that can serve as a guideline for handling all
safety related emergencies (general and critical) at Apotex Research Private Limited.
This plan provides detailed information on the systems and procedures to be followed by every employee of
Apotex Research Private Limited (ARPL) India, in case of declared emergencies. It also refers the functions
and procedures of designated persons at the time of emergency.
Page 3 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Page 4 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
From its humble origins of only two employees, grown to more than 10,000 people worldwide in
manufacturing, R&D and commercial operations. Through vertical integration, the Apotex Group of
Companies is comprised of Apotex Generics, Apotex Active Pharmaceutical Ingredients, Apobiologix and
ApoPharma (innovative products)
Apotex export to more than 115 countries and territories, and operate in more than 45 countries, including a
significant presence in the US, Mexico and India.
Globally, Apotex inc., produce approximately 25 billion doses per year, which, in turn are used to fill
approximately 90 million prescriptions in Canada alone, or one in five prescriptions.
In the past five years alone, we have helped to bring more than 20 prescription drugs to market before patent
expiry, and in doing so, saved public and private payers more than $4 billion. In total, we have saved
Canadians almost $19 billion by bringing products to market early.
Apotex Inc. Canada has set up two new “state-of-the art” high-tech research and development and
manufacturing facilities in India, namely Apotex Pharmachem India Pvt. Ltd (APIPL) and Apotex Research
Pvt. Ltd. (ARPL) at Bengaluru. World-class facilities are set up as export-oriented Units in 20 acres of land at
Bommasandra Industrial area, Bengaluru.
ARPL is set up to undertake research and development, focused on development and production of various
types of dosage forms of Active Pharmaceutical ingredients and bio-equivalence studies.
Similarly, APIPL is expected to undertake research and development focused on verification and development
of indigenously developed processes for various chemical compounds and drug intermediates, production of
active pharmaceutical ingredients, drug intermediates etc.
Apotex’s investment in India-Bengaluru is a testament to their commitment to global healthcare needs while
recognizing the availability of topnotch science and engineering talent in India. The opening and expansion of
Apotex new facilities shall create new high-skill, technical, scientific and engineering jobs in the Garden City of
India.
Page 5 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
We are committed to the wellbeing of our employees, community and the protection of our environment
through the following:
a. Our global vision is to aspire for highest international standards in plant design, equipment selection,
maintenance, operations and EHS compliance.
b. As a matter of corporate philosophy and policy, we are committed to develop and manufacture products
safely and in an environment friendly manner with due consideration for occupational health of our
employees and others who may be involved and /or related to our operations.
c. We comply with all applicable laws and regulations pertaining to our operations.
d. It is our policy that the safety and health of the surrounding community around our Development, Bio –
Clinical Evaluation and Manufacturing sites are of utmost importance to us, and we will make sure that
any adverse environmental impact is minimized & all hazardous materials notified by the PCB will be
disposed as per the prescribed norms.
e. We will make environmental, occupational health and safety information / expertise available to our
employees, regulatory agencies and the community at large.
f. We will make environmental, health and safety considerations a priority in the planning for new projects,
products and processes and upgrading of existing products and processes.
g. Management or designate will periodically audit environmental, occupational health and safety systems
with progressive international benchmarking.
h. The environment, health and safety concerns and practices will form an integral part of every employee’s
training and development.
Page 6 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
We pledge our allegiance to Environment, Health and Safety policy as an integral part of our organizational
culture and all employees are responsible and accountable individually, as well as collectively for its
adherence.
Definition
A major emergency in a plant is one which has the potential to cause serious injury or loss of life. It may
cause extensive damage to property and serious disruption both inside and outside the plant. Sometimes, it
would require the assistance of outside emergency services to handle it effectively. Although the emergency
may be caused by a number of different factors, e.g. plant failure, human error, earthquake, vehicle crash or
sabotage, it will normally manifest itself into three basic forms, viz.-fire, explosion or toxic release.
Scope
The scope of the plan is to ensure safety of life, protection of environment, and protection of the installation.
Although the emergency may be caused by different factors such as earthquake, civil disturbance or
sabotage, equipment failure, human error, it will normally manifest in the form of fire explosion, toxic
release etc.
SHIFT FROM TO
Page 7 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
a. Weekly Holidays: For General Shift, Weekly holidays is on Saturday & Sunday. For shift employees
staggered weekly off is given for 2 days in a week.
b. Declared General Holidays: The Company has a maximum of 12 days holidays during any calendar year.
Five are National holidays (Republic Day, Independence Day, May Day, Gandhi Jayanti
and Kannada Rajyotsava). Six are Festival Holidays. One shall be an Optional Holiday.
Location: ARPL is located at (Karnataka Industrial Area Development Board) Industrial area,
Bommasandra, Bengaluru. Layout map showing location of ARPL is enclosed in EXHIBIT-A and
the location is shown below
The geographical coordinates of Anekal are 12.711 deg latitude, 77.696 deg longitude, and 3,041
ft elevation. The topography within 2 miles of Anekal contains only modest variations in elevation,
with a maximum elevation change of 223 feet and an average elevation above sea level of 3,017
feet. Within 10 miles contains only modest variations in elevation (1,024 feet). Within 50
miles contains very significant variations in elevation (4,154 feet).
The area within 2 miles of Anekal is covered by cropland (93%), within 10
miles by cropland (83%), and within 50 miles by cropland (78%)
Page 8 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Page 9 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Source: www.censusindia.co.in
Meteorological data applicable to the site with respect to temperature, humidity, wind speed and direction,
rainfall etc. as summarized below.
1.8 HUMIDITY
The humidity comfort level is based on the dew point, as it determines whether perspiration will evaporate
from the skin, thereby cooling the body. Lower dew points feel drier and higher dew points feel more humid.
Unlike temperature, which typically varies significantly between night and day, dew point tends to change
more slowly, so while the temperature may drop at night, a muggy day is typically followed by a muggy night.
Page 10 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
The muggier period of the year lasts for 8.2 months, from March 30 to December 3, during which time the
comfort level is muggy, oppressive, or miserable at least 22% of the time. The month with the most muggy
days in Anekal is May, with 21.9 days that are muggy or worse.
The month with the fewest muggy days in Anekal is February, with 1.4 days that are muggy or worse.
1.9 TEMPERATURE
The hot season lasts for 2.6 months, from March 4 to May 22, with an average daily high temperature
above 89°F. The hottest month of the year in Anekal is April, with an average high of 92°F and low of 72°F.
The cool season lasts for 2.8 months, from October 13 to January 7, with an average daily high temperature
below 82°F. The coldest month of the year in Anekal is December, with an average low of 62°F and high
of 80°F.
1.10 RAINFALL
To show variation within the months and not just the monthly totals, we show the rainfall accumulated over a
sliding 31-day period centered around each day of the year. Anekal experiences extreme seasonal variation in
monthly rainfall. The rainy period of the year lasts for 9.1 months, from March 20 to December 25, with a
sliding 31-day rainfall of at least 0.5 inches. The month with the most rain in Anekal is September, with an
average rainfall of 4.9 inches. The rainless period of the year lasts for 2.9 months, from December
25 to March 20. The month with the least rain in Anekal is January, with an average rainfall of 0.1 inches.
1.11 WIND
This section discusses the wide-area hourly average wind vector (speed and direction) at 10 meters above
the ground. The wind experienced at any given location is highly dependent on local topography and other
factors, and instantaneous wind speed and direction vary more widely than hourly averages.
The average hourly wind speed in Anekal experiences significant seasonal variation over the course of the
year.
The windier part of the year lasts for 3.1 months, from June 1 to September 3, with average wind speeds of
more than 10.0 miles per hour. The windiest month of the year in Anekal is July, with an average hourly wind
speed of 13.6 miles per hour. The calmer time of year lasts for 8.9 months, from September 3 to June 1.
The calmest month of the year in Anekal is October, with an average hourly wind speed of 6.3 miles per hour.
The predominant average hourly wind direction in Anekal varies throughout the year.
The wind is most often from the west for 5.3 months, from May 1 to October 11, with a peak percentage
of 98% on June 30. The wind is most often from the east for 6.7 months, from October 11 to May 1, with a
peak percentage of 91% on January 1.
Page 11 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
In Anekal, the wet season is warm, muggy, and overcast and the dry season is hot and partly cloudy. Over the
course of the year, the temperature typically varies from 61°F to 92°F and is rarely below 56°F or above 98°F.
Identification, analysis & assessment of hazards and risks provide vital information for risk management. The
events that can lead to emergency are fire, explosion, toxic release, leakage of toxic, corrosive, flammable
liquids. The hazard analysis revealed that the damage distance is very much confined to plant boundary only.
Risk associated with any activity is directly proportional to hazards control procedures and arrangements.
Hazard analysis essentially consists of identifying and quantifying various hazards or unsafe conditions that
may exist or arise in the plant on account of a variety of causes such as poor design or engineering, plant
failure, human error, earthquake, sabotage etc. Risk analysis on the other hand refers to the identification and
qualification of risk to the plant, personnel and surrounding arising out of the hazard previously identified.
To carryout risk assessment, the following hazard control arrangements & procedures are considered:
Factory layout.
Storage hazard & controls.
Process hazard & controls.
2.1.1 Factory Layout: A plan of factory premises showing details of Fire hydrant line, Assembly point,
Emergency escape route map etc., enclosed in EXHIBIT – A.
2.1.2 Storage Hazard & Controls: The chemicals are stored as per compatibility provided with a secondary
containment. Product-wise description of hazardous chemicals with hazardous properties
is enclosed in EXHIBIT- B (The List will be updated periodically).
2.1.3 Process Hazard & Controls: Manufacture of products at ARPL involves the following steps:
Page 12 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
BLENDING
CAPSULE INSPECTION
OVERPRINTING
PACKING
(PRINTED PACKING MATERIALS)
FINSIHED PRODUCT
Page 13 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
RAW MATERIALS
DISPENSING OF SIFTING
RAW MATERIALS & PACKING
DRY MIXING
SLUGGING / WET
DRYING
SIZING
PACKING
MATERIALS
LUBRICATION
COMPRESSION
COATING
COATED TABLETS
OVERPRINTING
PACKING
(PRINTED PACKING MATERIALS)
FINSIHED PRODUCT
Page 14 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Dispensing The first step in any of the process is the All parts are connected and earthed to drop static
dispensing of API, Excipients and packing charge
material
Blending / Sifted API and Excipients are to be blended / To prevent man entry while on blender rotation a
Dry Mixing dry mixed in the cage blender / RMG safety guard is provided with interlocking. (If
someone opens the railing the blender stops)
Wet In wet granulation process is required to be To prevent material spillage while on operation
Granulation carried out in RMG by addition of binder the top lid is provided with limit switch and
discharge valve is interconnected with bowl. This
will prevent material splashing on to personnel.
Drying Drying is to be carried out in FBD To prevent static charging all parts of the FBD is
connected and earthed. In case if the parts are
not connected properly the equipment will not
start (a proximity sensor is connected to ensure
proper earthing). And in case of pressure build up
in FBD, the FBD has to blow up due to high
pressure, an explosion flap is fitted on side of the
FBD which will open towards service area and
prevent material splashing on to the personnel
Roll If dry granulation process is required then To prevent accidental hands placing on top of
Compaction carry out the same in roll compaction Gerteis pressurized rollers the doors are interlocked.
Roll compactor When the door opens the rollers will stop rotating
Sizing Sizing of the dried granules is to be carried To prevent material splashing safety guard are
out in Co-mill. provided
Capsule Filling of powder in capsule is to be carried To prevent manual operations the doors are
Filling out on capsule filling machine interlocked and when the personnel opens the
door the machine stops functioning. And the
machine is connected with dust extractor to
prevent dust exposure
Compression Compression of granules in to tablets is To prevent manual operations the doors are
carried out on compression machine interlocked and when the personnel opens the
door the machine stops functioning. And the
machine is connected with dust extractor to
prevent dust exposure. All the motor & gear box
portion is completely covered to prevent direct
contact
Page 15 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Coating Coating of the tablets is to be carried out in To prevent environmental pollution the equipment
coating machine is fitted with wet scrubber and the outlet from the
scrubber is sent to effluent treatment plant. The
motor, gear box and other moving parts are
covered with SS cover
Quality Control All instruments are earthed properly to prevent any static charge.
Instruments & All flammable chemicals / items are handled under fumes hood, where a dedicated
safety
exhaust removes the fumes from the lab.
precautions
All the personnel are advised to use PPEs (Personal Protective Equipment’s) while
handling chemicals or preparing solutions.
Flammable chemicals are stored in fire proof cabinets
Utility All incoming power panels are identified with red color for ease of identification to isolate
Equipment’s the power in case of power failure.
Air hot water and steam lines (Including drain) are insulated and color coded.
Pre filters are cleaned under covered condition to prevent the dust exposure to the
personnel and the outlet of the exhaust air from filter cleaning booth is connected with wet
scrubber. The outlet of wet scrubber is connected to ETP sump.
The plant’s highest point is fitted with lightning arrester and all major utility equipment’s are
earthed properly.
All the earth pits are periodically tested and certified.
The ARPL utilities are color coded and the details of codes are locally displayed in the
respective area.
NOTE: Use necessary personal protective equipment as per the activities undertaken.
Page 16 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
3. EMERGENCY ORGANIZATION
It is not possible to envisage and detail every action which should be taken during an emergency and
harness the basic elements of emergency preparedness and gravity of emergency. Emergency Organization
is set up to specify duties and responsibility of all to make best use of all resources and to avoid confusion
while tackling the emergency.
3.1 Emergency arrangements – May include or go beyond the listed following are :
- Assembly Point.
- Emergency Control Center.
- Fire Protection Arrangement.
- Medical Services.
- Emergency Preparedness
- Functions (Responsibilities) during an emergency in an organization
In the middle of garden i.e. opposite to volunteer reception entrance & parallel to bio
ARPL-2 Primary
analytical main entrance
BEC
Alternate Garden area near Entrance of Bio-analytical Lab & Clinic.
Note 1: The decision to activate alternate assembly point shall be taken by the site controller in consultation with
the site head. The assembly point will be decided after taking into consideration the location of the
emergency and direction of the prevailing wind.
Note-2: In case there is no specific announcement for assembly point, all employees will immediately move
towards assembly point No. 1.
Page 17 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
1.1.2. Emergency Control Center/ Gate No. 5, Gate No. 4 & Gate No 1:
Emergency control center is equipped with adequate means of telecommunication to areas inside and outside the
site, together with relevant equipment to those manning the center and to enable them to organize emergency
efficiently.
The ECC contains –
- Site plan, hazard identification chart.
- Emergency organization chart.
- Material safety data sheets / specific poisoning – symptomatic treatment procedures. List of important
telephone number
- Emergency transportation facility.
- Emergency siren control panel.
Fire Brigade Facilities: Fire Station at Electronic City Phase 1 is situated 7 KM from the site and would take
20 Minutes to reach in case of emergency. The list of important telephone numbers is
available in Exhibit-D: Emergency contacts details.
Fire Protection Equipment: Fire alarm system is designed to detect the presence of fire by monitoring
continuously. ARPL has provided fire alarm and public address facility. Fire alarm
systems are used to notify the people to evacuate in the event of fire or other
emergency forces aid, and to prepare the structure and associated systems to control
the spread of fire and smoke. Refer Exhibit-F for further details of the smoke
detectors and the fire alarm panels and public-address system of ARPL.
Fire Hydrant System: Existing fire hydrant system at individual plots are present though sufficient as per the
building design, yet the FHS are integrated with each other, and further including with
Apotex Pharma chem. India Pvt Ltd. For a robust system. Refer Exhibit-G for further
details fire hydrant system.
Fire Extinguishing System: Adequate numbers of dry chemical powder type, mechanical foam type, Carbon
dioxide type, Du-Pont type and ABC type fire extinguishers are installed as per fire
risk assessment, in all plants/sections/departments of ARPL. Detailed list of fire
extinguishers has been updated in Exhibit-H.
FM 200 System: A unique type of fire suppression system installed at below mentioned locations and
number of cylinders list updated.
Page 18 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Bed 01 No.
Medical Oxygen Cylinders 01 No.
Lifesaving Medicines As per approved List
BP Monitoring Apparatus 01 No.
Clinical Thermometer 02 Nos.
Stretcher 01 No.
Weighing Balance 01 No.
Stethoscope 01 No.
Refrigerator 01 No.
In addition,
- Trained first aider names are displayed along with first aid box checklist. (Revised as & when more than
30% of listed personnel change).
- Apart from above facility ARPL has made arrangement with Narayana Health Hospital /Mazumdar. Shah
Hospital / Kauvery Hospital (These hospitals are located very close to the factory. For the contact details
(Refer Exhibit-D).)
- The pre-employment medical check-up and annual medical examination is being carried out by Third
party at ARPL.
Page 19 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
If one notices Fire / Toxic Release / Explosion / Spillage / Leakage / Other hazard conditions which may lead
to emergency. One should raise an alarm or if trained shall attempt to contain / control the same. He/she
shall also intimate the same to the reception form nearest phone.
Reception shall announce the message to seek the help of safety squad by using public addressing system.
All employees / contractors / visitors shall follow the guidelines given in their respective roles and
responsibilities as listed below.
Role Responsibilities
Page 20 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Role Responsibilities
properly.
Reports all significant developments to communication officers.
On failure of power supply, setup communication point at site and establish
communication with ECC
Communication Proceed to ECC and maintain communication with IC.
officer (CO) Recruit suitable staff to act as runners between IC and himself in the event of
communication network failure.
Co-ordinate all activities such as additional firefighting equipment, rescue,
evacuation & first aid equipment with IC.
Arrange mutual aid by seeking outside help (if required)
Co-ordinate all the activities at the assembly points.
Report the status of ECC, assembly point and traffic control to the SMC / IC
Head count should be cross checked.
If the head count doesn’t match he needs to inform first aiders & fire fighters to
search for the missing personnel.
Maintain log of incident.
Site Controllers / Stop all the operations in the affected area.
Dept. Heads / Deploy all available sectional fire fighters in the area to fight and contain the fire.
Managers (Alt)
Ensure power isolation of the area (Call 1113/9538023489)
Arrange to remove inflammable material.
Move to the corridor and wait for the further information (if emergency declared)
Evacuate employees to safe assembly point.
Take head count
Administrative Receptionist shall pass on the message to incident controller / site main
Assistant / controller.
Receptionist Receptionist shall pass on the information to the clinic and ensure ambulance
report to site of emergency.
Deactivate access control system.
Keep the board free for essential calls, avoid any external call.
Keep the list of essential telephone no’s ready.
Keep the record of all incoming / outgoing messages related to emergency.
Not to disclose emergency related information to unauthorized person without
prior permission of SMC.
Inform communication officer to proceed to emergency control center & inform
about the location of emergency
Maintenance In – Rush to the hydrant pump house / utility control room & ensure the following
Charge / Shift actions.
Engineers Ensure proper shutdown of utilities as per request by IC.
After confirmation from safety In-charge (1784) isolates the power at the affected
area.
Ensure pump starts automatically in sequence with the pressure switches.
Page 21 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Role Responsibilities
A standby to be utilized to start the (diesel) pump manually if needed as per the
instructions of safety squad along with electrician.
Provide necessary back up services for controlling emergencies.
Inspection and clearance to resume operation after normalcy is declared
Security Guards Inform receptionist to pass the message.
Simultaneously inform maintenance in charge.
Guards as respective gates will close their gates.
Not to disclose the information regarding emergencies to any unauthorized
person.
Remaining security staff deployed on the post will move the safe assembly point
and submit the head count list to communication officer.
Security supervisor should ensure that all the entered visitors & contractors are
present in the safe assembly point.
Act as a team as directed by the safety in-charge / communication officer
Fire Fighters Upon hearing the alarm all Fire Fighters to rush to the Emergency Control Centre
& report to communication officer.
Upon instruction from communication officer rush to the incident location for
Firefighting.
Ensure that the personnel’s other than ERT/FF/FA are sent away from incident
location.
Utilize the available plant personnel for isolation activities.
In case there a miss match in the head count FF to search for the missed
employees.
In case there is spill of chemicals, fire fighters must rush to the incident location to
control the spill.
First Aiders Upon receipt of message of an incident from receptionist, he/she shall instruct
Ambulance drivers.
Keep necessary equipment’s, medicines etc. ready for treatment.
First aiders shall rush to emergency control center & report to communication
officer.
Ensure the ambulance is sent to affected area with first aid personnel.
First aid person will ensure the timely evacuation of casualty to Occupational
Health Center (OHC)
First aid should be given to casualty at Occupational Health Center (OHC)
In case there is miss match in the head count First Aiders to search for the
missing personnel.
All Employees & Stop all the operations as soon as you hear an alarm followed by an
Visitors announcement for evacuation.
Move to the corridor and wait for further instruction.
Use the nearest fire exit to reach the safe assembly point.
Follow the line, brisk walk & give head count & wait for further information.
On getting ‘All clear signal’ you can resume to the normal work
Page 22 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Role Responsibilities
Note: Emergency control center is gate 5 in LVMP, Gate 4 in plot 1 and Gate 1 in plot 2.
iv. Prepare a plan and gather the required materials to handle the spill.
vi. Appropriate protective clothing is required before beginning any clean up. This includes but is not limited
to:
Goggles
Gloves
Rubber apron
Boots
Respirators / SCBA
vii. Appropriate equipment is also required before beginning any clean up. This includes but is not limited to:
Page 23 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
viii. The proper absorbent material must be selected to use for the clean–up. Some will absorb hydrophobic
materials, while other will absorb hydrophilic materials. Absorbents also come in various configurations
which include:
Pads
Rolls
Granules
ix. Proper planning to handle anticipated hazards is important. The spillage hazards may include:
Fire
Spillage
Explosion
Toxic Fumes
Reactivity
Corrosion
Oxygen Deficiency/Excess
IDLH atmosphere
x. Any materials to be disposed off must be handled and labeled according to proper hazardous waste
disposal procedures.
xi. All waste cannot be disposed of in the regular garbage. Including spilled material and absorbent
materials used in the clean–up.
i. If a hazard or explosion could result from a spill (see MSDS) evacuate the area or building immediately
and notify the fire department, Emergency Coordinator, Facilities and EHS.
iv. Turn off the sources of spill (e.g., gas cylinder) or contain the spill as much as possible.
v. Absorb flammable liquids with an absorbent specially designed for the purpose of containing the vapors
as well as liquid, and then transfer it to fume hoods or a fire resistant disposal container. While
flammable material is being cleaned up, one person shall stand by with an appropriate fire extinguisher.
Page 24 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Page 25 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
i. Cleaning Mop, towel and sponge materials transfer them to a labeled disposable container.
ii. If a toxic gas cylinder is leaking, evacuate the area(s) and contact the fire department.
Immediately clean up mercury spills, even small ones. Use a special mercury spill kit for picking up
drops of mercury. It will clean up even very tiny drops of material that may not be visible. Do not use a
vacuum cleaner, as it will promote the vaporization of mercury, increasing air contamination and the
risk of inhalation. React immediately mercury that has escaped into inaccessible places with material
specially formulated for this purpose (see MSDS). Never put mercury into the ordinary garbage where
it may react with organic material and form biologically toxic products.
BIOLOGICAL HAZARDS
i. These substances are hazardous as they may contain biological agents that are a threat to human
health or life.
ii. Dispose of clean–up material into the plastic disposal bag based on the labelling Bio-hazardous Waste
and securely tie for proper disposal into a biohazard waste container.
iii. Disinfecting of spill area must be accomplished by using any acceptable disinfectant solution.
NATURAL DISASTER:
i. Inform to the Site Main Controller, Incident Controller and Communication Officer.
iii. Evacuate the work place and assemble at nearest safe assembly point.
iv. Fire fighters and First aiders to render their service to the affected personnel.
vi. If emergency is out of control seek the help from local Government authority.
Page 26 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
RESCUE TEAM
i. Upon hearing the hooter or message on PA system, stop the work
ii. Report to the head of department before leaving to attend emergency control operations.
iii. Carry at least one fire extinguisher, Stretcher resuscitator while leaving the place.
iv. Report to the incident controller of the site.
v. Carry out emergency control operations as per the instructions from incident controller.
Refer: ERT member list updated in Exhibit-C
Note 1: In Indoor fires, stay close to the door. Take a crouching posture, to minimize the effects to of smoke
and heat.
Note 2: Do not use water type extinguisher on electrical, metal and liquid fires.
f. Watch for the hissing sound, and on hearing the same, count five.
g. Press the squeeze grip nozzle and direct the powder near the seat of the fire.
h. Progress forward, moving the nozzle rapidly with a side to side sweeping motion as the pressure
drops.
Page 27 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
i. Fight the fire till the flame disappears. Watch for rekindling
Note 1: At times piercing pin when punched may get stuck to the rubber seal of the CO2 gas cartridge and
no hissing sound can be heard, on such occasions, pull the knob, instead of striking the same again
and again.
c. Lift ‘T’ handle from the socket and turn the pointer towards the grove on lid.
d. Twice turn upside down and fight the fire in an inverted position.
e. Direct the jet at the far inside edge of the container such that it spreads evenly and forms a foam
blanket on the burning liquid.
f. And if the fire is on the floor direct the jet to air and ensure it falls evenly on the liquid to form a foam
blanket.
h. Fight the fire till the flame disappears. Watch for rekindling.
Note 1: Do direct the jet directly into the liquid because that will drive the foam beneath the surface and
render it in-effective.
Note 2: Aim at the base of the fire to avoid splashing of burning liquid on to the surroundings and spreading
the fire.
Note 1: In Indoor fires, stay close to the door. Take a crouching posture, to minimize the effects of smoke
and heat.
Page 28 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Note 2: Do not use Water - CO2 extinguisher on electrical, metal and liquid fires.
i. Approach the hydrant point nearest to the place where fire has occurred and open the hose box.
ii. Remove the blank cap on the discharge end of the hydrant valve and connect the hoses to the
hydrant valve by means of the instantaneous spring lock couplings. To the free end of the hose,
connect the branch pipe with nozzle.
iv. Open the hydrant valve wheel. Hold the hoses firmly use buddy system.
v. Due to the drop in the pressure, the pump will start automatically.
vi. Fight the fire by directing the stream of water from the hose at the base of the fire. Depending on
the intensity of the fire, use one or two additional hydrants in the vicinity by following the steps
stated above.
viii. After the fire is extinguished close the hydrant valve, go to the pump room and switch off the main
pump and turn it back to auto condition.
ix. Also inform the local fire force authorities by dialing 101 and seek help from neighboring factories, if
they have a full-fledged firefighting system and team that can be used in such emergencies.
ii. Fill the grease/oil for bearings, if not done earlier. The bearings are packed with grease/oil initially
at the factory however the pump is stored for a longer time it is necessary to refill the grease/oil in
the bearings. Check the level of the oil in the constant level oil is up the mark.
iii. The sealing liquid connections are properly tightened and adjusted.
vi. The pump casing and suction pipe line is fully primed with the liquid.
Page 29 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
i. When the pressure drops below 5.0 kg/cm2, the jockey pump will start automatically.
ii. When the pressure drops below 4.0 kg/cm2, the main pump will start automatically.
iii. When the pressure drops below 3.0 kg/cm2 and the DB power supply is not available the DG
driven pump will start automatically.
d. During running the pump checks the following things and regulate, if necessary
iii. The gland is properly tightened to ensure sufficient leakage to dissipate heat generated. Maximum
permissible leakage is 60 – 80 drops per minute.
vii. Stop the pump immediately, if any defects are detected rectify the same. Do not start the pump
unless defects are rectified. Report immediately to the supplier, if it is not possible to the rectify the
defects in house.
i. Change the selector switch position “auto” position to “off” position in a main pump control panel.
ii. Change the selector switch position auto position to off position in a jockey pump control panel.
iii. Change the selector switch position auto position to off position in a Fire hydrant DG engine control
panel.
iv. Ensure that diesel in the Fire DG tank is filled with 85% level always.
ELECTRICAL INJURIES
i. Passage of electric current through the body may cause shock and/or burning.
ii. The shock may be relatively mild or so severe as to cause death depending on the strength of the
current passed and, on the path, passing to the earth through the body.
iii. A common result in electrical accidents is failure of the nervous system, while breathing. Breathing may
thus suddenly stop from paralysis of muscles respiration.
Page 30 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
i. If a person, who has received an electric shock is in contact with the apparatus the current shall be
immediately switched off. If the switch cannot be found immediately and the supply is through a flexible
cable, the current shall be cut off by removing the plug or by wrenching the cable.
ii. If it is not possible to switch off or break the current, the affected person should be removed from contact
with the current. The greatest care is necessary in doing so. If casualties are to be avoided, insulating dry
materials, like stick, rope etc., should be used.
iii. Unless the affected person is breathing normally, artificial respiration shall be immediately given and
continued for some hours, if necessary. No time shall be lost as every second counts. Artificial
respiration shall be given in the recommended manner.
- The complete cycle consisting of applying and releasing pressure shall be carried out at the rate of
about 12 to 15 times per minute.
iv. The victim shall be kept warm. He shall be kept covered while giving artificial respiration.
vi. If there are any burns, they shall be treated as under “Burns and Scalds”
vii. Immediately arrange for shifting the injured to the nearby hospital.
i. Any person who has received a serious injury may also suffers from physical shock.
ii. The victim shall be kept in recover position with his head higher than the rest of his body so that his brain
receives more blood.
iii. But in case of serve hemorrhage of the head, fractured skull or sunstroke, the head shall be in elevated
at higher position.
v. If the person is unconscious, nothing shall be given by mouth and any attempt to cause vomiting also
shall not be done. Loosen right clothing about the neck, chest and waist and passage provided for plenty
of fresh air.
vii. After controlling bleeding, if the person is conscious, stimulants shall be given by mouth or by inhalation.
FIRST AID
i. Employees should be familiar with methods of First Aid treatment so that a person who is severely
injured could be looked after better till the services of medical officer are obtained.
ii. Arrangement shall be immediately made for obtaining advice and services of a medical officer.
Page 31 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
iii. The following principles shall be noted in case of serious accident - If there are cuts and serve bleedings
is noticed, actions to be taken to stop bleeding.
iv. If breathing has stopped artificial respiration (CPR) shall be immediately provided.
vi. Substances given to him through the mouth would likely go into his lungs and cause choking.
vii. It shall be seen that the person is kept warm. An unconscious person becomes cold rapidly and chilling
of the body means a further strain on the already weakened vitality.
viii. Do not leave the person alone since help may be required at any point of time.
ix. Immediately arrange for shifting the injured to the nearby hospital.
SERIOUS BLEEDING
i. Bright red blood coming out from cut or wound in pulsations or spurts indicates bleeding from an artery
dark red blood coming out in continuous flow is indicative of bleeding from a ruptured vein.
ii. Arterial bleeding is more serious because of the rapid loss of blood. The flow of blood cannot be
stopped; pressure has to be applied by fingers and thumbs on the artery between the bleeding point and
the heart. The points where arteries come close to the surface of the skin are called the pressure points,
should be remembered and a tourniquet, if possible, shall be applied at these points to control bleeding
from the particular smaller arteries beyond. Before and while applying the tourniquet pressure shall be
applied on the cut by thumb and the thumb pressure shall be releases after application of the tourniquet.
iii. A tourniquet is made by stretching a handkerchief out by diagonally opposite corners and laying it around
the limb at the proper place with a wadded up handkerchief or bandage compressed under it and directly
on the artery feeding the wound. The tourniquet is tightened by inserting a pencil or stick in the
handkerchief and twisting it.
iv. If medical aid is delayed, the tourniquet shall be placed on the cut and pressure applied on the same.
v. Stimulants shall not be given until bleeding is controlled and not at all in cases of fractured skull.
vi. Immediately arrange for shifting the injured to the nearby hospital.
i. Burns injuries are caused by dry heat, passage of electric current, friction corrosive chemicals, etc., and
scalds caused by moist heat as from boiling water tar etc., there is immediate danger of shock from the
pain. The dangers of a burn increase with its surface area and if one-third or more of the skin area is
involved, the person may become serious.
ii. Action to be taken in case of burns and scalds from causes other than corrosive chemicals.
Page 32 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
iv. The contaminated clothing shall be removed as quickly as possible to prevent further injury.
v. If the burns are due to acid, the parts shall be washed freely with an alkaline solution (two spoons of
sodium bicarbonate or sodium carbonate in one pint of warm water) and if the burns are due to an alkali,
the parts shall be freely washed with weak acid solutions such as vinegar or lemon juice diluted with an
equal quantity of warm water.
viii. Burnt clothing shall not be removed and blisters shall not be broken.
ix. The burnt area including the clothing shall be covered with a clean linen sheet, if a sterile bed sheet is
not available.
xii. When the eyes are injured by corrosive chemicals, the eyes shall be flushed with copious quantities of
water. A soft pad of cotton wool shall be applied on the eyes and kept in position by a light bandage.
Medical aid shall be sought as soon as possible.
SNAKE BITE
i. If it is a known that the bite is from a poisonous snake, treatment shall be both prompt and rigorous to
prevent the spread of venom throughout the body and to neutralize the poison if possible.
ii. If bitten on a limb, circulation in the arteries and veins is immediately arrested by means of a constriction
placed round the upper arm or thigh between the wound and heart.
iii. The constriction shall be of rubber tubing or handkerchief tied loosely round the limb and tightened with a
stick.
iv. The constriction shall be kept in position for 20 minutes. Then released for a minute until the skin
becomes pink and again tightened. This procedure shall be repeated till medical aid is obtained.
v. After applying the construction, the wound shall be washed with a solution of Potassium permanganate.
If possible, a deep incision shall be made into the bitten area and crystals of Potassium permanganate
should be rubbed into it.
vii. Strong coffee, tea or milk shall be given, if the person is able to swallow.
viii. The person shall be reassured with encouraging words, as any alarm would seriously aggravate his
conditions.
Page 33 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
x. If the bite is elsewhere than a limb, where construction cannot be applied, incision shall not be done till
medical help is available.
Note: Antidote is available at SVMP OHC.
i. Fire escape doors is marked with nationally recognized fire exit signs and personnel must be able to
open a fire escape door in the event of an emergency.
ii. When doors are fitted with electric lock mechanisms, there needs to be a fail-safe way of opening them.
iii. On all Fire escape doors, an overriding mechanical release such as a crash bar is available. However, in
areas where security is of upmost importance this is not a complete safe option.
iv. Access Control system is integrated with fire alarm systems so that an alarm signal will alert the Access
System to automatically open doors during an emergency. However electronic equipment is highly
vulnerable to fire damage and potential failure, therefore, there must be an emergency override or fail-
safe method which involves cutting the power to the lock to ensure it releases in an emergency.
v. In the premises, access control door/area if fails to open via access card or exit button then only BREAK
THE GLASS of Emergency Door Release switch either with the help of hammer placed at the RED color
box or directly press on the EDR black dot.
vi. On pressing the EDR black dot, a yellow line will appear on EDR which indicates that the respective door
magnet supply has been isolated, and the door is released.
vii. If the power fails, or is interrupted by a fire alarm signal, the magnet loses power and releases the door
which can then be opened.
Note 1: Press emergency release switch provided inside each access control areas. (Individual/ employee
present inside the room/area)
Note 2: Switch off access power control mains to de-energise the magnetic doors. – (Engineering)
Note 3: Break glass options has been provided for larger access-controlled areas. (Individual/employee)
4. COMMUNICATION SYTEM
Page 34 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
iii. Dept. head should inform security personnel by dialing 1111/4444/5555 in plot 1, plot 2 & LVMP
respectively from any of the intercom about the emergency at the location. Security personnel to
announce emergency of the location and call for help from its safety squad.
iv. Send visitors, contract workers and casuals to their respective position.
vi. The announcement of emergency should be done by the department head / nominee as follows by
Dialing 1111 /4444 /5555 and Inform about the emergency and the exact location.
vii. Receptionist to address all the personnel through public addressing system.
viii. In case the departmental head, in his/her good judgment, presumes that the emergency is of greater
nature which needs to be communicated to all immediately, he/she (Receptionist) can announce the
emergency on the Public Address System.
xi. Evacuation will be announced by the site Main controller only if required and after assessing the
situation.
i. After confirming the control of on-site emergency with incident controller, the site controller will
announce the all clear message through public address system. All the personnel can re-enter and
restart the operations at the plant.
TELEPHONE MESSAGES:
i. Upon hearing the communication about emergency on PA system, receptionist should block incoming
calls and establish contact with Site Controller.
ii. As per instructions from Site controller, arranges to call outside agencies.
iii. Do not end the call from your end, wait till the person on the other side ends the call.
iv. Upon hearing call for evacuation, leave the seat by setting EPABX on ‘night mode’ to assembly point.
INFORMATION TO RELATIVES:
i. Keep ready the list of employees’ addresses for communication in case of injuries.
Page 35 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
ii. Collect the instructions from site controller and communicate to the relatives of injured personnel.
5. ACTION ON SITE
Page 36 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Page 37 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
II. FIRE
i. Avoid inhalation of smoke by product combustion. Use a wet cloth to cover your nose & mouth to
avoid inhalation of carbon monoxide.
ii. Communicate through PAS.
iii. Start firefighting by using fire extinguisher / fire hydrant system.
iv. Site controller / incident controller will decide for calling fire brigade.
v. Cool surrounding area, equipment, structures, tanks, cylinders, containers & drums by spraying water.
vi. Avoid water spraying on electrical system & water reactive chemical containers.
Page 38 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
The Employees will be trained regarding their specific role in case of emergency. The emergency response
topic was incorporated as a part of safety training program. The organization personnel’s will be trained of
their role in handling an emergency. The training services will be taken from National Safety Council, Loss
Prevention Association of India and other professional safety consultants if required.
Once in a month the Public-Address System is operated after prior information to all concerned.
6.2 REHEARSAL:
Rehearsals will be conducted to familiarize all the personnel concerned of the emergency that might occur in
an organization and about their duties and scenarios will be created for others to observe the actions during
such emergency. Two types of rehearsals are proposed:
Announced: Once in a year
Unannounced: Once in a year
i. Announced Rehearsal: Site Head will decide the date and time with a concurrence of Head Operation
& Q.A head and in consultation with EHS officer, group leader and production officer. A hypothetical
incident will be identified and communicated to all concerned in the organization for action on onsite
emergency and emergency is declared by Production in-charge. Production in-charge initiates action
for onsite emergency.
ii. Unannounced Rehearsal: Site Head will decide on the time and date with concurrence of Head
Operation. A hypothetical incident will be decided, and it will not be disclosed until the drill is
announced. In this group leader & EHS - Officer will enter the production block and handover a written
hypothetical incident to the shift in charge concerned for that area. Production in-charge initiates action
for onsite emergency.
iii. General: Rehearsal advisory team will be constituted, and they will note down the actions of various
coordinators in chronological order. The time of arrival of each coordinator and their duties will be
detailed in a note. Immediately after rehearsal the advisory team and emergency coordinators will meet
and review rehearsal records in chronological order and take note of corrective action. The record of
this meeting is circulated for compliance adherence.
Note: The Onsite Emergency Plan document shall be revised once in three years.
Page 39 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
7. LIST OF EXHIBITS
Exhibits # Particulars
Exhibits-C Emergency response team, fire fighting team first aider teams at ARPL
Exhibits-F Details of Fire Alarm Panels, Smoke Detectors and Public Addressing System at ARPL
Exhibits-G Fire hydrant system details
8. ABBREVIATIONS
Abbreviation Details
RH Relative Humidity
DG Diesel Generator
QC Quality Control
PD Process development
FD Formulation Development
QA Quality Assurance
HR Human Resource
WH Warehouse
Page 40 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Abbreviation Details
RA Regulatory Affairs
IT Information Technology
PE & AS Product Evaluation & Analytical Support
BMS Building Management system
ENGG Engineering
KL Kilo Liter
EC Emergency coordinator
SC Site Controller
ECC Emergency control center
OHC Occupational Health Centre
HOD Head of Department
PPE’s Personal Protective Equipment
MSDS Material Safety Data Sheet
API Active Pharmaceutical Ingredients
KM/H Kilo Meter Per Hour
Doc. Documents
PAS Public Addressing System
DCP Dry Chemical powder
SCBA Self-Contained Breathing Apparatus
IDLH Immediately Dangerous to Life or Health
RMG Rapid Mix Granulator
FBD Fluid Bed Drier
GF Ground Floor
FF First Floor
SF Second Floor
TF Third Floor
SC No. Stair Case Number
PROD Production
PAK & WH Packing & Warehouse
EDR Emergency Door Release
Page 41 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
9. REVISION HISTORY:
A 07-Oct-10 ARI/07/OSEP/2010/A NA
B 16-Jan-09 ARI/06/CCF/2008/483 NA
A 01-Sep-06 ARI/06/CCF/2006/108 NA
Page 42 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Page 43 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Page 44 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Incident Controller (IC) – Bio Lab Mr. Aslam Khan 95380003337 1890
Incident Controller (IC) (Alt.) – Bio Lab Mr. Sampath Kumar 9538601275 1306
Incident Controller (IC) (Alt.) - Clinic Mr. Shva Kumar revoori 9538601113 1378
Incident Controller (IC) (Alt.) – Quality R&D Mr. Pavan Peddinti 9538601320 1375
Page 45 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Page 46 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Incident Controller (IC)– Microbiology Mr. Biju Kunnath Mathew 9538863018 1928
Incident Controller (IC) (Alt.) – Packaging Mr. Ashis Kumar Khanrah 9538814543 1129
Incident Controller (IC) (Alt.) –Warehouse Mr. Sunil Singh 9538811150 1262
Page 47 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Page 48 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Page 49 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Page 50 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Page 51 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
1128
Page 52 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Fire 101
HOSPITAL
POLICE
Police 100
PRESS
NEIGHBOURING INDUSTRIES
Page 53 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Page 54 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
LVMP
S. No of Zones / Smoke
Panel location Hooters MCP
No. Loop Connected Detectors
1.
LVMP GF EHS Office 7 Loops 472 18 17
2.
LVMP FF Service area 7 Loops 487 11 11
3.
LVMP TF Service area 7 Loops 413 12 15
4.
LVMP New boiler house electrical panel area 1 Loop 29 3 5
Total 1401 44 48
BEC
S. No of Zones / Smoke
Panel location Hooters MCP
No. Loop Connected Detectors
1.
Clinic reception near board room 12 Zones 206 5 6
2.
BEC Clinic FF near ICU Room 12 Zones 226 4 4
3.
GF- Bioanalytical Lab Electrical room 11 Zones 171 4 3
4.
FF- PE&AS Service room 11 Zones 154 6 5
5.
SF- CSL Lab Electrical room (EST panel) 1Loop 59 4 3
Total 816 23 21
SVMP
S. No of Zones / Smoke
Panel location Hooters MCP
No. Loop Connected Detectors
1.
SVMP GF Production Corridor Lenin room opposite 10 Zones 162 12 8
2. SVMP GF Reception 2 Loop 80 6 7
Page 55 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
3.
SVMP FF PD Block AHU room 2 Loops 149 10 9
Total 391 28 24
Page 56 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
Note:
All three fire hydrant systems individually interconnected with APIPL fire hydrant system.
7.0 Kg/cm2 pressure can be attained during Emergency through all pumps.
Page 57 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
SVMP
W-CO2 9 L
M.F 50lits
C02 4.5kg
ABC 500g
DCP 10kg
DCP 25kg
ABC 1kg
ABC 4kg
ABC 5kg
ABC 6kg
DCP 5kg
C02 2kg
M.F 9L
22.5kg
Total
C02
LOCATION
1st FLOOR 0 0 0 0 0 0 2 1 0 0 2 0 0 5
ARD 0 0 1 0 0 0 0 7 0 0 3 0 2 0 13
UTILITIES AREA FF 0 0 0 0 0 0 1 12 0 0 7 0 1 0 21
UTILITIES AREA MF 0 0 0 0 0 1 2 0 0 0 0 0 0 0 3
STABILITY AREA GF 0 0 2 0 0 0 0 2 0 0 0 0 0 0 4
FD 0 0 0 0 0 0 6 5 0 0 5 0 0 0 16
PILOT PLANT 0 2 0 0 0 0 2 0 0 0 0 0 0 0 4
PRODUCTION AREA 0 0 0 0 0 0 0 6 0 0 0 0 0 0 6
WAREHOUSE 0 0 0 0 0 0 2 3 0 0 6 0 0 1 12
UTILITY AREA GF 0 0 0 0 1 1 4 10 0 1 6 0 1 0 24
SPARE EXTINGUISHERS 4 3 1 1 0 1 1 2 0 0 0 1 0 0 14
Total 4 5 4 1 2 3 22 52 1 1 39 1 6 1 141
Page 58 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
LVMP
DCP 10 kg
DCP 25 kg
CO₂ 4.5kg
CO₂ 45kg
DCP 5 kg
ABC 1kg
ABC 2kg
ABC 4kg
ABC 5kg
ABC 6kg
ABC 9kg
M.F 50L
CO₂ 2kg
M.F 9L
Total
LOCATION
Page 59 of 60
APOTEX RESEARCH PRIVATE LIMITED, BANGALORE
ON SITE EMERGENCY PLAN
DOCUMENT NO.: ARI/07/OSEP/2022/H
BEC
ABC 0.5kg
DCP 10 kg
DCP 25 kg
M.F 50lits
CO₂ 4.5kg
DCP 5 kg
M.F 9lits
ABC 1kg
ABC 2kg
ABC 4kg
ABC 6kg
CO₂ 2kg
22.5kg
Total
CO₂
LOCATION
Bio Lab - GF 6 4 0 2 3 0 2 0 0 2 0 0 0 19
Clinic - GF 0 0 1 1 5 6 0 0 0 1 0 0 0 14
Clinic - BF 0 0 0 0 2 3 0 0 0 1 0 0 0 6
Total 23 9 1 6 22 18 24 2 28 8 1 3 1 146
Page 60 of 60