CED

D-CP-001

Clien
nt Procedure for Mo
odificattions P
Permit

1. PURPOSE
2. SCOPE
3. REFERENNCES
4. DEFINITIONS
5. PROCEDURE
6. SUBMISSSION AND D REVIEW PROCESS
7. TARIFF // FEES
8. APPLICABLE FORM MS / ATTA
ACHMENTS / SUBMISSION REEQUIREMENTS
9. APPLICABLE REGU ULATIONS
100.CONTACTS
111.EXCEPTIOONS
122.ATTACHM MENTS

Revision 02 Feb 201


15
9

Page 1 of 9
CED
D-CP-001

1. Purrpose

The mo odifications & fit out wo orks of the completed facilities which
have B Building Completion
Certifica
ate (BCC) within
w the jurrisdiction off Trakhees required
r to
obtain
o
Modiification Perrmit from
Modificaation Sectio on of TRAKHEES-C Civil Engineeering Division
(CED) on their proposed

p
modificaation plans, designs and drawiings of the e facility prrior
to the commence ement of
construcction / fit outt works.

Modifica
ations Perm mit may be is
ssued with ccomments and a it remains the
appliicant’s respoonsibility
to ensure that all th
he commentts are comp plied with. Any non-confformity
with the requirem

ments of
the Moddification Permit may lea
ad to delayss in approvall of issuing the
same.

ope:
2. Sco

All clien
nts operating
g under Trak
khees jurisdiiction area.

3. Refe
erences:

• Application Formss
• CED B Building Reg gulations & Design
D Guid
delines (Archh & Structura
al
Code)
• Regula ations & Dessign Provisioon for Peoplle with Disability
• EHS E Environmenttal Control Rules
R & Reg ulations
• Healthh, Safety & Fire
F Protectio on Regulatioons and Staandards
• EHS E Environmenttal Nuisance e Regulationns
• EHS F Food Establishment guid delines
• Green Building Re egulations fo
or Dubai Wo orld Developpments
• Technical report Format
F
• Certificcate of Confformity

4. Definitions:

ms
Acronym
• CED Trakkhees Civil Engineering
E g Division
• EHS Trakkhees Enviroonment, He alth and Saffety Departm
ment
• BCC Building Completion Certificcate
• MCC Moddification Co
ompletion Ceertificate
• BRDG Building Regulaations & Dessign Guidelin
nes
• EHSR EHSS Regulation ns
• MP Moddification Pe
ermit
• MPS Moddification Pe
ermit System
m

5. Procedure:

The Mo odification section is iss suing Modiffication Permit for existing


Buildin gs & Prope

erties for
which thhe Building Completion Certificate has been is ssued. The
operations tasks of thee section
are pressented in fivve types of re proval process as listed below:
eview & app
Revision 02 Feb 201
15
9

Page 2 of 9
CED
D-CP-001

• New Modiffication Permit‐ Any m modification to existing


facility afte r obtaining Building
Completion n Certificate shall have Modificatio on Permit to
commencce any mod dification
works.
• Revalidatioon of Modiffication Per mit –Modiffication Perm
mit shall bee revalidated, if the
works are nnot complete
ed within thhe validity peeriod of the Permit.
• Cancellation of Modification Perm
mit – If for aany reasons the modificcation works cannot
be carried oout, then M Modification
Permit shall be cancelled, to obtaiin the refun nd of the
Contractor’s refundable e deposit.
• Amendmen nt of Modification Perm mit‐ The mod
dification peermit shall bbe amended d if there
is any changge in the Consultant/Coontractor/ Cllient /chang
ge in name oof the compaany etc.
• Revision too Modificattion Permitt – Prior to o obtaining
the Modiffication Com mpletion
Certificate, if there is any changee in scope
e of work (a

addition/ deeletion/ chaanges in


details) duee to the Clie ent requirem ment or site
conditions, approval shhall be obtaained for
the revision
ns.

bmission an
6. Sub nd Review Process:
P

The connsultant/conttractor appoointed by thee client shall submit their


documentts & drawing gs in soft
copies as per the submission n requireme ents in a CD in PDF format f
only at Trakhee es- CED
Reception located at Dragon MartM – Firstt Floor or EHS Departm ment
at Jebbel Ali. The name of
relevantt Consultannt, Contracto or, Client & BU, Facility/Plot No./
Location, Subject, Date of
Submisssion should be written on the CD D as per the e attached te
emplate. Iff the client intend to
carryoutt modificatio
ons / fit out within theirr facility, the
e submissio on
drawingss should inc clude the
previoussly approveed drawings s or layout from Trakh hees-CED showing
s
thee existing approved
a
works. AAlso the prroposed dra awings shou uld highlightt modificatio ons &
appliccable chang ges with
cloudingg along withh drawing number & co orrect revision number, etc in
PDF F format. In case of
resubmissions base ed on our suubmission reeview reportt it should be e
clearly higghlighted with title as
a resubbmission witth changes incorporatin ng the prev vious submiission
review w commentts & the
referencce number ofo the previous submissiion including g the revisio
on
number oof the drawin ngs.

6.1 Mod
dification Pe
ermit

6.1.1 The consultant/contrac ctor appoin nted by the e client shaall


submit ttheir docum ments &
drawings in soft copies as per the ssubmission requirementts on the
ap plication forrm.
6.1.2 The docum ments submittted shall be e checked by the Help p Desk
Adm ministrator and if the
documents are in orde e registered in the Modification
Pe rmit System
er it shall be
m (MPS).
Required pa ayment advice for the i nitial fee shhall be generated
and ssent to the submitter

s
for making the
t payment.
6.1.3 Upon fee pa ayment, Mo odification Peermit System m (MPS) will update
thee payment details

d in
the system. System generated ema ail with the submission
s
reference nnumber shall be sent
to the Clie ent and th he Contracttor/ Consultant confirming the
aacceptance of the
applicationss. The applic
cation is pro
ocessed furth her in MPS to
t Review
P Process.

Revision 02 Feb 201


15
9

Page 3 of 9
CED
D-CP-001

6.1.4 Review Eng gineers of CED


C & EHS divisions sh hall review thhe
submissiion as per Trakhees

T
rules and reegulations and
a other re elevant code es. Upon co
ompletion off submission n review,
the Trakhee es commentts and paym ment notifica ations for the
Modificatiions Permit shall be
sent through h email to cooncerned Co onsultant / contractor
c orr
client throuugh MPS.
6.1.5 Response to t the Trakh hees comme ents from th he consultan
nt / contracttor or client shall be
clearly addrressed and shall
s be subbmitted to Trrakhees.
6.1.6 For re-submission, on nly relevan nt documen nts shall be e
submittedd and not all the
documents.. For clarific cation of Trrakhees com mments, the e
consultantts / clients or client
shall co-ord
dinate (if reqquired) and rrespond to the t commen nts
providedd to them. It remains
the Consulttant’s/contac ctor’s/client’ss responsibbility to follow
up and rresolve the pending
issues.
6.1.7 When the review proce ess is comp pleted, the Modification
M
Permit with approved drawings

d
shall be colllected afterr paying the e remaining CED & EHS fees,
refuundable dep posit and
fee for Certiificate of Co
onformity, if aapplicable.
6.1.8 The fee no otification will be sent to the appllicant throug gh
MPS annd after making the
payment, thhe applicantt shall collecct the appro oved drawings &
Modifiications Perrmit from
CED at Dragon Mart-First floor.
6.1.9 The Modificcations Perm mit approvall shall take 5-10 workin ng
days staarting from the initial
payment da ate to issue of the app roval for the e proposed
modificatio ns works su ubject to
satisfactory submission n of docume nts.

6.2 Revvalidation off Modificatio


on Permit

6.2.1 The Modificcations Perm mit shall reequire to bee revalidated d if


modificaation works are not
completed within
w six (6)) months fro
om the date of issuance of
Modificattion Permit.
6.2.2 Consultant/Contractor/C Client subm mits a requeest for the
revalidation
r
of the Mod dification
Permit with required doocuments ass per the app plication form
m. The
Helpp Desk Administrator
shall checkk the documents and enter in MPS. Requ uired
paym ent advice for the
revalidation fee shall be generatted and sent to the Consultant/C
C
Contractor/CClient for
making the payment.
6.2.3 Upon fee payment,
p Moodification P
Permit Syste em (MPS) willw move
thhe applicatio on to the
review proccess. Help de esk Adminisstrator prepa
are the Reva
alidated Moddification Pe

ermit and
forward it in
n MPS to the
e approval o of the Modific
cation Sectioon
Managerr.
6.2.4 Upon app proval the Revalidatted Modific cation Perrmit will
be sent to the
Consultant/Contractor/C Client by emmail through MPS.

6.3 Cancellation off Modificatio


on Permit

6.3.1 To allow and enable the e Consultannt/Contractorr/Client to ca


ancel an
issuued Modification
Permit only if the works
s have not be d on site.
een initiated
6.3.2 Consultant/Contractor/ Client submmit a requestt for the Can
ncellation
of the Modificaation
Permit. Thee Help Desk Administrattor shall rece
eive the appplication
form

m and the
documents as per subm mission requ
uirements an nd if the Doc
cuments
aree in order it shall
s be
registered in
n the system
m. Required payment ad dvice for the
cancellationn fee shall be

b
generated for
f making th he payment..

Revision 02 Feb 201


15
9

Page 4 of 9
CED
D-CP-001

6.3.3 Upon fee pa ayment, Mod dification Peermit Systemm (MPS) will
update the payment de etails in
the system. System gen nerated ema ail with the submission
s
reference
r
nuumber shall be sent
to the Client and the Co ontractor/ Co onsultant coonfirming thee
acceptancee of the app plication.
6.3.4 Site Inspecttor shall visit the concerrned facility to check wh
hether or nott the proposed
works have been initiated / comple eted on site and
a the Insp
pection repoort is entered d into the
system.
6.3.5 If the workss have not be een initiated
d on site, theen the Admin
nistrator is nnotified to prrepare
the cancellaation letter along
a with infformation reelated to the
claiming off the refunda able
deposit.
6.3.6 If the workss have been initiated or e even comple eted on site,
then the reequest is reje ected
and the Clieent/Contracttor is notifiedd to complette the approval
process by applying g for the
Modificationn Completion n Certificate
e.

6.4 Ameendment off Modificatio


on Permit
6.4.1 To amend ana issued Modification
M P
Permit due to
t change inn client /
conntractor / con

nsultant,
change in th
he companyy name or anny other corrections.
6.4.2 Help Desk Administrattor shall rece eive the appplication form
m
along withh the docum ments for
the amendm ment. Requiired paymen nt advice for the fee no
otification shhall be gene

erated by
the MPS and sent to the submittter by email for makin ng the
paym ment along with the
submission reference.
6.4.3 Upon fee pa ayment, Mo odification Pe ermit Systemm (MPS) will update
thee payment details

d in
the system.. System ge enerated em mail shall bee sent to thee
Client/ Coontractor/ Coonsultant
confirming the
t acceptance of the a application. MPS shall forward
the aamendmentt request
to the Modiffication Adm
ministrator.
6.4.4 The Modificcation Admin nistrator will carry out th
he amendment and
forw ward the permit

p to
the review of
o Modification Managerr.
6.4.5 Once the amended MP P is approve ed by the Modification
M
Manager,
M
auuto generate

ed email
shall be sennt from the MPS to the e Client/Contractor/ Con
nsultant by eemail along with the
Amended Modification
M Permit.

6.5 Rev
vision to Moodification P Permit
6.5.1 In case of fu urther revisio
on needed bby the clientt after the iss
suance
of M

Modification Permit,

P
the applicannt has to follow the sam e application procedure e as
mentionned in 6.1 along with
the referencce of the pre
evious approoved Modificcations Perm mit
drawingss & documen nts.

Revision 02 Feb 201


15
9

Page 5 of 9
CED
D-CP-001

6.6 Clarrifications/M
Meetings: Clarifications on the Trakkhees – CED
D Permit
commments sha all be
enteertained thro
ough schedu uled meetinggs at Trakheees – CED main
m
Buildingg from 9:00 am to
3:000 on all workking days by
y prior appoi ntment. Reg
garding EHS
S commentss
meeting ca an be
scheeduled as pe er EHS proccedures.

RIFF / FEES
7. TAR S

The Modification Pe
ermit charge
es for CED a
are as per th
he following:

Modiffications R
Review chargge
Min fees charges Refunddable
Permiit Review Unitt fo
or each sq.m
m
(AED) Deposit (AED)
charges (AED)
Staandard
chargees, per sq.
m of the total Per sq. meter
m 5.4
500 250

00
ations area
modifica

8. APP
PLICABLE FORMS
F / AT
TTACHMEN
NTS/ submiission requirements:
All the required appplications forms
f and ssubmission requirements for
Modiffications Pe

ermit are
available in Modifica
ation Compliance Sectio
on page at Trakhees-
T CED
C websitee:
www.traakhees.ae

PLICABLE REGULATIO
9. APP R ONS:

• Blue Code - Building Regulations


R s and Desiggn Guidelinnes
• Green Code - Construuction Mateerials Qualitty Control Guidelines
G
• Red Code - Marinas and Small C raft Harbou ur Regulatioons and
Deesign Guide

elines
• Yellow Cod
de - MEP Seervices Reggulations an nd Technical Guidelinees
• Turquoise Code – Reg gulations a nd Design Provisions for People with
Disabbilities

10. CON
NTACTS:

Modifica
ations Comp ees – CED Tel: 04-448
pliance Secttion – Trakhe 85962/994

E-mail: Ced.Modificcations@Tra
akhees.ae

Revision 02 Feb 201


15
9

Page 6 of 9
CED
D-CP-001

11. Exc
ceptions:

The pro
ocedure is no
ot applicable
e to the follo
owing activitiies:

11.1 Internal Wa all Finishes//Painting: A


Any final finish over thee
existing w wall using deecorative
materials such
s as tile, stone, wall paper, woo oden veneerrs,
painting, etc. (This comment

c
is not applicable to industrial unit & food outletts).
11.2 Furnishingss: Any mov vable piecess of furnitu ure that aree
placed witthin an are ea to be
modified
11.3 Low heightt partitions Dry
D wall parttitions that are
a common nly
used for constructing g interior
walls using
g panels mad de of gypsu m plaster, glass,
g aluminnium
or simiilar. These partitions

p
should not exceed the height of 1 .8 meter oth herwise theyy will
requiree obtaining approval

a
for it.
11.4 Flooring: Term used for an ad dditional surface coverr that
is e ither perma anent or
removable over the ex xisting structtural slab an
nd includes
material suuch as ceram mic tiles,
wood floorring, stone, terrazzo, vvinyl, carpe ets and varrious
seam less chemic cal floor
coatings.( This
T comme ent is not app
plicable to in
ndustrial unit and
food uunits)
11.5 Replacing existing windows & d oors (in dry y walls):
Reeplacing of internal do oors and
windows that are loc cated in exxisting walls s, without changing
c
thhe geometry y of the
ame.
opening/fra
11.6 Racking syystem witho out mezzan nine levels oro walkways above
flooor levels as a minor
modifications.

12. Atta
achments:
12.1 Flow chart
12.2 Template for
f CD cover

Revision 02 Feb 201


15
9

Page 7 of 9
CED
D-CP-001

12.1 Flow Chart

Revision 02 Feb 201


15 9
Page 8 of 9
CED
D-CP-001

CD Cov
ver Templatte

Revision 02 Feb 201


15
9

Page 9 of 9

You might also like