Auto clove Checklist

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

Auto Clove Checklist

Ref # EHS-SBF-
ENVIRONMENT, HEALTH & SAFETY

Auto Clove Checklist should be completed on daily basis throughout the duration of the
works.

Location: .............................................................................................................................

REVIEW DATE: …………………


QN = Question Number
QN Questions Yes No N/A

1 Is Ventilation adequate
2 Area is clean & tidy
3 Panel boards are safe and clean
4 Is lighting adequate
5 Are the Electrical wires in good condition
6 Can the electrical supply be easy isolated
7 Manual valve and Automatic valve moving easily
8 Are Vaccum valve in good conditions
9 Are Gaskets and other parts tightly fixed
10 Is Line steam pipe not leaking
11 Emergency exits are available
12 Are Emergency exits are safe
13 Auto clove room is clean
14 Check the auto clove seal
15 Are valve properly closed
16 Is lubricant applied
17 Is lubricant soap is applied
18 Is roller clean and checked
19 Is auto clove clean from inside
20 Awareness of Hazards area
21 Are railway tracks not broken
22 Is safety apron available
23 Is steam temperature not higher than 190 degree
Any Other Observations or Comments

Actions are required for all NO answers above.

QN Corrective Action Required Responsible Date Closed

Completed and Verified by:

Noor Ahmed Shaikh


EHS Officer _______________________ Sign

You might also like