TARGET SISA PEKERJAAN

13-19
NO ITEM PEKERJAAN
13 14 15 16 17 18 19
MAIN JETTY
1 Pancang Sheet Pile (sis 10 10 10 10 11 11 11
2 Instal Beam
3 Instal Tie Rod
4 Sirtu (120x30x7)
5 Boulder (120x30)
6 Fender
7 Bollard
8 Cathodic
CAUSEWAY
9 Boulder 8 8 8 8 8 8 8
10 Sirtu 8 8 8 8 8 8
11 Geotextile
SECONDARY JETTY
12 Batu Boulder 6 6 4
13 Pasang Plat 6 6
14 Geotextile 6 6 6
15 Sirtu 6 6 6
ELECTRICAL
15 Lampu PJU
16 High Mass
17 Distribution Panel
18 Instalasi Jaringan all
19 Instal Bouy
20 Pondasi dan Instalasi Menara Suar
STOCKPILE
21 Clearing
22 Timbunan Tanah
23 Pembentukan Jalan Lingkar dan Saluran
24 Pemasangan CSP tiap persimpangan
20-26 27-31
20 21 22 23 24 25 26 27 28 29

11 11

8 8 8 8 8 8 8 8 8 8
8 8 8 8 8 8 8 8 8 8
27-31
30 31

8 8 152
8 8 144