TARGET SISA PEKERJAAN

13-19
NO ITEM PEKERJAAN
13 14 15 16 17 18 19
UNDER STRUCTURE
1 Backwall A1
2 Kolom Pier P1
Pembesian
Bekisting
Pengecoran
3 Pier Head P1
Pembesian
Bekisting
Pengecoran
4 Wingwall dan Plengsengan A1
Bekisting
Pengecoran
5 Wingwall dan Plengsengan A2
Bekisting
Pengecoran
UPPER STRUCTURE
6 Plat Injak Oprit
Pembesian
Bekisting
Pengecoran
7 Parapet Wall (Oprit)
Pembesian
Bekisting
Pengecoran
8 Lantai Jembatan (Approach Slab)
Pembesian
Bekisting
Pengecoran
9 Concrete Barrier (Beton pelindung)
Pembesian
Bekisting
Pengecoran
10 Expand Joint (railing, guard rail)
11
ERECTION GIRDER
1 Girder A2-P2
Span 3
Span 4
Span 5
Span 6
2 Girder P2-P1
Span 1
Span 2
Span 3
Span 4
Span 5
Span 6
3 Girder P1-A1
Span 1
Span 2
Span 3
Span 4
Span 5
Span 6
20-26 27-1 April
20 21 22 23 24 25 26 27 28 29
27-1 April
30 31 1