Question Who has responsibility to ensure that the


1 organization’s procedures and standards are
complied with when carrying out line
Correct maintenance?

Mark 1.00 out Select one:


of 1.00
a. Quality Control Manager
b. Line Maintenance Manager 
c. Base Maintenance Manager

https://lms.vietjetair.com/mod/quiz/review.php?attempt=604360&cmid=113516 14 46 31/01/2024
Trang 1 / 11
:
Question Procedures for the Work Performed Away
2 From Fixed Locations, who will coordinate
with the Line Maintenance Manager to
Incorrect prepare the work plan?

Mark 0.00 out Select one:


of 1.00
a. PCC Manager
b. Base Maintenance Manager
c. Both answers 

Question If lost item is found or further solution


3 approved, who shall be responsible for
record result in Lost/ Damaged Tool/
Correct Equipment Report (form MXF 234) and send
to Line Maintenance Manager, Base
Mark 1.00 out Maintenance manager, Store Manager and
of 1.00
QC team within 24 hours.

Select one:
a. The respective manager 
b. The respective CRS
c. Workshop Manager

Question Who will monitor and assess the technical


4 condition of equipment and tools, propose
maintenance and repair solutions and further
Correct utilization?

Mark 1.00 out Select one:


of 1.00
a. Workshop Manager 
b. Store Manager
c. Line Maintenance Manager

https://lms.vietjetair.com/mod/quiz/review.php?attempt=604360&cmid=113516 14 46 31/01/2024
Trang 2 / 11
:
Question If the specific tooling is not available, can VJC
5 AMO use alternate tooling (tools, equipment)?

Correct Select one:


Mark 1.00 out a. Yes, alternate tooling may be used
of 1.00 based upon manufacturer’s data or other
acceptable data, provided the
documentation is available. 
b. No

Question Which statement is true?


6
Select one:
Correct
a. Leaving blocks blank of maintenance
Mark 1.00 out documents is not allowed 
of 1.00
b. Leaving blocks blank of maintenance
documents is allowed

Question Working shift for base maintenance is:


7
Select one:
Incorrect
a. 06 hours
Mark 0.00 out
b. 08 hours
of 1.00
c. 12 hours 

Question In Normal Task, Shall Mechanic perform work


8 step(s)/ subtask(s)/ task without direct
supervision of certifying staff CAT B1, B2, B1/
Correct B2 Support staff?

Mark 1.00 out Select one:


of 1.00
a. Yes
b. No 

https://lms.vietjetair.com/mod/quiz/review.php?attempt=604360&cmid=113516 14 46 31/01/2024
Trang 3 / 11
:
Question Re- Certified Certificate (form MXF203) used
9 for:

Correct Select one:


Mark 1.00 out a. to confirm unserviceable status of parts
of 1.00 which are removed after robbery, removal
for return to owner or hold
b. to confirm serviceable status of parts
which are removed after robbery, removal
for return to owner or hold 

Question What is VAR stand for?


10
Select one:
Correct
a. Vietnam Aviation Regulations 
Mark 1.00 out
of 1.00 b. Vietnam Aviation Request
c. Vietnam Aviation Requirement

Question Follow TIM No.2023-13, Maintenance Records


11 Finding 1, what is root cause of this finding?

Incorrect Select one:


Mark 0.00 out a. The certifying staff did not comply with
of 1.00 MME 2.1.1.5F during the recorded TLB.
b. The certifying staff did not comply with
LMM 2.26.4.2-h) during the performed
critical task. 
c. The certifying staff did not check for an
existing ADD in the ADD sheet/AMOS
system before raising a new ADD.

https://lms.vietjetair.com/mod/quiz/review.php?attempt=604360&cmid=113516 14 46 31/01/2024
Trang 4 / 11
:
Question When it has been verified that all
12 maintenance ordered has been properly
carried out”, does it necessarily means that
Incorrect certifying staff have to perform or supervise
the whole process of every task?
Mark 0.00 out
of 1.00 Select one:
a. Yes 
b. No

Question Who shall coordinate to MOC, Planning,


13 customers to analysis of Work Order, Work
Package to ensure the requested
Correct maintenance remains within the approved
scope of approval?
Mark 1.00 out
of 1.00 Select one:
a. PCC Manager 
b. Base Maintenance Manager
c. Base Maintenance Manager

Question Who will ensure that the external working


14 team are trained or briefed on the VJC safety
and security procedure that have an impact
Correct on the work to be undertaken?

Mark 1.00 out Select one:


of 1.00
a. Base Maintenance Manager or his
delegate
b. Line Maintenance Manager or his
delegate
c. Both answers 

https://lms.vietjetair.com/mod/quiz/review.php?attempt=604360&cmid=113516 14 46 31/01/2024
Trang 5 / 11
:
Question Who has responsibilities of Establishing the
15 Maintenance Program for all tool/ equipment
used in Line, Base and workshop that
Incorrect required specific maintenance

Mark 0.00 out Select one:


of 1.00
a. Store Manager 
b. Workshop Manager
c. Line Maintenance Manager

Question Who will contact to PCC immediately by any


16 means of communication e.g., telephone,
Viber, company Workchat etc. to inform about
Correct the occurrence and to provide relevant
information as much detail as possible?
Mark 1.00 out
of 1.00 Select one:
a. Certifying staff, B1/B2 Support staff who
finds any occurrences, defects or
malfunctions as specified in MOPM
paragraph 3.8.5 on aircraft, engine,
component during maintenance or as
result of flight crew reported and/or made
technical log entry. 
b. B1/B2 Support staff who finds any
occurrences, defects or malfunctions as
specified in MOPM paragraph 3.8.5 on
aircraft, engine, component during
maintenance or as result of flight crew
reported and/or made technical log entry.
c. All mechanic staff who finds any
occurrences, defects or malfunctions as
specified in MOPM paragraph 3.8.5 on
aircraft, engine, component during
maintenance or as result of flight crew
reported and/or made technical log entry.

https://lms.vietjetair.com/mod/quiz/review.php?attempt=604360&cmid=113516 14 46 31/01/2024
Trang 6 / 11
:
Question Who has responsibility to Highlight any critical
17 tasks including ADs and Mandatory Service
Bulletins and all other additional special
Incorrect inspections on SBs or other publications to
the Certifying staff CAT C during the pre-input
Mark 0.00 out meeting before the maintenance check?
of 1.00
Select one:
a. Dock Planner
b. Base Maintenance Production Planner

c. Technical Support

Question Which are root cause of MQA-IR-2023-03?


18
Select one:
Correct
a. Lack of communication and awareness
Mark 1.00 out and Time constraints
of 1.00
b. Complacency and Normal practice
c. Both Answers 

Question Working shift for line maintenance is:


19
Select one:
Correct
a. 06 hours
Mark 1.00 out
b. 08 hours
of 1.00
c. 12 hours 

Question Which Vietjet Procedure is corresponding


20 with CAAT MOE?

Incorrect Select one:


Mark 0.00 out a. VJC MOPM
of 1.00 b. VJC MOPM supplement
c. VJC CAAT MOE 

https://lms.vietjetair.com/mod/quiz/review.php?attempt=604360&cmid=113516 14 46 31/01/2024
Trang 7 / 11
:
Question Follow TIM No.2023-13, Maintenance Records
21 Finding 3, what is root cause of this finding?

Incorrect Select one:


Mark 0.00 out a. The certifying staff did not comply with
of 1.00 MME 2.1.1.5F during the recorded TLB.
b. The certifying staff did not check for an
existing ADD in the ADD sheet/AMOS
system before raising a new ADD.
c. Both answers 

Question Follow TIM No.2023-13, Maintenance Records


22 Finding 6, what is root cause of this finding?

Incorrect Select one:


Mark 0.00 out a. Maintenance staffs did not follow to the
of 1.00 LMM 2.5; LMM 2.6 (INOP Placard) when
completing the maintenance document.
b. The certifying staff did not comply with
MME 2.1.1.5F during the recorded TLB.
c. Both answers 

Question In Normal Task, can mechanic write company


23 ID number and sign on the work step(s)/
subtask(s)/ task in “MECH” column?
Correct
Select one:
Mark 1.00 out
of 1.00 a. Yes 
b. No

https://lms.vietjetair.com/mod/quiz/review.php?attempt=604360&cmid=113516 14 46 31/01/2024
Trang 8 / 11
:
Question Follow TN No.2023-0095, When perform
24 maintenance tasks, in which refer to the AMM
TASK 80-11-00-210-801-A, shall authorized
Correct staff use the current AMM REVISION 01-NOV-
2023
Mark 1.00 out
of 1.00 Select one:
a. Yes
b. No, make sure to use the ADVANCE
COPY REVISION 09-NOV-2023 

Question In cases where the particular maintenance


25 step is not applicable or not carried out due
conditional in nature, what shall the
Correct authorized staff do?

Mark 1.00 out Select one:


of 1.00
a. Leaving blocks blank
b. Write down “N/A”
c. Write down “N/A” and stamp/
handwriting authorization number in such
steps. 

Question Who has responsibility to Coordinate with


26 Dock Planner and Lao Airlines to arrange the
hangar slots based on the actual situation
Correct during base maintenance operation

Mark 1.00 out Select one:


of 1.00
a. Base Maintenance Production Planner

b. Technical Support
c. Facilities Controller

https://lms.vietjetair.com/mod/quiz/review.php?attempt=604360&cmid=113516 14 46 31/01/2024
Trang 9 / 11
:
Question In the case of base maintenance, who will
27 issue the Certificate of Release to Service?

Correct Select one:


Mark 1.00 out a. category A certifying staff
of 1.00 b. category B certifying staff
c. category C certifying staff 

Question Who has responsibilities of establishing the


28 Calibration Program in AMOS for all tool/
equipment that required calibration in the
Correct assigned area

Mark 1.00 out Select one:


of 1.00
a. Store Manager 
b. Line Maintenance Manager
c. Base Maintenance Manager

Question Follow TN No.2023-0097, From 24 NOV


29 2023, before release to service of an airplane
after a storage or parking period, if the
Correct affected batteries with FINs 2PB1, 2PB2 have
been in on-wing storage for more than 6
Mark 1.00 out months must they be replaced in accordance
with AMM ATA 10-10-00.
of 1.00

Select one:
a. Yes 
b. No

https://lms.vietjetair.com/mod/quiz/review.php?attempt=604360&cmid=113516 14 46 31/01/2024
Trang 10 / 11
:
Question Who shall be the person having the corporate
30 authority to ensure that all maintenance
activities of the organization can be financed
Incorrect and carried out to the standard required by
CAAV VAR Part 5?
Mark 0.00 out
of 1.00 Select one:
a. QA Director 
b. The Accountable Manager