425/525MW Nandipur CCPP

Production of morning meeting summary


Date: 24-Nov-23 Friday Shift Engineer: Mr. Ismail Omer

年累计发电量
月累计发电量 Annual 发电气耗率the gas
日发电量daily Monthly 厂用电率Auxiliary power
cumulative consumption per KWH Running hours
机组 power generation generating rate Net Efficiency
power (BTU/KWh)
Date Unit capacity
generation

(MWh) (MWh) (MWh) (HHV) (LHV) MWh (%) HHV % LHV % (hh:mm)

GT1 0 0 278864.734 0.00 0.00 6 0.00% 0.00% 0.00% 0

23-Nov-23 GT2 0 0 267635.71 0.00 0.00 0 0.00% 0.00% 0.00% 0

GT3 0 0 248798.518 0.00 0.00 6 0.00% 0.00% 0.00% 0

ST 0.000 0 454196.5909648 0.00 0.00 0 0.00% _ _ 0


Thursday
total 0.000 0.000 1249495.552965 0.00 0.00 12 0.000 0.00% 0.00% -

Date The main production event


• GT-02 fire protection system trip forced, due to Faulty card issue, CO2 is isolated due to Permits.
• WTP: Blow-down water basin pump-01 & 02 out of order
• GT-02 Wheel space thermocouple 2FO-1 is faulty.
• GT-03 Wheel space thermocouple 1FI-1 and 3FO-2 are faulty.
• GT-01,03 CCCW system expansion tank filling SOV faulty.
• LP feed water pump - 3 inlet filter DP switch found faulty, due to unavailability of spare. DP switch bypassed.
• HRSG-01 deaerator main level controller not available for DCS operation.
• HRSG-3 main deaerator level control valve not available for DCS operation.
• Sahowala-01 line side earth blue phase not closing properly.
• ST Gland Condenser Fan - A inlet MOV card faulty.
• ECR UPS-2 is under maintenance for short circuit alarm.
• ST HP bypass No.2 CV is not working well.
• HRSG-2 Diverter damper open 100% and its retaining pins are installed.
• Deep well pump-02 is not available for operation due to motor anti clock wise rotation inspection.
• HRSG-2 DD close limit forced and weather damper closed.

• Complex remained stand by due to unavailability of gas fuel.


• HRSG-1,2,3 HP/LP drum with superheater/ Preheaters wet preserved.
• GT-01 and GT-02 PEECC all breakers annual inspection, cleaning and tightening completed.
• GT-02 all instruments calibration is in progress by I&C.
• HRSG-1 HP live steam drain isolation valve welding is in progress by MMD.
• HRSG-2 all instruments calibration is in progress by I&C.
• HRSG-2 expansion joint (HRSG side) flue gas leakage inspection is in progress.
• ST condenser tubes cleaning is in progress.
23-Nov-23 • Cooling tower fans railing paint work is in progress.

Following PTW/TRs were reported.


TR-20243 CT MCC bus B 11 KV breaker transducer faulty
TR-20244 GT-1 MCC bus A 11 KV breaker transducer faulty
TR-20245 FOF MCC bus A 11 KV breaker transducer faulty
TR-20246 GT-2,3 MCC bus B 11 KV breaker transducer faulty
TR-20247 WTP MCC bus B 11 KV breaker transducer faulty
TR-20248 ST MCC bus A 11 KV breaker transducer faulty
TR-20249 Deep well MCC bus A 11 KV breaker transducer faulty
PTW-4158 issued and closed for GT-3 All breakers and 125v DC battery bank annual inspection
PTW-4159 issued and closed for Cooling tower/GT-1 MCC B and GT-1 MCC A 11KV breaker transducer replacement

Today's Operation schedule

No Content

Yesterday Maintenance Activities


No Unit Content Result
• (3.11/25) HRSG-2: Flue gas duct, welding activity to rectify the duct leakages is in progress. (PTW# 4146)
• (3.11/35) HRSG-1: HP Main steam drain MOV, installation activity of plug assembly performed.(PTW-4130)
• (3.11/35) HRSG-1: HP Main steam drain MOV, limit adjustment performed in coordination with EMD.(PTW-4130)
• (3.11/280) ST: lube oil line’s FF system at 1st floor, flange leakage could not be attended due to scaffolding constraints.
• (3.11/102) Vacuum p/p Hex-B, all plates gaskets replaced with new ones. (PTW-4150)
• (3.11/275) Workshop: FF system PRV, cleaning & inspection is in progress.
• ST: Condenser drain, flange leakage attended by tightening.
1 M • WTP: Housekeeping performed at WTP station and Sulfuric acid storage room. No observation
• CWP House: Housekeeping performed at CWP outlet valve hydraulic skids and Auxiliary temporary/booster pumps room.
• Colony Gate: Shed fabrication at colony main gate is in progress.

• Activity 3.11, Sr#226 Clean the interior of the 400V circuit breaker and apply conductive paste on the terminals in PEECC 3
(Completed)
• Activity 3.11, Sr#225 Cleaning & dust removal of Batteries sets in PEECC 3.(Completed)
• PTW# 4159 Cooling Tower MCC Bus-B new transducer installed.
2 E • PTW#4159 GT-1 MCC Bus-A new transducer installed. No Observation
• HRSG-3 Ground floor 5 lights replaced of 250 W and, 4 lights replaced of 150W.
• HRSG-1 HP main steam drain MOV limit adjustment performed.

• 3.11.236 & 237: GT-1,2,3 instruments calibration for transmitters & switches; GT-2 calibration at Auxiliary compartment is in progress
• GT -03 Turbine compartment hazardous sensor 45HT-iR-5B fault is normalized
3 I No Observations

· Inspection of WTP mcc ac units.


. Inspection of Mechanical office ac units.
. Inspection of Industrial waste water mcc ac units.
· Inspection of Firefighting mcc ac units.
. Inspection of EDG room ac units.
. ECR ac unit-2, outdoor fan units bearing replacement and installation performed.
4 HVAC . Support provided to MMD at vacuum pump hex-b gaskets replacement activity. No Observations

Today's Maintenance Activities


Content Content Remarks
• (3.11/25) HRSG-2: Flue gas duct, welding activity will continue to rectify duct leakages. (PTW# 4146)
• (3.11/372) GT-2: Inspection and cleaning of APU compartment and its equipment. (PTW required)
• (3.11/102) Vacuum p/p Hex-B, plates installation and run test will be performed. (PTW-4150)
• (3.11/279) EDG: EDG Firefighting deluge valve, inspection will be performed. (PTW required)
M • Colony Gate: Shed fabrication at colony main gate will continue.

• Activity 3.11, Sr#224 Cleaning & dust removal of 02 charger in PEECC 1 to 3 .(PTW required)
• Activity 3.11, Sr#234 Activity test of GT battery
E

•3.11.236 & 237: GT-1,2,3 instruments calibration for transmitters & switches; GT-2 calibration. (Work in progress).
I

· Inspection of PEECC-1,2&3 ac units.


. Inspection of ECR ac units.
. Inspection of Battery room ac units.
· Inspection of Co2 container ac units.
. Inspection of Electrical office ac unit.
HVAC . Inspection of Doctor room ac unit.

Plant Defects
No Content Reason
• HRSG-1,2,3: Bypass control valve passing (Shut down Job) (TR#6557)
• Compressor Room: Instrument & Service air comp-A&B, Suction filters choked. (Spares required)
• HRSG-1: HP Drum to Super heater sampling line leakage. (Complex Shutdown required)

• ST: Vacuum pump-A &B, heat exchanger water leakage. (Complex Shutdown required)
• ST: LP G.V control valve differential filter oil seepage. (Complex Shutdown required)
Mechanical • ST: Condenser rear side –A drain valve yoke found damaged. (Complex shutdown required) Spares/(S/D)
• ST: CEP-C, Thrust bearing lube oil level sight glass not available. (Spares required)
• Cooling Towers: CTF No.2, gear box lube oil level sight glass damaged. (Spares required)

•TR # 9756, GT01, UAT oil temperature wrong reading is showing. Winding temperature gauge BWY 804 is required
• TR # 16886, ECR, UPS 2 Alarm Short circuit @ high DC, spare required.
• TR # 16872, GT01, MW & MVAR transducer malfunctioning.
• TR # 13156, UPS output frequency not showing on DCS. Spare required.
• TR # 7066, ST Main T/F winding temperature fluctuating. Winding temperature gauge BWR 804 is required.
Electrical Spares
• TR # 3476, Bay control unit#03 device#02 display not showing reading, spare required.
• TR # 16568, GT Hall, Roof fan not working. Access issue.

•Firefighting water tank level transmitter wrong value. (Spare required)


• CW pump #A motor bearing temperature sensor. RTD sample given to HEPSEC (Spare Required)
• Air dryer # B in air compressor room line filter DP gauge found broken. (Spare required)
• HRSG-3 DA to bypass control valve faulty card and potentiometer (spare is required)
• HRSG-02 one camera card found faulty (spare is required)

GT#2 FD-2 coil is replaced from GT# 3 as it was found faulty (spare is required)
• WTP I/O panel #2 cards power supply failure; Cards backplane slot faulty. (Spare required)
• TR#13321: GT-1 UAT Aux transformer oil temp-01 faulty on DCS. Signal convertor device (temperature controller). (Spare required)
• ST duct air controller faulty. (Spare required)
• HRSG-02 HP/LP drum one camera power supply charger is found faulty (spare is required)
Instrument • HRSG-02 one camera card found faulty (spare is required) Spares
• ST bearing # 4 return lube oil RTD found defected (spare is required)
• ST AST block pressure Gauge isolation valve seepage observed after tightening there is still seepage continue, new isolation valve (spare is required)
•HRSG#1 diverted damper local controller display faulty (Spare required)
•CT fan# 5 multi sensor loop test performed and sensor found faulty. (spare is required)
•WTP Mix bed exchanger# 2 SOV passing found. (spare is required)

• Chiller-C: Main PCB card, Magnetic contactors & Fuses required.


• Chiller-A,B,C&D oil filters annual replacement required.
• CCR Battery room ac unit - 2, indoor unit leakage. New indoor unit required.
• ECR battery room ac unit - 2, indoor unit leakage. New indoor unit required.
HVAC • Electrical Engineer’s office at ECR building, ac unit’s compressor faulty, new compressor required. Spares