One-Line Diagram - OLV1 (Short-Circuit Analysis)

20 kV
NIGELEC UTILITY
554,256 MVAsc
16 kA

20 kV 8 kV
LOCAL ELC.GRID CON.POINT 16,1 11,5
16 ,1
0 kA kA

± R

Cable4

T1

1,2 MVA The connection of the facility to grid through 1200kVA transformer. Short
circuit calculation has been performed according to nominal value such as, he
utility fault current getting as16kA and the value of X/R; 10.
Cable1

Cable7

Bus2
0,4 kV
0,4 kV
37,41 kV
MAIN BUS 0, 25
37,4
0 kA 1 kA

Cable8
Cable93 Cable107
±
Cable112
Cable110
Cable2
kV kV Cable3
0, 25 0, 25
0,4 kV
4,52 0,4 kV Cable105
GEN1 BUS 4,52 kA 10,3
4 kA
GEN2 BUS 10,34 kV
26
PNL0,SCAC1
475,5 A 3,15 0,4 kV
0,4 kV Gen2 1086 A 3,15
Gen1 Cable113 kA
0,28 MW 0,64 MW 0,4 kV Cable99
PNL APP
25 kV
0, PNL FEEDER TO AMERCN SCHO
31,080,4 kV kV
31,0 PNL FEEDER TO28EMR
kV 0,4 kV 0, 27 0,4 kV
8 kA 0, 11,12
11,39 11 ,1
2 kA
11,3
PANEL MDP CY B. GEN RM. 9 kA
kV kV Cable80
0,4 kV 16,52 0,28 0, 28 0,4 kV
LOAD SCAC 1 PNL MSGQ 5,94
16,5 187 kVA 5,94
2 kA kA
LOAD APP
kV Cable47 39,5 kVA LOAD AMERC SCHOOL
0, 26
PNL TVSS 0,4 kV
15,9 PNL WH DP kV LOAD EMR 65,8 kVA
15,9 0,4 kV 10,35 0,27 165 kVA
Cable22 Bus470 Cable25 kA
Cable26 10 ,3 PANEL MDP BUILDING A2 kV
Cable24 5 kA MSGQ
LOAD 16,11 0,4 kV 0, 26
Bus75 kV Bus6
0, 28 kV Cable95 165 kVA
0,4 kV 8,67
28 kV 0, 28 Cable103 16 ,1
1 kA
0, 8, 0,4 kV
8,53
67 kA8,05
8,05 8, 53 kV 0,4 kV
kA 0, 28 kA
LOAD TVSS Cable82
0,4 kV 8,2
Bus469 AB-CH-102 8,2
kA
46,1 kVA Cable75 Cable77 Cable79
Cable6 0,4 kV
Cable101 kV
0,26
3,94
0,4 kV kV
0, 26
3,94
3, 94 Cable87
kA 3,94
AB-CH 101 C-CH 101 PNL WHE'12 kA Cable81
263 kVA 187 kVA C-CH 102 PNL 'WHE SHOP kV PNL 'UNKNW'
187 kVA 263 kVA 0,28 kV kV
0,4 kV 2,32 0, 28 0, 28 PNL MAIL 0,4 kV kV
kV 0,4 kV 2,32 0,4 kV 2,32 3,20,26
0,27 0,4 kV 2, 32 2,32
6,69 kA kA 2, 32 3, 2
PNL WHE11 kA kA Cable115
6,69
kA PNL ETR PNL 'UPS SUPPLY' Cable91
0,4 kV kV PNL LTC AC UNIT
0, 26
1,63 kV
0,4 kV 3,20,26
PNL PUMP RM 1,63
LOAD WHE -11 kA PNL PKG. B. 3,2
kA kV
98,7 kVA LOAD PNLWHE12 0, 28
PANEL SDP BUILDING C kV LOAD PNLWHE SHOP 0,4 kV 2,32 PNL 'E' ETR
14,16 0,4 kV 0, 27 69,3 kVA 0,42,kV
69,3 kVA 32
14 ,1 PNL MAIN kA
GATE
6 kA

LOAD UNKNOWN
Cable393 Cable14 69,3 kVA
Cable19
PUMP ROOM PWR CENTER 1 LOAD PKG. B.
41,6 kVA LOAD OUTLTC AC UNIT
Cable42 41,6 kVA 41,6 kVA
0,4 kV kV
0, 28
2,32
kV PNL 'CA1' kV LOAD MAIN GATE
0, 27 0,27 kV 2,32
0,4 kV 6,2 0,4 kV 6,78 0, 28 LOAD ETR PNL 'UPS SUPPLY' PNL'E1'ETR kA
6, 2 0,4 kV 2,31 PNL 'CC1' 277 kVA 139 kVA
kA 6,78 2,31 69,3 kVA
kA kA
0,4 kV kV MAIL RM
0, 26
3,18 PNL 'CB1'
PNL 'CD' 3, 18
kA

PANEL MDP BUILDING A 0,4 kV kV


10,27 0, 27

10,2 LOAD 'E'ETR


7 kA
0,4 kV kV kV 69,3 kVA
6,20,27 0,4 kV 0,27 0,4 kV
6,78 kV
0, 28
2,31 Cable51
6,2 6, 78 Cable54
PNL'CA2' kA 2,31 Cable40 Cable58
PNL'CB'2 kA kA Cable43 Cable55
PNL'CB'3

LOAD PNL'CD' Cable46


Cable49
61 kVA kV PNL 'AA1'
0,27 kV PNL 'AB1'
0,4 kV 5,22 0, 27 0,4 kV kV
0,4 kV 5,22 0, 26
2,24
5,22 5, 22 0,4 kV kV 0,4 kV kV kV
kA kA 2, 24 0, 26
2,24 0,4 kV 0,26
PNL-A2 kA 0,26 PNL-'BX2' 3,92
3,92
LOAD "PNL CA1-2" LOAD "PNL CB1-2" LOAD "PNL CC1-2" 2, 24
140 kVA PNL-PBX kA 3, 92 3,92
140 kVA 69,3 kVA PNL-BX1 kA kA
0,4 kV kV
0,26
1,55 0,4 kV kV
0,26
1,55
PNL AD 1, 55
kA PNL A1 1, 55
kA

0,4 kV kV kV
0, 27
5,22 0,4 kV 0,27
5,22
PNL'AA2' 5, 22 PNL'AB'2 5,22
kA kA

LOAD PNL AD
LOAD PNL 'A1' LOAD PNL 'A2'2
32 kVA
41,6 kVA 41,6 kVA LOAD PNL 'PBX' LOAD PNL 'BX2'
LOAD PNL 'BX1'
41,6 kVA 69,3 kVA
69,3 kVA
LOAD "PNL AA1-2" LOAD "PNL AB1-2"
69,3 kVA 69,3 kVA

page 1 22:49:21 Eyl 08, 2014 Project File: USA_20kV_1200kVA Project