ETAP

Project: 11.0.0 Date: 04-02-2014


Location: SN: 08a423fb
Contract: Revision: Base
Engineer: Study Case: SC Config.: Normal

Project File: C:\ETAP 1100\USA_1200kVA Building_20kV\USA_20kV_1200kVA Project


Output Report: Untitled

Short-Circuit Analysis (IEC363)


DC Component of Fault Current

Bus1 GEN1 BUS GEN2 BUS LOCAL ELC.GRID CON.POINT


MAIN BUS

90

80

70

60

50
Idc (kA)

40

30

20

10

0
0 0,02 0,04 0,06 0,08 0,10 0,12
Time (Sec.)