Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

RIVER GAUGING STATION

0
2760.0

MAIN DAM SITE

RE-REGULATING DAM SITE

Sg NENGGIRI

JKR ROUTE D29 FROM


GUA MUSANG

NOT FOR CONSTRUCTION


EMPLOYER:

PROJECT:

NENGGIRI HYDROELECTRIC PROJECT


CONSULTANT: SMEC INTERNATIONAL - TEPSCO - SMEC MALAYSIA CONSORTIUM

MALAYSIA

SCALE: AS SHOWN
KG. CHEGAR ATAS
C RE-ISSUED FOR TENDER. (ADDENDUM 8) A.MK A.P 26.02.21 DRAWN: P.McDEVITT DATE: Dec-17 RIVER GAUGING STATION SITE
B RE-ISSUED FOR TENDER PRPOSES ONLY. (FINAL) A.MK WVR030 13.04.18 DESIGNED: A.PATTLE DATE: Dec-17 PLAN
A ISSUED FOR TENDER PURPOSES ONLY. (FINAL) A.MK WVR030 15.02.18 DESIGN CHK: A.PATTLE DATE: Dec-17 SHEET DRAWING STATUS DRAWING No. REV
SIZE

No REVISION DESIGNED APPROVED DATE APPROVED: A.PATTLE DATE: Dec-17 A1 TENDER 5050132-NGR-E08602 C

You might also like