Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

July 13, 2024

DAILY REPORT

BUSINESS DEVELOPMENT
Daily Report –13 July, 2024 Arranged By Andry Muliady
Location Hub. Kendari Job Title Geologist
Department BD Pages Page 2 of 9
Topic Daily Report

DAILY PROGRESS

No Work Plan Status Remarks

Continuing develop SOP role of Geologist


1.
in nickel mining

Review important items that are still


2.
missing from the TID survey form

Documentation
Continuing develop SOP role of Geologist in nickel mining
Daily Report –13 July, 2024 Arranged By Andry Muliady
Location Hub. Kendari Job Title Geologist
Department BD Pages Page 3 of 9
Topic Daily Report
Daily Report –13 July, 2024 Arranged By Andry Muliady
Location Hub. Kendari Job Title Geologist
Department BD Pages Page 4 of 9
Topic Daily Report

Copy paste link website for downloading a Shapefiles


• Website Indonesia Geospasial
Daily Report –13 July, 2024 Arranged By Andry Muliady
Location Hub. Kendari Job Title Geologist
Department BD Pages Page 5 of 9
Topic Daily Report

• Website Lapak GIS

• WebGIS Geoportal Ministry of Environment for forest areas


Daily Report –13 July, 2024 Arranged By Andry Muliady
Location Hub. Kendari Job Title Geologist
Department BD Pages Page 6 of 9
Topic Daily Report

Review important items that are still missing from the TID survey form

• Form Original TID

There are several items added such as:

 Geotechnical studies

 Safety management
Daily Report –13 July, 2024 Arranged By Andry Muliady
Location Hub. Kendari Job Title Geologist
Department BD Pages Page 7 of 9
Topic Daily Report

 Quality control management


Daily Report –13 July, 2024 Arranged By Andry Muliady
Location Hub. Kendari Job Title Geologist
Department BD Pages Page 8 of 9
Topic Daily Report

Meeting prepare before project TID in Site PT. Bakti Pertiwi Nusantara

You might also like