NGG21-UPS-2023-02_240V AC Main Dam UPS Distribution_SL

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

0 10 20 30 40 50 60 70 80 90 100

A A

=31BFA10GH001
B B
+31BFA10

SLD_AC 31BFA10/1.3:I

SLD_AC 31BFA10/1.3:I
415V AC Main Dam
Electrical Building

UPS_1

UPS_2
Board

C C
=31BRU10GH001 =31BTC10CR001
+31BRU11 +
240V AC Main Dam Battery
UPS Inverter

-G01
24Ah
.. cells
3
D D
3
-U01 -T01
10kVA
415V AC// 110V DC 2
11kVA

-U01 =31BTC10GH001
E 110V DC// 240V AC
10kVA 2
+31BTC11 E

Fuse Box

-V01 -V02
-Q01
50A

-Q01
100A

F F

=31BRA10GH001
+31BRA11
-T101,102,103
G 240V AC Main Dam 50/1A
3
G
15VA; 5P20
UPS Distribution -F101

V A

Multi function
2 Indication
-Q101
50A I>
-U101
H H

240V AC
=31LNC10GH001
-Q11
20A

=31LNC10GH001
-Q12
20A

=31LNC30GH001
-Q13
20A

=31LNC30GH001
-Q14
20A

=31LNC50GH001
-Q15
20A

=30CMD10GH001
-Q16
16A

=31LBC01GH001
-Q17
20A

=31LBC01GH001
-Q18
20A

=30CMD10GH001
-Q19
16A

=31BFA10GH001_
-Q20
16A

=31CYA10GH001
-Q21
16A

=31CYA10GH001
-Q22
16A

=31LPB10GH001
-Q23
16A

=32LNC10GH001
-Q24
16A

=32LNC30GH001
-Q25
16A

=32LNC50GH001
-Q26
16A

=34LNE10GH001
-Q27
16A

=34LNE20GH001
-Q28
16A

=31BRA10
-Q29
20A

=31BRA10
-Q30
20A

=31BRA10
-Q31
16A

=31BRA10
-Q32
16A

=31BRA10
-Q33
16A

=31BRA10
-Q34
16A
-F05

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

I I
-S05
L1-N...

-P05

J J
Main dam/spillway Gate-1

Main dam/spillway Gate-2

Main dam/spillway Gate-3

Main dam/spillway Gate-4

Main dam/spillway Gate-5

Main Dam Service Control Board


System

Power intake Gate-1

Power intake Gate-2

Main Dam Service Control Board


Equipment

415VAC Main Dam Electrical


Building Board

Main dam/spillway CCTV system

Power Intake Gates - Local


Control Board supply

Spillway Radial Gates 1 and 2 -


Local Control Board supply

Spillway Radial Gates 3 and 4 -


Local Control Board supply

Spillway Radial Gates 5 - Local


Control Board supply

Bottom Outlet Slide Gate - Local


Control Board supply

Bottom Outlet Radial Gate -


Local Control Board supply

Spare

Spare

Spare

Spare

Spare

Spare
K
Communication Equipment K

EMPLOYER:

TNBPG HYDRO NENGGIRI SDN. BHD.


ANDRITZ HYDRO GmbH

(A Wholly-Owned Subsidiary of TNB Power Generation Sdn. Bhd.)


This drawing is the property of

A subsidiary of Tenaga Nasional


A-1120 Vienna, Austria
Eibesbrunnergasse 20

L L

PROJECT:

NENGGIRI HYDROELECTRIC PROJECT


Note: Voltage and current transformer characteristics given are indicative only, the actual CONSULTANT: SMEC INTERNATIONAL - TEPSCO - SMEC MALAYSIA CONSORTIUM
1.)
requirement shall be determined after Calulations are finalized

Legend
MALAYSIA

M 3 Member of the Surbana Jurong Group M


Current transformer see Note 1.) Load Break Switch
Measuring device CONTRACTOR: EUROSAGA - ANDRITZ CONSORTIUM
A V
3

Voltage transformer see Note 1.) 3


2 Fused disconnector

Transformer with star and delta winding


Switch analogue Measuring instrument

3 PROJECT DOC N°:


Circuit breaker
N (mA) Transducer N
Diode
3
Fuse
Current transformer

3 Battery
Overvoltage protection
02 Updates after receiving Conusmerdata 26.08.2022 Almer Eder ES-ED
List of Protective functions Switch
01 Changes acc. letter NGR CS OE1 ES-ADZ(EM) 22 0112 26.08.2022 Almer Eder ES-ED
27 Undervoltage Motor operated device
Contactor Ind. Modification Date Prep. by Check T Check P Approved
50/51 Overcurrent
Parts list WA Nº
50/51N Neutral Overcurrent
Refer to protection notice ISO 16016

59 Overvoltage Hand operated device 2 Dimension Class Nº


Capable of being withdrawn
O 81 Under-/Overfrequency Group Type O
Recitfier / Inverter Scale
Legend for connection lines Earth connection Power Supplies for Outlying Works
2

Current transformer Disconnecting switch Softstarter


Main Dam - Uninterruptible Power Supply
Weight Material
Voltage transformer
Single Line Diagram
Circuit breaker Miniature Circuit Breaker Starpoint Date Name Client TNB
Analogue Signal Drawn 15.06.2022 Almer Plant Nenggiri Refer to protection
notice ISO 16016! ISO 128
1 Checked T 15.06.2022 Eder Project N° C56-841911-058 Europe
Power Cable Capacitor DG Diesel Generator
Molded case Circuit Breaker Checked P Contract N° THN 02/2021 Similar
P Power circuit I> 3 Approved ES-ED Date 01.03.2023 Replace P
Resistor Internal N°
=SLD_DC SLD_UPS31BRA10
A0_Hydro_CS_R03_row5_Nenggiri

Fibre optic (not used)


+SLD_DC
A0_Hydro_R03_Nenggiri

Communication Drawing N° Index


Sheet 1
NGG21-UPS-2023 02
m

of 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 m A0

You might also like