Resource Management
Linked to Timesheets Operations Guide 750
Table of Contents
RMT.OP.00 RM - Timesheets Operations 750 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
About this guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
RMT.OP.10.00 About RM timesheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
RMT.OP.20.00 Scenario and exercises . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
RMT.OP.30.00 Process RM timesheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
RMT.OP.30.10 Enter resource timesheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Resource timesheet entry modes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Enter timesheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
RMT.OP.30.20 Enter Service timesheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
RMT.OP.30.30 Enter weekly timesheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
RMT.OP.30.40 Enter team timesheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
RMT.OP.30.50 Enter manual allowances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
RMT.OP.30.60 Calculate allowances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Advance timesheets and manual allowances to posting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Calculate and post automatic allowances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
RMT.OP.30.70 Review timesheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Resource timesheet enquiry modes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Review timesheets for resource STEELH001 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
Review timesheets for CARP15 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
Review timesheets for CARPENT22 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
RMT.OP.30.80 Resource timesheet enquiries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
RMT.OP.40.00 Appendix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
RMT.OP.40.10 Glossary of Terms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
RMT.OP.40.20 Post engineer transactions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
RMT.OP.40.30 RM and Mobile Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Call completed but not invoiced . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Call completed and invoiced . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Mobile Servicing Transactions to Payroll Postings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
RMT.OP.40.40 Award interpretation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
Award interpretation – STEELH001 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
Award interpretation – CARP15 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
Award interpretation – CARPENT22 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
RMT.OP.00 RM - Timesheets Operations 750
Audience
This guide is designed for the following audience:
Overview
In this guide you will learn how to:
Prerequisites
It is assumed that you:
Use this method for sub-contractors, where sub-contractors are to be costed / charged out based on timesheets as opposed to the sub-
contractor functionality provided by project (contract type purchase orders). If the later applies, then the timesheet function would not
normally be required. However you may choose to cost sub-contractors based on their AP invoice but still record the number of hours they
worked (using timesheets) to track hours worked and / or charge your customer.
Timesheets can only be entered against resources meeting the following criteria:
These timesheet functions not only allow the capture of timesheets with all the necessary linked data values (like project / tasks / service
calls etc.), but also perform an award interpretation function. This function determines costing / pay breaks, automatic & manual
allowances and unpaid meal breaks.
Connectivity exists between most sub-module functions and resource management timesheets, such as;
Mobile Service engineer transactions will be passed through the resource management timesheet award interpretation engine
(when resource management is active for service module)
Employee Portal timesheets will be passed through the resource management timesheet award interpretation engine (when
resource management is active for project or service modules)
Service engineer transactions will be passed through the resource management timesheet award interpretation engine (when
resource management is active for service module).
If licensed for Payroll, after the award interpretation has occurred, posted transactions can be picked up by payroll if required. At the time
the award interpretation is posted, the appropriate costs & chargeout will be reflected in the project / service calls. Functions performed
outside of the resource management timesheet screens (Mobile Service / Payroll Kiosk etc.), may facilitate an automatic award
interpretation, applying automatic allowances, but skipping the opportunity for manual allowances.
For all of the steps and tasks shown throughout this guide, where the user is required to enter data, these are all based on the fictitious Fred
Kirks Enterprises requirements as per the scenario below, which is expanded throughout the various sections of the guide. You will need to
set up your data based on your business needs.
Scenario
You are the Payroll Officer for Fred Kirks Construction, a construction company who has recently won a large project for ACME
Constructions.
Pronto Xi Resource Management has been implemented and configured (refer to the Resource Management Configuration guide) and
Fred Kirk's project manager has created the following necessary resources, schedules and bookings for the project (refer to the
Resource Management Linked to Project & Service Operations guide):
Two subcontractors:
Subcontractor STEELH001 is a steel worker with a different award (already configured), working a 14 day FIFO (Fly-In-Fly-Out)
work cycle of 10 days on 4 days off. A manual allowance also applies. This is a highly skilled worker, having many attributes,
and requires training in the customer's safety induction process.
STEELH002 is a second steel worker who works for the same subcontractor as STEELH001. They will be created by duplicating
resource STEELH001.
Two assets
You will be requiring to use 2 different size cranes to complete this work. You will therefore be required to setup both cranes as
fixed assets linked to resources.
CARPENT21 is scheduled to go on leave whilst CARPENT22 is due to attend a training session next week. The Christmas public holidays
are approaching. You will be required to set up their calendars to ensure they are not available for scheduling on these dates.
To aid the allocation of work to your resources you will be required to create 3 template views as follows, all carpenters, all resources
who have an active working at heights licence and all mobile cranes.
With both carpenter resources set up, plus an existing subcontractor, you will perform a review on your employee's schedules for
availability to determine when they can work, when they will work, and what they are already working on. Once a review has been
performed, you will begin assigning your resources to project tasks.
1. Enter resource timesheets Allows single day timesheet entry by stop/start times or total hours.
2. Enter weekly timesheets Provides a fast method to record timesheets for an entire week. This method is not designed to provide
the level of detail available by the Resource timesheet entry method. This method is unavailable for service calls and allows entry of
total hours only.
Once you have entered your timesheets, you will need to:
Scenario
You will be required to enter timesheet entries against multiple resources for different
awards to help understand how the resource management award interpreter works.
When timesheets are entered, they generally have a status of Pending. This allows the operator to enter many timesheets before
"committing" the transactions i.e. advancing them to Entered Advance timesheets & calculate allowances Any transaction at a status
of Entered can be picked up and processed by a bulk timesheet translate & post function. Once posted you can no longer modify those
timesheets.
The reason for having a status of Pending, is to protect these entries from any bulk updates taking place until you are ready.
Mode Description
Find Find an existing timesheet or manual allowance based on the start date and time worked.
Entry Create a new timesheet or manual allowance across the main datagrid entry screen. A Detail Entry mode is also
available.
Detail The standard timesheet entry / correct screens are a datagrid, however the Detail mode provides a form view
method of entering and correcting timesheets. This means all necessary fields can be displayed on a single viewing
screen instead of scrolling several screens wide.
Remove Remove the current record. This is only allowed when its status is Pending or Entered.
Mark Use to mark / unmark individual records you wish to advance in status and is only available when the record has a
/Unmark status of Pending or Entered.
Mark Use to mark / unmark all records at a Pending or Entered status. Once tagged, you may use the Processing mode to
/Unmark perform actions for all marked records.
All
Submit Use to advance the status of all marked Pending records to Entered. This is necessary in order for award
interpretation (translation) to occur and posting functions.
Remove Remove all marked records. Only records at a Pending or Entered status can be removed.
All
Review Displays the review timesheet function, which displays all records for all selected resources of all statii. Any
transactions already passed through the award interpreter (translated) may show multiple lines split into
appropriate pay breaks and both manual & automatic allowances will be shown. This function requires security
RMS.M018
For more detail see Review timesheets
Total This provide a summary screen for the current resource for a specified time period. Its purpose is a cross check for
Hours the user to ensure they've entered the correct number of hours and if all of those hours have been posted as yet. The
screen also provides a breakdown of hours posted into the appropriate buckets following the award interpretation
(translation) process.
Processing This provides a menu of processing options. Refer to Resource timesheet entry processing mode
Translate Time
Post Time
Calculate Allowance
Post Allowance
Reverse Time Translated
Reverse Time Posted
Reverse Allowance Calculated
Extra Access various enquiries. The current record will dictate which of these options will be available. Refer to Resource
timesheet entry extra mode
Copy Timesheet
Payroll Timesheet enquiry
Project enquiry
Project timesheet notes
Service Call enquiry
Call notes
Mode Description
Translate Selecting this function will calculate the break-down of normal, Time & Half etc. hours for the marked timesheets.
Time This function cannot be used until the timesheet has an Entered status.
When timesheets are Posted, an automate translation will occur.
This option can be used by resources who do not have access to post timesheets.
Once translated the status of the timesheet is changed to Time Translated and the timesheet can no longer be
corrected.
Post Time First mark the records you wish to post, these may be timesheet or allowance records. You will only be allowed to
post records where you have valid "PN" data masking and database table access (SYSPAY).
Data Description
Source
Timesheets Running this function for timesheets will perform the award interpretation step (translation)
and performs the Calculate Allowance function for automatic allowances. A Time Post Run ID
will be allocated to each posted record.
When viewed from the Review screen, timesheet entries will have been split into their
appropriate buckets such as normal time, 1 ½ time, double time etc. Unpaid meal breaks will
also be interpreted.
Status moves from Entered / Translated to Time Posted.
Manual Selecting this function will post manual allowances. A Time Post Run ID will be allocated.
Allowances Status moves from Entered to Allowance Posted.
This function will NOT post timesheets to payroll. When required you will be required to run Post
Timesheets (SYS T033) and select Post to Payroll = Y
Calculate Timesheets
Allowance This function will calculate automatic allowances where applicable. A second screen will ask for a range of resources
(defaulting to the current resource), transaction date ranges, and award ranges. Only records within this range and
those with a status of Time Posted will be assessed. An Allowance Post Run ID will be allocated.
Status moves from Time Posted to Allowance Calc.
Automatic allowances will appear in the Datagrid with a status of Allowance Calc. They will share the same
Allowance Post Run ID as the timesheet which triggered them, but will not receive a Time Post Run ID.
This function is only available for users with appropriate "PN" data masking and database table access to payroll-
timesheet-detail.
The Run ID is used to group timesheets and the allowances that were created from those timesheets.
Allowances cannot be created based on timesheets holding two different run ID's.
For example, a meal allowance is paid to a resource if they work more than 8hrs in one day. If in the
morning they work 6hrs and then in the afternoon they work an additional 6hrs but when the Calculate
Allowance function is run, only one of the two timesheet entries were marked for update, the allowance
will not be applied as they have not qualified the minimum number of hours. Further, when the Calculate
Allowance function is run for the second timesheet it will be flagged with a new run ID and it too will not
apply the allowance.
Consideration therefore must be given to when this function is run, especially when dealing with weekly,
fortnightly or monthly allowances.
Reverse If corrections are required to be made to timesheets and the timesheets are at a status of Time Translated, you can
Time reverse the translation. This will revert the status of all selected timesheets to Entered, reset the Normal, Time&Half
Translated hours etc. They can then be corrected as required.
Reverse Reverse all timesheet transactions for the selected resouce of status Time Posted for a specific date.
Time When this occurs the original transactions remain unchanged as they have already been posted to the relevant
Posted ledgers.
This function duplicates all timesheets for that date with a negative gross hours and posts them immediately.
In addition, the Calculate Allowances and Post Allowances functions will be run for post the old and new timesheets
and hence the status will be set to Allowance Posted.
If you need to reverse part hours on a timesheet, you are required to reverse the timesheet in full and then
re-enter a timesheet for the correct duration.
Reverse This function will delete all automatic allowances created within the Allowance Run ID range with a status of
Allowance Allowance Calc and return linked timesheets to a Time Posted status.
Calculated
Example: This option would be used if allowances were previously calculated and at that time you had not
qualified for a weekly allowance. Now that further timesheet have been entered you do qualify. Pronto Xi will
not be able to use both sets of timesheets unless they all exist back at the Time Posted status.
Mode Description
Copy Upon selection, a second screen appears asking for Employee Category, a start / end date range to copy from and a
Timesheet "to date" to start copying these to. So if the copy from date range spanned 3 days, these will be replicated spanning
3 days, starting from the "to date".
Any reversed timesheet records are ignored.
If a timesheet already exists for that employee on the copy to date, it will be excluded.
If the resource is not scheduled to work on the copied to date, it copied record will not be created.
If the timesheet relates to a service transaction, a corresponding service transaction will also be created for the new
date.
All copied timesheets are created with a Pending status.
Payroll All key details for the current record are presented in a single screen, with further menu options to view additional
Timesheet functions like the project or service call, notes & audit.
enquiry
Project Drills to the linked Project Maintenance screen, when the transaction source was a project or a service call which is
enquiry linked to a project.
If the user has access to project maintenance (PROJ M117) they will be allowed to edit the project. If they do not
have access they will be taken in enquiry mode only.
Project Displays the timesheet notes when the transaction source was a project and the status is Pending or Entered.
Timesheet Not valid for allowance records or timesheets linked to a service call.
Notes
Service Drills to the Call Maintenance by Call Number for enquiry, when the transaction source was a service call.
Call
enquiry
Call notes Displays and allows you to edit the service call notes when the transaction source was a service call provided the
timesheet type is not an Allowance.
Enter timesheets
Scenario
You will enter timesheets for resource STEELH001 against project PKA-B task 800.
The first day will be entered against alternate award BUILDCON. Enter worked transactions from 06:30 to 16:00 for shift DAY
The second day you will enter times against their primary award STEELW for the same resource, project & task. Enter worked
transactions, also from 06:30 to 16:00 for shift DAY.
Next, you will enter timesheets for resource CARP15 against service call 1634. This will be against their default award CARP. Enter
worked transactions from 14:30 to 20:00 for shift ARVO.
Once complete, the Resource Timesheet Entry screen for the resource will be displayed with the Status of Pending.
First, ensure project task 800 on project PKA-B is set to Notified or In Progress.
Steps
1 Select Resource Management > Timesheets > Resource Timesheet Entry (RMS M012).
The Resource Timesheet Entry screen is displayed.
The resource code can be entered, or enter a key word to search. The key word search will check resource code, resource
number, resource description, resource contact name, resource phone number, resource mobile number, resource email.
If you have access to RMS S001 you can leave the resource code blank. The displayed datagrid will then allow you to view and
enter timesheets for all resources that you have access to. (RM Masking or Authority tree)
4 Accept the default Employee category, 1V. The employee category normally defaults from the employee master.
5 Click OK.
6 Click Entry.
Field Description
Resource Will default from the entered value on the timesheet header and be made read-only if a resource was
Code entered on the first screen. If no resource code was assigned on the first screen you can now enter the
resource code for this timesheet entry.
Date Enter the date this resource worked. Enter the same date as the start date from the project resource
Worked booking.
Enter 1-11-16
Type Select a resource timesheet type code. These relate to the system table TI which maps posting rules and a
variety of other properties. There will be different types for the different work functions, such as worked,
annual / sick leave and allowances (if appropriate). Only those with a special Used in RMS flag ("TI" table)
will appear for selection. Also allowances require a pay type of 4 in order to ask for the allowance code
applicable.
This will default to the type used on the previous timesheet entry.
Enter W for worked.
Option Description
S Service call
J Project
G General Ledger
B Choose from Bookings. This option will populate the timesheet details based on your
bookings for that day.
As we are posting against a project, enter J.
Source This represents the source document such as a project number, a service call, a general ledger account
From code or a plant work order number.
Enter project PKA-B.
Task This is the project task the transaction relates to. A task will only be asked for where project tasks have
been used. If a project does contain tasks, your resource can only record time against those tasks which
they have been allocated.
The task field can be left blank if the resource is not flagged as Tasks Required.
If the expected task isn't listed in F2, confirm:
Enter 800.
Cost Cat The first labour type project cost category code will default unless there are no labour type cost
categories defined for the project as yet. An F2 will list the defined cost categories for this project.
If Project Procedures cost category creation flag (SYS.M055) is set to Not Allowed, then a labour type
cost category code must already have been defined for the project and selected in order to proceed.
If, however, the cost category creation flag is set to either Automatic or Ask, a cost category code can
be entered and will update the project accordingly.
Enter L001.
Start Code (Restriction: Only valid for when Source = Service Call (S). )
Used to describe the type of activity being performed by the resource.
Start Time Enter the start time for the work. The setup of the award / shifts / allowances will interpret both the start
& stop times for award interpretation.
Enter 6:30.
If you are entering a project timesheet and you want to enter total hours instead of a start and
stop time, leave both time fields as 0:00
Stop Code (Restriction: Only valid for when Source = Service Call (S). )
Use to describe the end of the work activity for service timesheets. A valid stop code from the S2 code
table must be entered.
Stop Time Enter the stop time for the work. The setup of the award / shifts / allowances will interpret both the start
& stop times for award interpretation.
Enter 16:00.
Total When timesheets are entered using the Weekly Resource Timesheet Entry format, the total hours entered
Hours for this record is displayed here.
The total number of hours worked by the resource. This is only populated and maintainable if the source
of timesheet is project and no start and stop times have been entered.
This does not display the total hours as calculated by the difference between the stop and start
times.
Gross The total number of hours as calculated by the difference between the stop and start times entered.
When timesheets are entered using the Weekly Resource Timesheet Entry format or in the Total Hours
column, the gross will always be blank.
Billable (Restriction: Only valid for when Source = Service Call (S). )
You may override the billable hours that will be assigned to the service engineer transaction.
Emp Cat The employee category code will default as first entered prior to this screen. It can however be overridden
if the resource worked under a different employee category for this transaction.
Accept the default if 1V.
Award If an award is assigned to a schedule entry for this resource for this date / time it will be used as default. If
Code not, the primary award of the resource will default; however, an alternate can be selected if previously
defined as an award for that resource.
Pronto Xi will prevent you using an award if the assigned start date for that award is after the timesheet
date.
Accept the default of BUILDCON.
Shift Code A shift code will default. Only those shifts previously defined against the award can be selected.
Default will be set based on that assigned to the resource's corresponding schedule entry for the date
entered.
Work Rate The work rate code represents the function of work performed, which can influence the base pay rate.
Default will be set based on that assigned to the resource's corresponding schedule entry.
Option Description
Y You wish to record notes. In the case of project & service, these will write back to the
source locations accordingly.
Allowance (Restriction: Only valid when Timesheet Type Allowance (L) is selected)
Enter the manual allowance code for this timesheet.
Only manual allowance codes assigned to this resource for the award can be selected.
Qty / Hour (Restriction: Only valid when Timesheet Type Allowance (L) is selected )
Enter the quantity or hours to be claimed.
Allowance (Restriction: Only valid when Timesheet Type Allowance (L) is selected )
Rate The rate from the corresponding allowance will be displayed. This value is not maintainable on this
screen.
This field and all following fields are visible on the timesheet datagrid but not on the Detail
form. They can however be unsuppressed using the Screen Customiser tool if required.
Allowance (Restriction: Only valid when Timesheet Type Allowance (L) is selected)
Percent The percentage from the corresponding allowance will be displayed. This value is not maintainable on
this screen.
Allowance (Restriction: Only valid when Timesheet Type Allowance (L) is selected )
Paycode The paycode assigned to the corresponding allowance is displayed.
Approval (Restriction: Only valid when the Employee Portal functionality is in use)
Flag This field displays the current approval status of this timesheet. If Employee Portal has flagged the
timesheet as requiring approval, it cannot be posted.
User ID The username of the Pronto Xi user who entered the timesheet.
Date Time The date / time of when the timesheet was entered.
Stamp
Status The status code for this timesheet. This can be used to filter your list of timesheets.
Time Post Once the timesheet is posted, the Run ID under which it was run will display in this field.
Run ID
Allowance Once allowances are calculated, each timesheet entry is stamped with an allowance run id to indicate
Post Run ID that automatic allowances have been calculated for that timesheet and under which run.
Post If a timesheet is unable to post, the reason it could not post will be displayed in this field.
Message
Error
Team If work was completed while part of a team, enter the team which you worked under. This will allow you
to copy the timesheet to other members of that same team.
8 Repeat steps 6-7 for any further timesheet entries required for that resource. Enter the following details
Field Description
Award Code Override the default to STEELW. A warning may appear, continue.
Notes Enter N.
9 Press Esc.
The Resource Timesheet Entry screen for the resource is displayed with the Status of Pending.
If an engineer is not allocated to a service call, Pronto Xi will prevent RM timesheets being entered for the corresponding resource.
Steps
1 Repeat steps 1-9 from Enter resource timesheets for resource CARP15 and accept the default employee category of 1V.
Field Description
Date Worked Enter the same date as the start date from the service call.
1-12-16
3 Select Service> Maintain Calls > Call Maintenance by Call Number (SERV M096).
The Call Maintenance by Call Number screen is displayed.
5 Select Trans
Here we see the transaction as it was entered in Resource Management timesheets.
Manual allowances cannot be managed from this screen. For more information, see Enter manual allowances
Service Call timesheets can only be performed from Resource timesheet entry as Service requires start / stop times.
Equipment can also capture transactions, very similar to timesheets but must performed under Resource Equipment Transactions
(RMS.M025).
The following modes are available under the Weekly Resource Timesheet Entry – Total Hours screen.
Mode Description
Copy Upon selection, a second screen appears asking for Employee Category, a start / end date range to copy from and a "to
date" to start copying these to. So if the copy from date range spanned 3 days, these will be replicated spanning 3
days, starting from the "to date".
Copied timesheets will only be displayed in the data-grid if they fall in the weekly period selected.
Review Displays the review timesheet function, which displays all records for all resources of all statii. Any transactions already
passed through the award interpreter (translated) may show multiple lines split into appropriate pay breaks and both
manual & automatic allowances will be shown. This function requires security RMS.M018.
Total This provides a summary screen for the current resource for a specified weekly time period.
Hours Its purpose is a cross check for the user to ensure they have entered the correct number of hours and if all of those
hours have been posted as yet. The screen also provides a breakdown of hours posted into the appropriate buckets
following the award interpretation (translation) process (managed from Resource Timesheet Entry).
Submit This will update the status of all Pending timesheets to Entered, allowing them to be translated and posted.
Scenario
Resource Chad Carpenter CARPENT22 needs to capture timesheets for the week against project PKA-B. As he doesn't need to
manage any manual allowances, and only needs to record the number of hours for a day (i.e. start/stop time is irrelevant) the
Weekly Resource Timesheet Entry – Total Hours function will be the most efficient entry method.
Once complete, the Resource Timesheet Entry screen will show the weekly timesheets split out into the individual work days.
Steps
1 Select Resource Management > Timesheets > Weekly Resource Timesheet Entry - Total Hours (RMS M021).
The Weekly Resource Timesheet Entry - Total Hours screen is displayed.
The resource code can be entered, or enter a key word to search. The key word search will check resource code, resource
number, resource description, resource contact name, resource phone number, resource mobile number, resource email.
6 Click Entry.
Field Description
Award Enter or select an appropriate award for the transaction. Only the awards attached to the resource can be
Code utilized.
Enter BUILDCON.
Shift A shift code will default. Only those shifts previously defined against the award can be selected.
Code Accept the default of DAY.
Type Select a resource timesheet type code. These relate to the system table TI which maps posting rules and a
variety of other properties. There will be different types for the different work functions, such as worked,
annual / sick leave and allowances (if appropriate).
Only those with a special Used in RMS flag (“TI” table) will appear for selection. Allowance types will not be
permitted.
Enter W for worked.
Option Description
J Project
G General Ledger
Source This represents the source document such as a project number, a service call, a general ledger account code.
From Enter project PKA-B.
Task This is the project task the transaction relates to. A task will only be asked for where project tasks have been
used. If a project does contain tasks, your resource can only record time against those tasks which they have
been allocated.
Alternatively, the Task field can be left blank to instead enter a cost category code.
If the expected task is not listed in F2, confirm that:
Leave blank.
Cost A labour type project cost category code will default unless there are no labour type cost categories defined
Cat for the project as yet. An F2 will list the defined cost categories for this project.
If Project Procedures cost category creation flag (SYS.M055) is set to Not Allowed, then a labour type cost
category code must already have been defined for the project and selected in order to proceed.
If, however, the cost category creation flag is set to either Automatic or Ask, a cost category code can be
entered and will update the project accordingly.
Enter L002.
Work The work rate code represents the function of work performed, which can influence the base pay rate.
Rate Accept the default of CA1.
Date Seven date fields, one for every day of the week will be presented. The 7 th day will be the week ending date
Fields entered earlier.
When these are later run through the award interpreter, a start time will be assumed from the Start Time in
the corresponding award / shift combination in the function Award Shift (RMS M007).
Enter the following hours: 6, 7, 4, 6, 5, 3, 8
8 Press Esc.
The Weekly Resource Timesheet Entry – Total Hours screen for the resource is displayed.
9 Press Esc
10 Select Resource Management > Timesheets > Resource Timesheet Entry (RMS M012), entering resource CARPENT22 with
the default employee category of 1V.
The Resource Timesheet Entry screen is displayed showing the weekly timesheets split out into the individual work days.
The hours per day is shown in the Total Hours column.
The start / stop times default to zero.
1. Entering in your own timesheets, ensuring you assign your team code against each record where you worked as a team
2. Use the Copy to Team mode button
This function is only available if each member of your team that you want to copy the timesheets to was also booked to work on the
same project / task. They do not have to have been booked for the same time / day.
Team timesheets can only be created in the daily timesheet entry function (Resource Timesheet Entry).
The Copy to Team mode is only available if you do not enter a specific resource code on the first timesheet entry screen. This
allows you to enter timesheets for multiple resources within the one screen.
You may only use this option is you have access to RMS S007 - Allow team resource timesheet entry.
Scenario
The team ADHOC has been booked on task 1000 on project PKA-B. DRIV01 was set as the leader of this team and will now enter
timesheets on behalf of the team.
Each of the team members worked the same days and times as the leader except for PLUM01 who did not work on the first day as
expected based on the bookings. This is shown in the table below.
We can also see that although CARP15 was not booked to work on 15 March, they did actually work.
CARP15 was not booked on the 15th March (you will be required to manually enter this timesheet)
PLUM01 was not booked on the 12th March (no adjustments necessary)
Steps
1 Enter the timesheets entries for DRIV01 as shown below where the Team field is populated with the team that you worked
with.
2 Mark each of the timesheets for resource DRIV01 using the Mark/Unmark mode.
But no timesheet has been created for 15-Mar (because he was not booked). You are therefore required to manually enter this
record.
No timesheet was created on 12-Mar because he was not scheduled to work on that day. Hence no further updates are
required.
6 We also see that no timesheets are created for the Equipment resource. These are required to be manually entered into the
Equipment Timesheet function.
Steps
1 Select Resource Management > Timesheets > Resource Timesheet Entry (RMS M012).
The Resource Timesheet Entry screen is displayed.
4 Accept the default Employee category, 1V. The employee category normally defaults from the employee master.
5 Click OK.
6 Click Entry.
Field Description
Type Select an allowance type code. These relate to the system table “TI” which maps posting rules and a variety of
other properties. There will be different types for the different work functions, such as worked, annual / sick
leave and allowances (if appropriate).
Only those with a special “Used in RMS” flag (“TI” table) will appear for selection. Also allowances require a pay
type of 4 in order to ask for the allowance code applicable.
Enter L for allowances.
Allowance Allows the selection of a manual allowance. These are only available if defined against the award and allocated
to the resource in Resource Master – Manual Allowances.
Enter HEIGHTS.
Qty / Hour Enter the quantity for the entitlement. A kilometre allowances would require the KM’s to be entered, if unsure
enter 1.
Enter 1.
9 Press Esc.
The Resource Timesheet Entry screen for the resource is displayed with the Status of Pending.
Example: If you were interrupted during timesheet entry and wanted to return later, those transactions would not be actioned
accidentally.
This will need to be managed from either the Resource Timesheet Entry screen or the Weekly Resource Timesheet Entry screen.
Steps
1 Select Resource Management > Timesheets > Resource Timesheet Entry (RMS M012).
The Resource Timesheet Entry screen is displayed.
4 Accept the default Employee Category, 1V. The employee category normally defaults from the employee master.
5 Click OK.
The timesheets for this resource are displayed.
7 Click Submit. This will advance the status from Pending to Entered.
Selectively mark the transactions you wish to post, including both timesheets and manual allowances.
This option will only be enabled if you have access to RMS S004 – Allow RMS Timesheet Processing Options.
The timesheets now displayed with a status of Time Posted and the allowances display with a status of Allowance Posted.
Scenario
Calculate the automatic allowances for resources STEELH001, CARPENT22 and CARP15.
Steps
1 Select Resource Management > Timesheets > Resource Timesheet Entry (RMS M012).
The Resource Timesheet Entry screen is displayed.
5 Click OK.
This option will only be enabled if you have access to RMS S004 – Allow RMS Timesheet Processing Options
7 Accept the defaults, ensuring the date range includes your transactions.
8 This has resulted in an automatic allowance transaction having been created, posting directly to a General Ledger account
1N630, determined by the allowance configuration.
Take
note of the allowance run id as this will be needed at the next step. This id has been assigned against all timesheets
that were at a status of Time Posted (now Allowance Calculated) and against the created automatic allowances.
This tells us which timesheets were used to generate which allowances. It also allows us to run 'Processing -
Reverse Allowance Calculated' which will change the timesheet status back to Time Posted and delete the created
allowances.
This option will only be enabled if you have access to RMS S004 – Allow RMS Timesheet Processing Options.
Review timesheets will explain why the award interpreter has produced these results.
This section will take you through an understanding of how the award interpreter has achieved the results found in Calculate
allowances
Scenario
As a manager, you are required to review the logic applied by the award interpreter for resources STEELH001, CAP15 and
CARPENT22.
Mode Description
Shift Displays the award shift breakdown of hours per pay increment (normal, time and a half etc.) regular start time and
what pay increment to apply if timesheets commence prior to the expected start time.
The timesheet type for the current record will influence when this option is available, hence an allowance record will
prevent access to Shift.
Allowance Displays the allowance rules for an award. This includes whether it was a manual or automatic award, how the
amount is calculated, intervals & restrictions for automatic awards such as max total amounts and any General
Ledger or project & category definitions for posting.
The timesheet type for the current record will influence when this option is available, hence only available on
allowance records.
Project Drills to the Project Maintenance screen for enquiry, when the transaction source was a project
Service Drills to the Call Maintenance by Call Number for enquiry, when the transaction source was a service call.
Call
A manual allowance of HEIGHTS was also captured for the first day.
Steps
1 Select Resource Management > Timesheets > Resource Timesheet Enquiry (RMS M018).
The first thing you will notice is that the difference between a start time of 6:30 and finish time of 16:00 equates to 9 ½ hrs, however the
record is being presented as 8 paid hours and ½ hr unpaid.
Hour intervals
Shift start time
For a larger image of the above spreadsheet, see Award interpretation – STEELH001
The first row represents the transaction we are processing in Pronto Xi. The difference between the start and stop time is 9 ½ hrs.
There is an award start time defined of 07:00 and an early pay value of zero, which means any time recorded before 07:00 is ignored.
This is where the Unpaid value of 0.5 is derived from (i.e. ½ hr) in Pronto Xi. The spreadsheet presents an allowed time of 9hrs to assess.
Break calculations
Each break section represents the number of hours to be worked in order to be entitled to a break,
Break 1 states 2.25 hrs is worked (2 ¼ hrs), then a 0.25 break (¼ hr). The reality is, someone must physically work 2½ hrs (2.25 + 0.25)
even though they will only be paid for 2¼ hrs for the 2½ hrs worked.
Similar logic applies for breaks 2 and 3. The net result is, only 8hrs is assessable for payment/costing.
For a larger image of the above spreadsheet, see Award interpretation – STEELH001
Lastly, the award then dictates the pay scale buckets, resulting in:
This aligns with the summary at the bottom of the Resource Timesheet Enquiry screen.
If multiple timesheets exist per day, the Hours Worked vs Award Total vs Daily Total sections can all differ – which is an accurate
reflection of the bigger picture for this resource.
If an early start pay scale applies (other than zero) and start times are recorded earlier than the shift start time, then this time is added
into the respective pay scale bucket after that bucket is first calculated, hence it is possible for a normal threshold to be exceeded.
Example: If an early pay scale = 1 (time & half) and 3hrs is recorded prior to the shift start time and the duration of time recorded,
results in time qualifying for time and half, and there is a 1 ½ time threshold of 2hrs, the calculation can result in 5hrs in the time
and half bucket, which would be correct.
Steps
For this award, the same start time of 6:30 and finish time of 16:00 produces a different outcome. The 9½ hrs recorded results in 8½
paid hours and nothing unpaid.
Hour intervals
Shift start time
Early start pay scale
Calculations explained
Overview of spreadsheet:
For a larger image of the above spreadsheet, see Award interpretation – STEELH001
The second row represents the transaction we are processing in Pronto Xi. The difference between the start and stop time is 9 ½ hrs.
There is an award start time defined of 07:00 and an early pay value of 2, which means any time recorded before 07:00 is paid at time
and half. The spreadsheet presents an allowed time of 9 ½ hrs to assess.
Break calculations
Each break section represents the number of hours to be worked in order to be entitled to a break.
Break 1 states 2.25hrs is worked (2 ¼ hrs), then a 0.25 break (¼ hr). The reality is, someone must physically work 2 ½ hrs (2.25 + 0.25)
even though they'll only be paid for 2 ¼ hrs for the 2 ½ hrs worked.
Similar logic applies for breaks 2 and 3. The net result is only 8hrs is assessable for payment/costing.
Lastly, the award then dictates the pay scale buckets, resulting in:
For a larger image of the above spreadsheet, see Award interpretation – STEELH001
This aligns with the summary at the bottom of the Resource Timesheet Enquiry screen.
If multiple timesheets exist per day, the Hours Worked vs Award Total vs Daily Total sections can all differ – which is an accurate
reflection of the bigger picture for this resource
If an early start pay scale applies (other than zero) and start times are recorded earlier than the shift start time, then this time is added
into the respective pay scale bucket after that bucket if first calculated, hence it is possible for a normal threshold to be exceed.
Example: If an early pay scale = 1 (time and half) and 3 hrs are recorded prior to the shift start time, and the duration of time
recorded, results in time qualifying for time and half, there is a 1 ½ hr time threshold of 2 hrs, the calculation can result in 5hrs in
the time and half bucket, which would be correct.
Steps
As there are no minimum hours/maximum total amount restrictions, the calculation is easy, i.e. record something for a day and the
allowance will apply. If, however restrictions did apply, then the various sections shown below would be assessed.
Steps
Manual allowances have minimal restrictions. You either are entitled or are not entitled to enter a manual allowance. It is then a
business process to review if such a manual process should have been applied for that instance.
The Qty/Hour value responds to the quantity entered during the manual allowance entry and becomes a multiplier of the rate. In this
example it was simply 1 x $30.00 = $30.00
Steps
1 Select Resource Management > Timesheets > Resource Timesheet Enquiry (RMS M018)
This time, the calculation is simple with 14:30 to 20:00 representing 5 ½ hrs, all falling within normal operating hours and the pay scale
bucket of Normal.
Calculations explained
Overview of spreadsheet:
For a larger image of the above spreadsheet, see Award interpretation – CARP15
This row represents the transaction we are assessing in Pronto Xi. The difference between the start and stop time is 5 ½ hrs.
There is an award start time defined of 14:00 and an early pay value of 0 which means any time recorded before 14:00 is unpaid. The
spreadsheet presents an allowed time of 5 ½ hrs to assess.
Lastly, the award then dictates the pay scale buckets, resulting in:
For a larger image of the above spreadsheets, see Award interpretation – CARP15
This aligns with the summary at the bottom of the Resource Timesheet Enquiry screen.
If multiple timesheets exist per day, the Hours Worked vs Award Total vs Daily Total sections can all differ – which is an accurate
reflection of the bigger picture for this resource.
If an early start pay scale applies (other than zero) and start times are recorded earlier than the shift start time, then this time is added
into the respective pay scale bucket after that bucket if first calculated, hence it is possible for a normal threshold to be exceed.
Example: If an early pay scale = 1 (time and half) and 3 hrs are recorded prior to the shift start time and the duration of time
recorded, results in time qualifying for time and half, and there is a 1 ½ time threshold of 2hrs, the calculation can result in 5hrs in
the time and half bucket, which would be correct.
Day 1 - 6 Hrs
Day 2 - 7Hrs
Day 3 - 4 Hrs
Day 4 - 6 Hrs
Day 5 - 5 Hrs
Day 6 - 3 Hrs
Day 7 - 8 Hrs
Steps
1 Select Resource Management > Timesheets > Resource Timesheet Enquiry (RMS M018)
Hour intervals
Shift start time
Calculations explained
When project hours are entered without a start/stop time, Pronto Xi will assume the hours commence from the Shift Start Time.
Overview of spreadsheet:
For a larger image of the above spreadsheet, see Award interpretation – CARPENT22 .
As all entries commence from the shift start time, all times are assessable.
Break calculations
Each break section represents the number of hours to be worked in order to be entitled to a break.
This should be clear after reviewing the interpretation earlier for STEELH001.
Lastly, the award then dictates the pay scale buckets, resulting in:
For a larger image of the above spreadsheets, see Award interpretation – CARPENT22
This aligns with the summaries for each at the bottom of the Resource Timesheet Enquiry screen.
If multiple timesheets exist per day, the Hours Worked vs Award Total vs Daily Total sections can all differ – which is an accurate
reflection of the bigger picture for this resource.
If an early start pay scale applies (other than zero) and start times are recorded earlier than the shift start time, then this time is added
into the respective pay scale bucket after that bucket if first calculated, hence it is possible for a normal threshold to be exceed.
Example: If an early pay scale = 1 (time and half) and 3 hrs are recorded prior to the shift start time, and the duration of time
recorded, results in time qualifying for time and half, and there is a 1 ½ time threshold of 2 hrs, the calculation can result in 5 hrs in
the time and half bucket, which would be correct.
Steps
As there are no minimum hours/maximum total amount restrictions, the calculation is easy, i.e. record something for a day and the
allowance will apply. If however restrictions did apply, then the various sections shown below would be assessed.
Once a project timesheet is archived (Timesheet Housekeeping SYS M208), the resource management timesheet is also archived. Once a
timesheet is archived it will no longer be visible in the functions Resource Timesheet Entry (RMS M012) , Weekly Resource Timesheet
Entry (RMS M021) or Resource Timesheet Enquiry (RMS M018)
RMT.OP.40.00 Appendix
Term Definition
Ah Hoc When bookings are made against a resource that does not relate to a specific project or service call.
Bookings
Allowances Additional income payments a resource is entitled to for a specific purpose e.g. travel allowance, meals allowance.
Attribute A skill your resource has attained e.g. site induction, working with heights license, vehicle capable of carrying a
specified load.
Availability Determining when your resource is available to work. This includes both their normal working hours and additional
hours they can work if they are required.
Award The structure of how a resource will get paid. This includes when they qualify for Time & Half, Double time etc., when
they are entitled to unpaid breaks and what allowances they are entitled to.
Award The Pronto Xi engine that takes a basic timesheet entry and calculates the breakdown of normal, double time etc.
Interpreter hours.
Award Holds the shift details for an award e.g. normal starting time, number of hours worked before time & ½ pay rates and
Shift double pay rates, break times. Can have multiple shifts per awards e.g. morning, night, day.
Bookings Records that hold on which project / call / task a resource is scheduled to work on and on what date/time it is to occur.
Location Local rules for calendars e.g. when a site is open or closed, local holidays.
Calendar
Masking When a Pronto Xi user is restricted from working with / viewing resources in Pronto Xi because they have not been given
access.
Primary The award that a resource will work under most of the time.
Award
Resource A resource is someone or something that you will use to perform work for your business. They can be personnel,
subcontractor or an equipment item.
Resource A way of grouping multiple resources. For example, Plumber, Carpenter etc.
Group
Resource What other elements of Pronto Xi is the resource linked to. For example, engineer, employee and asset.
Links
Resource The location where the key details of a resource are held.
Master
Resource Records that hold when your resource will work or their normal working hours.
Schedule
When Resource Management is not activated for service, this function continues to work the same
When posting to Resource Management, the resource must be assigned a default award or that transaction will not post.
When this is run from this function or from a service call (SERV M096), the prompt "Post to Project" now provides the following options:
Option Description
No – Post to Resource
Timesheets Only Engineer transactions change to a status of Tsheet in Progress. It can no longer
be edited within the service module.
RM Timesheet(s) are created
If the resource was scheduled for that date/time, that award / shift is assigned
on the RM timesheet. If no schedule or the schedule holds no award, then the
primary award is assigned.
You will then be required to translate and post the timesheets as required.
When transactions are entered in Mobile Service, the engineer transaction will continue to be created against the engineer on the
corresponding service call.
The process flow in Mobile service transactions to payroll postings shows this in detail.
You will be required to post the engineer transactions through to Resource Management and the project. See Post Engineer
Transactions.
All service transactions are posted immediately (this is required to invoice the call correctly)
Resource Management timesheets are created
The service transaction posting function (SERV M011) is run with Post to Project = YES which does the following:
Resource Management timesheets are translated
Resource Management timesheets are posted to the project
Resource Management timesheets are posted to payroll
No automatic allowances are generated. This remains a manual process