SCHEDULE OF RCC WALL GENERAL NOTES:

HORIZONTAL VERTICAL 1. ALL DIMENSIONS ARE IN MM AND LEVELS ARE IN M UNLESS MENTIONED
WALL NO THICKNESS
INNER OUTER EXTRA AT INNER OUTER DOWEL REMARK OTHERWISE.
FACE FACE CORNER FACE FACE
20#@150 20#@150 20#@150 20#@150
2. ANY DISCREPANCIES OR OMISSION OR CHANGES SHALL BE BROUGHT TO
W1 800 -- - -
NOTICE PRIOR TO EXECUTION. DO NOT SCALE THIS DRAWING, ONLY
W2 350 12#@150 12#@150 -- 16#@150 16#@150 - - WRITTEN DIMENSIONS SHALL BE FOLLOWED.

3. PROFESSIONAL GEO-TECHNICAL INVESTIGATION OF THE SITE OF THE


OVERHEAD WATER TANK (OHT) SHOULD BE CONDUCTED TO ASCERTAIN THE
SOIL BERING CAPACITY (SBC).
LIGHTENING ARRESTOR 4. THE OHT IS DESIGNED FOR SOIL S.B.C. OF 500 KN/M2 IN REFERENCE TO THE
COPPER BAR 25 DIA 2.0M LONG GEOTECHNICAL REPORT.

R157
VENTILATOR
5. AT ALL PIPE OPENINGS PUDDLE PIPES SHALL BE PROVIDED.

00
EL28.30 MANHOLE
700x700mm
R36
6. THE SITE OF THE OVERHEAD WATER TANK SHOULD NOT HAVE SHALLOW
R3
GROUND WATER TABLE.
75
32
5

7. PROPER DRAINAGE SHOULD BE PROVIDED AROUND THE WATER TANK TO


1000 1000

2500
MS RAILING MS LADER PREVENT FLOODING.

125

125
DN WALKWAY 8. EXCAVATION TO BE DONE WITHIN 2.0 M DISTANCE FROM EDGES OF
A
MID LANDING LVL.

TB1 UP - EL25.80 EL 25.70 FOOTING OF THE OVERHEAD WATER TANK.


A B1 TB1 C1
R150 17000

15
-
0 TOP RING 9. DEATH OF FOOTINGS OF THE OVERHEAD WATER TANK SHOULD BE AT LEAST

1000

0
R1 EBAM EL 25.00 TWL 1.5 M FROM THE LOWEST GROUND LEVEL IF THE GROUND PROFILE IS
300 EL24.80
UNDULATING.
CJ TB1 3000 CJ

FREE BOARD
200 200
W R25 SS LADER 10. OVER HEAD WATER TANK INCLUDING ITS FOOTING (EDGE) SHOULD BE AT
AL 00
LEAST 3.0 M AWAY FROM ANY DEEP EXCAVATIONS.

800
KW

5
30

0
TY

37
.

30
AY P

0
P.
200mm THK TY 11. PROPER PLINTH PROTECTION AROUND THE WATER TANK SHOULD BE
WALL EL22.85
350mm THK
INTERNAL PROVIDED TO PREVENT SCORING OF SOIL ABOVE THE FOOTING THIS IS
WALL
SHAFT ESSENTIAL TO PREVENT EXPOSURE OF FOOTING.

TYP.
4800

300
CONICAL WALL 12. CONCRETE GRADE USED FOR WATER RETAINING STRUCTURE IS M30 AND

37
3
EL21.58 TB1

30

5
CJ CJ FOR STAGING IS M25 UNLESS OTHERWISE MENTIONED. CONCRETE MIX

R4
5
37
DESIGN SHALL BE AS PER PROJECT SPECS.

TY 0

30 P.
PLAN AT TOP WALKWAY LEVEL MIDDLE RING BEAM

30
P.

TY
0
SCALE: 1:75 BOTTOM DOME 13. ALL CONCRETE SHALL BE MACHINE MIXED AND VIBRATED.
PLAN AT 2.90 LEVEL AND ABOVE CJ CJ
SCALE: 1:75 EL20.00

0
30
TY 14. ALL MAIN AND STIRRUPS STEEL IS TMT TOR STEEL OF GRADE FE 500 MPa.
P.

30
0
P.
TY
CJ 15. ALL LAPS AND DEVELOPMENT LENGTH SHALL BE AS PER THE VALUES GIVEN
BOTTOM RING BEAM BELOW AND SHALL BE STAGGERED. LAPS SHALL BE CONSIDERED AS
TB1
R3

STAGGERED IF THE C/C DISTANCE OF THE SPLICES IS NOT LESS THAN 1.3
90

TIMES THE LAP LENGTH.


0

R3
10 15.1. DIA (LD/LAP) ANCHORAGE LENGTH
0
15.2. Ø10 460 560
R36
R3

EL 17.15 15.3. Ø12 550 670


75
32

48° 15.4. Ø16 730 890


5

0 0 15.5. Ø20 910 1110


90 25 BOTTOM
90

R1 15.6. Ø25 1140 1660


0

50 RING BEAM
C2 R15 TB1
16. DE-SHUTTERING PERIOD SHALL NOT BE LESS THAN -
UP

UP 16.1. VERTICAL FACES OF COLUMN BEAMS & WALLS = 24 HRS


A
A - 16.2. SLAB SPANNING UP TO 3.50 M. = 7 DAYS
- C1 TB1 R1500
C1 16.3. SLAB SPANNING OVER 3.50 M. = 14 DAYS
R13
00 EL 14.30 16.4. BEAM BOTTOM = 14 DAYS
C2 16.5. BEAM PROP SUPPORTS = 7 DAYS
MRB
REFER TO SHEET-2 FOR REMAINING NOTES...
200mm THK
WALL TB1

350mm THK
WALL
EL 11.45

FROM NGL TO TOC TO BRB


800mm THK
WALL BELOW

PLAN AT BRB TOP TO INTERNAL SHAFT TOP LEVEL TB1


PLAN AT FLOOR LEVEL

20000
SCALE: 1:75
SCALE: 1:75

EL 8.60

BUTTRESS
12 NOs FOUNDATION
RING BEAM TB1

SHAFT
WALL W1

EL 5.75

TYP.
350mm THK

190
TB1
° SHAFT WALL (W2)
30 P
T Y B1 EL 3.50
45°

2000 1000 3000 3000 1000 2000 WATER LEVEL EL 2.90


INDICATOR SCALE 25mm ISOLATION GAP
A C2 (TYP)
- POINTER
STEPS IN BRICK
GRADE SLAB 150 THK TB1 C1

150
8#@150 EW CENTRALLY PLACED TYP
EL 1.00
250
800 mm THK 400mm THK
BUTTRESS

EL0.00 SHAFT WALL (W1) C1 EL 00.0 NGL


TYP

150
BUTTRESS
FOR DETAILS
2000

REFER SHEET 4
1200

EARTH FILL COMPACTED TO 95%


REFER GAD FOR STANDARD PROCTOR DENSITY EL -2.00
EASTING AND
NORTHING
2000 1000 6000 1000 2000
100mm (M15) 100mm (M15)
FOUNDATION
PCC BINDER PCC BINDER
RING BEAM

PLAN AT FOUNDATION LEVEL A SECTION


- SCALE: 1:75
GENERAL NOTES:
NOTES CONTINUED FROM SHEET-1...

17. STEEL CHAIRS SHALL BE PROVIDED TO KEEP TOP REINFORCEMENT IN


PROPER AND CORRECT POSITION.

18. CONSTRUCTION SHALL BE STRICTLY IN ACCORDANCE WITH IS 456-2000.

19. ANY SOFT OR LOOSE STRATUM MET WITH UNDER FOUNDATION, BASE SLAB
ETC. SHALL BE EXCAVATED AND MADE GOOD WITH COMPACTED SOIL TO
95% PROCTOR DENSITY.

20. FILLING UNDERNEATH THE STRUCTURAL ELEMENTS, WHEREVER REQUIRED,


TOP RING TOP RING SHALL BE DONE IN UNIFORM LAYERS NOT EXCEEDING 150MM THICK OR AS
BEAM BEAM CIRCUMFERENTIAL PER CONTRACT SPECIFICATION/BOQ.
BOTTOM
R8 21. LOCATION & ORIENTATION OF THE OHT PIPE PENETRATIONS, PIPE SUPPORT
50 12#@200
0 ARRANGEMENT SHALL BE AS PER APPROVED OHT LAYOUT AND THIS
R8 LA
95 P DRAWING SHALL BE READ IN CONJUNCTION WITH APPROVED GAD.
0 Ld
22. CONTRACTOR SHALL BE RESPONSIBLE FOR CONCRETE MIX, QUALITY,
P SHUTTERING DESIGN AND SAFETY, CONCRETE CURING, WORKMANSHIP,
LA P
TY SITE RISKS AND ACCIDENTS DUE TO PREMATURE DE-SHUTTERING, ALL
LIABILITIES OF CONSTRUCTION RISKS.
5 00
R2
23. CONTRACTOR OR HIS ENGINEER WILL BE RESPONSIBLE FOR WORK
00 EXECUTION, SITE EXECUTION AND CHECKING AS PER THIS DRAWING.
R15
24. REFERENCE I.S. CODES:
R1300
24.1. IS 456-2000 - PLAIN AND REINFORCED CONCRETE.
24.2. IS 1893-II-2021 - EARTHQUAKE RESISTANT DESIGN OF STRUCTURE.
A C1 24.3. IS 13920-2016 - DUCTILE DESIGN AND DETAILING OF REINFORCED
- DO
WN CONC STRUCTURE.
24.4. IS 11682-1985 (2003) - CRITERIA FOR DESIGN OF RCC STAGING FOR
OHT

R22
24.5. IS 3370 II 2021 CONCRETE STRUCTURES FOR STORAGE OF LIQUID

25
25. CLEAR COVER
RAILING 25.1. TOP DOME (WATER FACE) = 30MM
WALKWAY 25.2. TOP DOME (OUTER FACE) = 70MM
25.3. BOTTOM DOME (WATER FACE) = 50MM

R4
25.4. BOTTOM DOME (OUTER FACE) = 30MM

45
0
25.5. CONICAL WALLS (WATER FACE) = 50MM
0 25.6. CONICAL WALLS (OUTER FACE) = 30MM
20 OP
@
.T 25.7. RING BEAM (WATER FACE) = 50MM
12# M
U 25.8. RING BEAM (OUTER FACE) = 30MM
RC

0
25.9. BEAM ABOVE GROUND = 30MM

20
C I
25.10. BEAM BELOW GROUND = 40MM
25.11. COLUMN = 40MM

R8
12#@200 25.12. WALKWAY = 30MM

50
25.13. FOUNDATION (TOP & BOTTOM) = 50MM

0
BOTTOM
25.14. WALL (EARTH FACE) = 50MM

R87
0
26. ABBREVIATIONS

250

25
12#@200 26.1. NGL NATURAL GROUND LEVEL
TOP 26.2. FGL FINISHED GROUND LEVEL
26.3. TWL TOP WATER LEVEL
20
0
26.4. EL ELEVATION
26.5. TB TIE BEAM
26.6. DIA. DIAMETER
26.7. MS MILD STEEL
26.8. SS STAINLESS STEEL
26.9. GI GALVANIZED IRON
PLAN AT MRB WALKWAY LEVEL PLAN SHOWING REINFORCEMENT DETAILS OF TOP DOME 26.10. EF EACH FACE
26.11. T&B TOP AND BOTTOM
SCALE: 1:75 SCALE: 1:75
26.12. TYP TYPICAL
26.13. TRB TOP RING BEAM
26.14. MRB MIDDLE RING BEAM
26.15. BRB BOTTOM RING BEAM

27. WATER PROOFING TREATMENT TO BE PROVIDED AT INTERIOR SURFACE OF


EACH FACE
12#@150 THE WATER TANK.

1 SECTION
- SCALE: 1:30
CIRCUMFERENTIAL
TOP AND BOTTOM OUTER FACE OF OUTER FACE OF
12#@150 FOUNDATION FOUNDATION

LAP
Ld STAGGERED LAP STAGGERED LAP
(TYP) (TYP)
P
LA P
TY
BOTTOM RING BEAM

25#@150 25#@150
52

LAP

LAP
TYP

TYP
0
15

R3000 R3000
900 25#@150 EW 900 25#@150 EW
R4000 R4000
R15 R15
00 00
R6000 90 R6000 90
900

900
10#@150 RADIAL R60 R60
TOP AND BOTTOM 0 0

R6000 TO R4000 20#@150 R3000 TO R600 20#@150 R6000 TO R4000 20#@150 R3000 TO R600 20#@150
(CIRCUMFERENTIAL BARS) (CIRCUMFERENTIAL BARS) (CIRCUMFERENTIAL BARS) (CIRCUMFERENTIAL BARS)
2000 1000 3000 2000 1000 3000
FRB FRB

PLAN AT MRB TOP LEVEL DETAIL OF RADIAL & CIRCUMFERENTIAL BOTTOM REINF. OF RAFT DETAIL OF RADIAL & CIRCUMFERENTIAL TOP REINF. OF RAFT
SCALE: 1:40 SCALE: 1:40 SCALE: 1:40