Professional Documents
Culture Documents
Summery progress of sukra dormitory
Summery progress of sukra dormitory
Summery progress of sukra dormitory
No Date Description progress status remarks No Date Description progress status remarks No Date Description progress status remarks
11/5/2022
PERIODE
1. 10/31/2022 Room 1 11 10/31/2022 Main Bar 26 11/5/2022 ROOM 12
A. Paint A. Paint A. Paint
- wall : Painted Finish - wall : Painted On going 20% - wall : Painted On going 60%
- Ceiling : Painted Finish - Ceiling : Painted On going - Ceiling : Painted On going
B. Electrical + Accessories B. Electrical + Accessories
ceiling exc.fan : OK Functional ceiling exc.fan : OK Functional
Lighting : OK Functional Lighting : OK Functional
Electrical instrument : OK Functional Electrical instrument : OFF no power supply
C. AC - No item C. AC - no item
= 421459.1 /60
= 7024.318 BTU/h 3/4 PK
= 556395.3 /60
= 9273.255 BTU/h 1 PK
= 656450.8 /60
= 10940.85 BTU/h 1 PK
= 637116.7 /60
= 10618.61 BTU/h 1 PK
AC 2 PK = +/- 18000 BTU/h
AC 1 ½ PK = +/- 12000 BTU/h
AC 1 PK = +/- 9000 BTU/h
AC ¾ PK= +/- 7000 BTU/h
AC ½ PK = +/- 5000 BTU/h
Room Qty : 1