Sheet 1
200
b
200
C1 C2 b b
C1 C1 C2 A A SECTIONS L2-L2
Wall Plate Level
400
2,900
2,900
A98-BRC Ring Beam Level
2,900
2,900
N N
200
Ground Beam (200X200)
C1 4T16-b, 9Equal Treads@300=2700
C1 C1 C2 B B
B B C1 C2 1400 2700 1300
F1 F1 F1
17R8-32-175mmc/c Links
200
b b
L2 L2
3,000
3,000
A98-BRC
200
3,000
3,000
3000
2,400
b b
C1 C1 C2
250 200
C C Scale 1:15
1a
C C C1 C2
10
1
2f 2f 2f 2f 1d
F1 F1 F1
10
20R x 150
1d
UP
21G x 300
20R x 150 1d
2,310
2,310
UP
2,310
1d
DOWN
1d
First Floor Slab
DOWN
C1 C2 1d
13
14
15
16
17
18
19
20
11
C1 C1 C2 D D
250 200
1d
1c
1500
12
13
14
15
16
17
18
19
20
11
3,400
3,400
1e 1e 1e
3,400
1d
M 1d
2550
M
4T16-b, 1a 1d 1e 1e 1e 1e
= Grade 25
1d
Concrete = Grade 15
1d
15R8-32-175mmc/c Links
1d
C1 L2 L2
1500
C1 C1 C2 E E 200 1d
1d
E E C2 b b 1c 1d
F1 F1 F1 1d
1b
200
2,550
1d
3000
1d
1d
-Starter columns
3,400
3,400
1d 1d
b b
3,400
3,400
350
SECTIONS L2-L2
- Blinding
Notes:
Scale 1:15
Notes:
SECTIONS L3-L3
Scale 1:15
SECTION P-P THRU' STAIR CASE
Wall Plate Level
Ground Beam (200X200) C1 C2 Scale 1:20
1000
C1 C1 C2 F F
400
F F C1
6T12-1b-200 B2
6T12-2f-200 B2
6T12-1c-2oo B2
6T12-1a-200 T2
6T12-2f-200 T2
6T12-1c-2oo T2
1,400
1,400
F1 F1 F1
1,400
1,400
75
200
C2 C2 C2 G G A-98 BRC Mesh
Dpm on 50mm sand Blinding
G G C2 C2 200
200mm well Compacted
F1 F1 F1 4,200 1,400 Hard Core 6T12-b,
200
200
97% MDD Compacted
1 2 3 Marruam
4,200 1,400
17R8-32-175mmc/c Links
1 2 3 Column C1.
GROUND BEAM LAYOUT P
1055
Scale 1:20 L3 L3
P
Beam 200x450
Scale 1:70
FOUNDATION LAYOUT
Beam 200x200
3000
14T12-1d-200 B1
8T12-1d-200 T1
2,400
7T12-1e-200 B1
Scale 1:70 7T12-1e-200 T1
4T12 6T12-1e-200 B1
200
6T12-1e-200 T1
c
c
200
R8-200C/C c
Links R8-@ 175c/c
200 c 6T12-c Bars
2110
200 14T12-1d-200 B1
c
b b b b c 8T12-1d-200 T1
75mm Kicker
200
SECTIONS L3-L3
200
4T16-b, b b
200mm Scale 1:15
SECTIONS na-na Plinth wall First Floor Slab
1055
Starter bars Scale 1:15
b b
250 200
100mm oversite RC Slab with
A-98 BRC Mesh
Dpm on 50mm sand Blinding
SECTIONS na-na 200 200
Scale 1:15 200
Depth To Be determined on site
200
200
Hard Core
SECTION THRU'
6T12-1b-200 B2
97% MDD Compacted
6T12-1a-200 T2
GROUND BEAM 5600
6T12-1f-200 T2
Marruam
R8-32-150mmc/c Links
na na
R8-32-175mmc/c
15R8-32-175mmc/c Links
STAIRCASE FLOOR PLAN
150mm Thick Oversite Concrete of Grade 20 L3 L3
with a Top Reinforcement of A-98 BRC Mesh Scale 1:20
300
200
100mm Blinding 250mm Thick Hard core Filling, Blinded with c
100
2,550
Fine Sand, and Covered with 1000 gauge Dpm c
3000
02 02 02 02 02 02 02 02 02 R8-@ 175c/c
Well watered and Compacted imported natural c 6T12-c Bars
1,300 Marruam filling,rolled in 200mm thick Layers, c
Depth To Be determined on site
350
Scale 1:25 200mm thick wall,with well burnt clay bricks,
SECTIONS L3-L3
bedded and jointed in cement sand mortor (1:4)
Scale 1:15
1,300
1000
200 Well watered and Compacted imported natural
550 550 Marruam filling,rolled in 200mm thick Layers,
to 90% MDD AASHTO
9T12-02-150C/C B1
75
A-98 BRC Mesh
Dpm on 50mm sand Blinding
1,300
Hard Core
Q Q 600 600 97% MDD Compacted
Marruam
Column C2.
9T12-02-150C/C B2
WALL STRIP FDN WALL STRIP FDN Scale 1:20
PROJECT NAME & ADDRESS CLIENT Drawn By Supervised By Revision to be encased in 150mm thick concrete sorround
Drafted & designed by
General Notes
ARCHITECT
-All work to be strictly in accordance to the standard
-All sanitary works to the approved standards of
M.Shafik M.Shafik -Unless otherwise stated the dimensions are in mm. specifications and notes.
to be built on plot ...,Block ...., LULE RONALD rather, should use writen dimensions.
and all other relavant drawings
-All roads,storm water,drainage and foul sewage to civil
-This drawing is a copyright (c) engineers drawings.
AS SHOWN JUNE 2024 -Depth of foundation to be determined on site
Matuga,Wakiso District. -All levels and dimensions to be checked on site
-Permanent Vents to be included above all doors and
before building work commences. -A single layer of 3- ply bituminous felt to be provided.
windows
PROJECT NO. -Any discrepancies to be reported to the office of the
-Drain pipes passing under tarmac, drive ways, and building with mosquito gauze.This does not apply to toilet doors
consultant,
GSPublisherVersion 0.42.100.100