TELECOM EQUIPMENT AND

CABLE ROUTE LAYOUT - OUTDOOR


DESIGN OF FUEL SUPPLY
PROJECT IN NPPIA

F1 15 Jul 21 IFA

F0 29 Jun 21 IFA

A 22 Nov 20 IFR

REV. DATE STATUS REVISION RECORD ISSUED BY CHECKED BY APPROVED BY

DESIGN OF FUEL SUPPLY PROJECT IN NPPIA CONSULTANT

COMPANY Electronic Filename


SHEET 01 of 3 SCALE NONE
A1 PAPER
PROPOSED EXTENSION)

UP

CONSTRUCTION
PHASE 1
CONSTRICTION

PHASE 2 CONSTRUCTION
PHASE 1

(FUTURE) NOTE 15
PHASE 2 CONSTRUCTION
(FUTURE)NOTE 14

PATCH
GREEN DN.
PROPOSED EXTENSION)

F1 15 Jul 21 IFA KC JPJ PNR

F0 29 Jun 21 IFA KC JPJ PNR

A 22 Nov 20 IFR ISSUED FOR REVIEW MSD JPJ PNR

REV. DATE STATUS REVISION RECORD ISSUED BY CHECKED BY APPROVED BY

DESIGN OF FUEL SUPPLY PROJECT IN NPPIA CONSULTANT


UP

COMPANY Electronic Filename


SHEET 3 of 3 SCALE 1:400
A1 PAPER

1:1 SIZE
F1 15 Jul 21 IFA ISSUED FOR ACKNOWLEDGE KC JPJ PNR

F0 29 Jun 21 IFA ISSUED FOR ACKNOWLEDGE KC JPJ PNR

A 22 Nov 20 IFR ISSUED FOR REVIEW MSD JPJ PNR

REV. DATE STATUS REVISION RECORD ISSUED BY CHECKED BY APPROVED BY

DESIGN OF FUEL SUPPLY PROJECT IN NPPIA CONSULTANT

COMPANY Electronic Filename


SHEET 3 of 3 SCALE 1:250
A1 PAPER

1:1 SIZE
Comment Response Sheet (CRS)

Contract No. Owner TOTAL / CNAF / PTTOR


Project No. 20218 Prepared by PENSPEN Date 15-JUL-2021
Document Number 80-1-20218-CAM-004 Rev. No. of Commented F0 Sheet 1 of 1
Document Title TELECOM EQUIPMENT AND CABLE ROUTE LAYOUT - OUTDOOR

Section
No. Comment Response By Date Remark
/Page

1 2 PTZ 1 more here. Noted. Drawing updated. PENSPEN 15-07-2021

2 2 PTZ one more here. Noted. Drawing updated. PENSPEN 15-07-2021

No Security System i.e. ACS and CCTV


is envisaged for this area since it’s
2 2 No camera in the INTO-PLANE? PENSPEN 15-07-2021
mainly comprising of offices and parking
area.

Additional Notes (if any) Attachment:

Distribution: