SURVEY PORTION OF NEW CHURCH BUILDING

NNAMDI AZIKIWE UNIVERSITY AWKA,


AWKA SOUTH LOCAL GOVERNMENT AREA,
ANAMBRA STATE.

PRESENTED

BY
BRIGHT IZUCHUKWU EZENWA
2022334048
GROUP K

22nd APRIL, 2024.

1
INSTRUMENT USED
A. Total station
B. Reflector
C. Pegs
D. Cutlass
METHODOLOGY

The Method Used Are, Coordinate Method With Total Station, While The Data’s Are
Obtained In Clockwise i.e A, B, C, And D.

RESULTS OBTAINED

The Results Obtained From Using Total Instrument At Each Station In Clockwise:

STATION COORDINATES
EASTING NORTHING
A 518447.635 248266.634
B 518429.321 248293.621
C 518443.320 248300.326
D 518462.094 248274.876

PROBLEM ENCOUNTERED

1 Difficulties In Sighting The Reflector Due To Trees Obstruction.


2 Difficulties In Location Of The Controls

RECOMMENDATION

The Department Should Check The Survey Instruments/Equipments, If They Are All Still
In Order Of Use And Replace Those That Are Not Good.