Product Development & Engineering Capability

• When Value Engineering comes to be discussed, the most action


is to be taken around the first stages of a product life cycle (LCC)
• All the stages on the development of the product are
affected/benefited directly or indirectly by VE
Cost of Changes increases as impact of changes decreases

Answer …….Product development is working on VE (Value Engineering), and


other teams are working on VA (Value Analysis).
Improving Quality of Manufacturing Process
➢ VA/ VE is a systematic, low-cost approach to assessing
the “value” of a project.
➢ Typically, VE on projects can be used to gain the
benefits
➢ Cost reductions

1. Time savings (schedule savings)

2. Quality improvements

3. Isolation of design deficiencies


Corporate Training Modules
Geometric Dimensioning & Tolerances Sheet Metal Part Maunufacturing
Fundamentals of GDNT Creating Value ( Yield Improvement) in Stamping Process
Blue Prints/ Drawings reading and Understanding Dies Design best practice for very high tensile steel
Limit, Fits & Tolerances Die Maintenance Technique
GDNT Advance New Die Development Process
Productivity Improvement in Stamping Process

Total Productive Maintenance (TPM) Lean Thinking & Lean Management


TPM Champion Lean Champion
7 Steps of Autonomous Maintenance (Jishu Hozen) Lean Quick Changeover (SMED)
Initial Phase Development Management Way of Toyota - Lean manufacturing System
Focused Improvement - 16 Losses & OEE improvement Toyota A3 Tool (Toyota Business Practice)
How to Calculate OEE ? How to improve OEE, Productivity

Basics of Manufacturing Excellence Value added Quality Management Systems


Applied 5S PPAP & APQP
Kaizen for maufacturing SPC ( Statistical Process Control
Seven QC Tools : Deep anlysis and problem solving Zero Defect Quality Through Jidoka, Poka Yoke
Seven Steps of Problem Solving CAPA - Problem Solving Technique
Root Cause & 5 Why Analysis Total Quality Management (TQM)
Visual Management, 3 M Waste Elimination Global 8D - rapid problem solving Technique
VA/ VE for cost reduction Toyota A3 Tool - Proactive Problem Solving Technique
Ashish Aggarwal Corporate Trainer Mob no : 9643002507. 9873191528
Youtube Channel name : Ashish Aggarwal Corporate
Gmail : ashish1528a@gmail.com Trainer

You might also like