Contractor: Miraj Projects Company FZE DAILY PROGRESS REPORT Date: Friday 28-06-2024
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 35 ºC Location Open yard- Phase 1 (SPA)
Page 1 of 17
Project name Assets Preservation and General Maintenance Services
Contractor: Miraj Projects Company FZE DAILY PROGRESS REPORT Date: Friday 28-06-2024
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 35 ºC Location Open yard- Phase 1 (SPA)
TABLE OF CONTENTS
Page 2 of 17
Project name Assets Preservation and General Maintenance Services
Contractor: Miraj Projects Company FZE DAILY PROGRESS REPORT Date: Friday 28-06-2024
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 35 ºC Location Open yard- Phase 1 (SPA)
Page 3 of 17
Project name Assets Preservation and General Maintenance Services
Contractor: Miraj Projects Company FZE DAILY PROGRESS REPORT Date: Friday 28-06-2024
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 35 ºC Location Open yard- Phase 1 (SPA)
DAY SHIFT
DAILY ACTIVITIES
Sub Total 8
MONTHLY ACTIVITIES
In progress
COMPARTMENT NO. 6,
SPM4- CALM BUOY COMPARTMENTS
HYDRAULIC
ACCUMULATOR UNIT
1. Oil leakage observed from
the Tie-In connection of
TP3A belongs to A-M5401.
(Refer to photo 1.1)
2. Oil leakage observed from
the Tie-In connection of
TP5A belongs to A-M5401.
(Refer to photo 1.2).
Manual valves except the surge relief valve in
3. Oil leakage observed
M4401.10 compartment #4 (surge piping) shall be operated
(open/close) to check proper functioning, Grease
from the tube fitting of TP4B
belongs to A-M5403.
gearboxes.
4. Oil leakage observed from
the tube fitting of TP6B
belongs to A-M5404.
5. Oil leakage observed from
the tube fittings of TP5B
belongs to A-M5404.
(Refer to photo 1.3).
General:
1. Internal corrosion is
evident in the sounding
pipe, metal corroded and
flakes off, the corrosion
debris accumulated at the
floor of compartment.(Refer
M4401.11 Visually inspect the piping SPM4 M 1 1 N
BG,AK,
KP,SH
35 35
to photo 1.4).
2. Plain washer (one)
number of Enlarged
Manhole was found missing
(Not available) (Refer to
photo 1.5).
3. Paint deterioration was
noted on both Equipment
and Enlarged manholes
(Refer to photo 1.6)
Compartment#4 :
1. One set of hexagon bolt
and plain washer of Access
Enlarged Manhole were
found missing/unavailable
and not stored separately
(Refer to Photo 1.7).
2. The Access Equipment
Manhole rubber gasket has
been degraded due to
deterioration caused by
Check each compartment for water ingress via aging (Refer to Photo 1.8).
M4401.12 sounding plugs. Any water presents should be
removed, and all seals re-instated.
3. Paint/Coating of Access
Enlarged Manhole cover was
deteriorated and general
corrosion observed due to
aging (Refer to Photo 1.9).
Page 4 of 17
Project name Assets Preservation and General Maintenance Services
Contractor: Miraj Projects Company FZE DAILY PROGRESS REPORT Date: Friday 28-06-2024
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 35 ºC Location Open yard- Phase 1 (SPA)
Check all spools are stored safely and properly (if not (Refer to photo: 3)
L5505.27 stored properly as required, shall be reported with
photos).
L5505.31 Check all spools are stored safely and properly (if not
stored properly, shall be reported with photos).
Sub Total 66
Page 5 of 17
Project name Assets Preservation and General Maintenance Services
Contractor: Miraj Projects Company FZE DAILY PROGRESS REPORT Date: Friday 28-06-2024
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 35 ºC Location Open yard- Phase 1 (SPA)
NIGHT SHIFT
J-5001.08 HVAC system/Alarm/Trip status checks.
Sub Total 11
GENERAL ACTIVITIES
1 Cleaning and covering of assets at A1, B2, B6 area. General General 1 Lot 1 Lot N
MN,DK,AB,
SA,KH
30 30
In progress
(Refer to photo: 4)
Sub Total 74
Sub Total 10
Generator
4 Running hours, current consumption reading, fuel
consumption.
MRJ-5278 (2)
MRJ-506852 (3)
D 2 2 Y MSI 1 1 -------
Sub Total 5
ASSET PRESERVATION AND GENERAL MAINTENANCE - SUMMARY OF OPEN YARD MAN-HOURS
S/N Technical Activities Manhours
1 Electrical & Instrumentation - Daily Activities 8
8 Night Shift 11
9 General Activities 74
Support Activities
Sub Total 0
Support Activities
Sub Total 0
Page 6 of 17
Project name Assets Preservation and General Maintenance Services
Contractor: Miraj Projects Company FZE DAILY PROGRESS REPORT Date: Friday 28-06-2024
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 35 ºC Location Open yard- Phase 1 (SPA)
Hours
S/N Owned/Hired Equipment No. S/N Personnel Code Discipline
(each)
1 Generator 200KVA (DAY SHIFT) MRJ-5278 (2) 1 16 Technical Man-Hours Hrs
12 Kuldeep KP 10 Helper
15 Khalid KH 10 Helper
Total 164
Support Man-Hours
21 Jayaganesh D JD 10 DCC
Total 98
Open yard
98
(S)
Sub Contractor
10
(C)
3 Total 272
Open yard
1 Total hours / Technical Activities 0
Category 2&3
0
Open yard
Category 2&3
2 Total hours / Support Activities 0
Sub Contractor
(C)
3 Total 0 Total 0
Support Man-Hours
Total 0
*Legend: WO - Weekly Off, SL- Sick Leave, AL- Annual Leave, EH - Eid Holiday, PH - Public Holiday, L - Leave,
A - Absent
S/N Additional Notes (important items started or completed, major equipment received, visitors, etc)
Page 7 of 17
Project name Assets Preservation and General Maintenance Services
Contractor: Miraj Projects Company FZE DAILY PROGRESS REPORT Date: Friday 28-06-2024
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 35 ºC Location Open yard- Phase 1 (SPA)
PHOTOS
1. Monthly maintenance of SPM4.
1.1 1.2
1.3 1.4
1.5 1.6
Page 8 of 17
Project name Assets Preservation and General Maintenance Services
Contractor: Miraj Projects Company FZE DAILY PROGRESS REPORT Date: Friday 28-06-2024
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 35 ºC Location Open yard- Phase 1 (SPA)
1.7 1.8
One set of hexagon bolt and
plain washer of Access Paint deterioration
Enlarged Manhole were was noted on both
found missing/unavailable Equipment and
and not stored separately. Enlarged manholes.
Paint/Coating of Access
Enlarged Manhole cover was
1.9 deteriorated and general
corrosion observed due to
aging.
NO PHOTO
Page 9 of 17
Project name Assets Preservation and General Maintenance Services
Contractor: Miraj Projects Company FZE DAILY PROGRESS REPORT Date: Friday 28-06-2024
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 35 ºC Location Open yard- Phase 1 (SPA)
3. Monthly visual inspection of VS1 Subsea Spools, Bends and Concrete Coated Pipes.
Page 10 of 17
Project name Assets Preservation and General Maintenance Services
Contractor: Miraj Projects Company FZE DAILY PROGRESS REPORT Date: Friday 28-06-2024
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 35 ºC Location Open yard- Phase 1 (SPA)
Signature:
Page 11 of 17
Project name Assets Preservation and General Maintenance Services
Friday
Contractor: Miraj Projects Company FZE DAILY PROGRESS REPORT Date:
28-06-2024
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 36 ºC Location Warehouse LV-19 C & D
Page 12 of 17
Project name Assets Preservation and General Maintenance Services
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 36 ºC Location Warehouse LV-19 C & D
Sub Total 10
1 Warehouse 10
Sub Total 10
Support Activities
2 Support Activities ( 1 Person x 8 hours, 3 Persons x 10 hours and 1 Person x 12 hours ) 50
3 Sub Contractor 0
Sub Total 50
Hours
S/N Owned/Hired Equipment No. S/N Personnel Code Discipline
(each)
1 SUV/MUV four wheel drive 2 12 Technical Man-Hours Hrs
Total 10
S/N Manhour
Support Man-Hours
Sub Contractor
0
(C)
3 Total 60
Page 13 of 17
Project name Assets Preservation and General Maintenance Services
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 36 ºC Location Warehouse LV-19 C & D
Total 0
Warehouses
0
(S)
Total hours/ Support
2 0
Activities
Sub Contractor
0
(C)
3 Total 0
*Legend: WO - Weekly Off, SL- Sick Leave, AL- Annual Leave, EH - Eid Holiday,
PH - Public Holiday, L - Leave, A - Absent
S/N Additional Notes (important items started or completed, major equipment received, visitors, etc)
Page 14 of 17
Project name Assets Preservation and General Maintenance Services
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 36 ºC Location Warehouse LV-19 C & D
PHOTOS
1. Temperature monitoring and maintaining LV-19 D 2. Document Storage room temperature LV-19 C
3. Hosusekeeping
Signature:
Page 15 of 17
Project name Assets Preservation and General Maintenance Services
Contractor: Miraj Projects Company FZE DAILY PROGRESS REPORT Date: Friday 28-06-2024
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 36 ºC Location SPA & LV-19 C&D
Page 16 of 17
Project name Assets Preservation and General Maintenance Services
Contractor: Miraj Projects Company FZE DAILY PROGRESS REPORT Date: Friday 28-06-2024
Report No. 10200-00-F-RA-1230-D28062024-B1 Weather Sunny Temp. (Max) 46 ºC (Min) 36 ºC Location SPA & LV-19 C&D
8 Night Shift 11
9 General Activities 74
11 Warehouse 10
Sub Total 174
Support Activities
Sub Total 0
Support Activities
Sub Total 0
Open yard
98
(S)
2 Warehouses
50
(S)
Total hours / Support Activities 158
CA-005-MB-108 &
0
LV-20 C
Sub Contractor
10
(C)
3 Net Total 332
S/N TOTAL CUMULATIVE MAN-HOURS FOR ALL WORKS DONE BY MIRAJ PROJECTS
Open Yard 0
Total Pre-emptive Manhours for
Category 2&3 Assets / Technical
Warehouses 0
1 0
Total Pre-emptive Manhours for
Sub Contractor
Category 2&3 Assets / Support 0
(C)
Activities
Total Manhours for Assets preservation and General maintenance
2 332
Services
3 Total cumulative manhours up to previous day 319,098
Signature: