FOUNDATIONS
27880 They shall generally be taken 1200mm
2400 4100 2400 4100 6500 6500 1870 min. below existing ground level after
removal of organic layer and all
excavations to be confirmed by the
RB-1 (250x400) Engineer before concrete blinding is laid.
1
3000 3000 3000 3000 3000 3000 3000 3000 3000
Weak pockets of bearing strata to be dug
700
RB-11 (250x400)
characteristic cube strength of 25N/mm²
RB-5 (250x400)
RB-7 (250x400)
RB-8 (250x400)
T1
6200
6200
T1 T1 T1 T1 T1 T1 T1
T1 T1
3. REINFORCEMENT
(a) High Tensile Ribbed bars to BS4461and
1250
2836
M.C = Mass Concrete
R.C = Reinforced Concrete
T = Top
T2 T2
6000
6000
B = Bottom
All dimensions to be confirmed on site.
150x50x2.0mm Z- Purlins at 1250mm c/c
This drawing must be read in conjunction with
2836
2836
the relevant architectural,Mechanical,Electrical
RB-6 (250x400)
RB-6 (250x400)
RB-9 (250x400)
RB-6 (250x400)
drawings.
Any discrepancy MUST be brought to attention
T2 T2 of the project manager.
24400
24400
3
RB-3 (250x400) RB-4 (250x400)
14% SLOPE 14% SLOPE
2836
2836
No. Description Date
T2 T2
6000
6000
951 1250 1250 1250 1250 1250 1250 1250 1250 951
2836
2836
T2 T2
RB-2 (250x400)
4
1250
Client
MINISTRY OF EDUCATION AND SPORTS - UGANDA
RB-10 (250x400)
UGANDA SKILLS DEVELOPMENT PROJECT (USDP)
RB-5 (250x400)
RB-7 (250x400)
RB-8 (250x400)
1250
14% SLOPE
Project Name Construction of Facilities at selected Technical
T1 T1 Institutions in Uganda under Five (5) Lots
6200
6200
T1 T1 T1 T1 T1 T1 T1 T1 (Bukalasa Cluster)
1250
Location Rwentanga Farm Institute
Mbarara District Uganda
Drawing Titile
1250
Scale
(LIBRARY) NTS
ROOF BEAM & TRUSS DETAILS Date
3000 3000 3000 3000 3000 3000 3000 3000 3000 Nov, 2020
700
REG Sign. DR. No
No.
5 DESIGNED BY
RB-1 (250x400) N.E ST FN
DRAWN BY
N.E
6500 6500 6500 6500 2000
27880
CHECKED BY
Y.D
STA1
2
APPROVED BY
D.M