Download as pdf
Download as pdf
You are on page 1of 2
SR CHEMICAL INDUSTRIES LTD. GROW WITH GREEN Ref: SRCIL/WO-GEO/2018-01 Date: 16/05/2018 To GEO STEEL (BD)LTD Suit No: 101-2, 2" Floor, Akram Tower 199, Shahid Nazrul Islam Sharani Bijoy Nagar, Dhaka-1000 Attention: Engr. Ziaur Rahman, Managing Director, Geo Steel (BD) Ltd. Cell: 01848-305656. ‘Subject: Work Order for Procurement/Supply of the Materials/Goods for Work of Factory Shed of Pre- Fabricated Steel Structure of “SR Chemical Industries Ltd.”. We would like to inform you that with reference to discussion with you about price Quotation for fabrication supply and erection of Pre-Fabricated steel structure dated on May, 16, 2018, we are pleased to issue a work order for supplying fabrication supply and erection of Pre-Fabricated steel structure as per below mentioned specification with Terms and condition. SE Work Description With Specification Rate (Tk) | Amount in Taka No (After Discount) Ol | Reference No: GEOSTEEL KBML2018-20 ‘AS per Date: 16/05/2018 Proposal | 1,09,85,961.00 Work’s Name: Factory Shed (warehouse) Project Area: 20840sft +5656sft = 26496sft Project Location: Sherpur. As per your submitted proposal © Grand Total Amount: Taka One Core Nine Lac Eighty Five | 1,09,85,961.00 ‘Thousand Nine Hundred & Sixty One Taka Only.) * The total price of work order is. Tk 1,09,85,961.00 (Taka: One core Nine Lac Eighty Five thousand nine hundred & sixty one Taka Only.) Prices are included all expenses ie; (Carrying, Loading & Unloading, Transport etc.) + Completion of works should be done at the prescribed work schedule ( as offered). + Finally total amount may increase/decrease due to increase/decrease of total plan area or any other items added as per our requirements according to unit price & that will be submitted in final bill + Geo Steel will provide their own erection team. + Geo Steel will provide crane for erecting the main structure. ‘SR GROUP: 46 Lake Dive oad Nkunia 1, Dhaka 1228, Banglades, Phone: 9666774444 Merten ken gh), SRCHEMICAL , INDUSTRIES LTD. ‘The Payment to be made by the Ist Party 10% along with the work order as advance and project will be run. + 2° payment 20%, 3° payment 20%, 4" payment 20%, $® payment 20%, SR Chemical will release rest 10% of total amount after 7 (days) from the date of completed successfully and handover the work to SR Chemical Industries Limited. ‘All payments shall be in favor of “GEO STEEL (BD) LTD.’ against from the authorized person. wuance of money receipt You (Geo Steel BD Lid) will provide 20 (Twenty years) warranty of Sheeting material but the warranty will void if any chemical reaction occur. 4 You(Geo Stee! BD Ltd) will provide 30 (Thirty years) of Super Structure Warranty. + You (Geo Steel BD Ltd)will provide performance Certificate before handover of works. RMS'&\CONDITIONS:! 1. Product Quality & Quantity, Scope of the Work, Material Specification, Building Description, would be best as per your provided proposal, (SRG-16/05/2018). 2. Workers should be allowed to stay within the premises. 3. An Engineer must supervise the project until complete the works properly or handover. 4, Af there is any complain regarding Short Supply, Damaged Materials & Defective Materials then you should replace it ASAP. 5. All primary materials like column & rafter will be cleaned and painted one coat of red oxide zinc chromate primer, excluding enamel painting. 6. We should provide necessary electricity for erection of the building. 7. Erection schedule stated is based on the uninterrupted power supply at site and weather condition. 8. “SR Chemical Industries Ltd” should provide a good working environment in the site. 9. We will provide Labor Accommodation and electricity in factory. 10. At the time of working at Project site all the safety regarding this issue will be provided by Geo Steel (BD) Ltd. 11. At the time of working at project site if there any Accident Occur by the manpower of seller , Injure, Police Case or any other claim will be responsible, monitored and liability will be taken by Geo Steel (BD) Ltd. 12. If'we (SR Chemical) faces any kind of financial loss incurred by manpower of Geo Steel (BD) Ltd. at the time of works will be borne by you. 13. You should try to maintain all the environmental issues and rules and regulation of the Factory site, Smoking, Drinking is totally Prohibited at the site of Factory. 14 SR Chemical Industries Ltd”. shall be changed, modify and cancel the terms and conditions of the Work Order without any prior of Notice. ‘Thanking you and make sure the best co-operation. le xX Asif Rabbai Managing Director SR Group Enclosed: Proposal /Quotation of Geo Steel (BD) Ltd.

You might also like