Download as pdf
Download as pdf
You are on page 1of 2
SR CHEMICAL INDUSTRIES LTD. TH GREE Ref: SRCIL/WO-GEO/2018-14 To GEO STEEL (BD)LTD Suit No: 101-2, 2 Floor, Akram Tower 199, Shahid Nazrul Islam Sharani Bijoy Nagar, Dhaka-1000 Attention: Engr. Ziaur Rahman, Man: Cell: 01848-305656, Date: 20/12/2018 ing Director, Geo Steel (BD) Ltd. pabect: Work Order for Procurement/Supply of the MaterialGoods for Work of Factory Pre- Fabricated Stee! Structure of “SR Chemical I We would like to inform fabrication supply and erection of Pre-Fabricated steel pleased to issue a work ‘You that with reference to discussi order for supplying fabrication supply and erection of tries Ltd”, ion with you about price Quotation for structure dated on 27/11/ 2018, we are Pre-Fabricated steel Structure as per below mentioned specification with Terms and conden [ SC] Work Description Wah Sposfication Rate (TRY | Amount in Taka] |_No (Afier Discount) | O1 ” | Reference No: GEOSTEEL SRG 2018-34 ‘As per | | Date: 277112018 Proposal | — 1,60,19,835.00 || Work's Name: ey | | | ' Pipe Rack (1-11) | | | Pract Area: 000 5a | Project Location: Sherpur, Bogura | | As per your submitted proposal | | (Tar eae | "Grand Total Amount: L MODE OF PAYMENT: The total price of work order e is. Tk 1,61,80,033,00 ‘Thousand and Thirty Three only.) Prices are included all expenses ie; (Carrying, Loading Completion of works should be done atthe prescribed tee other items added as final bil Geo Stee! will provide their own erect Per our requirements according n team, oe Finally total amount may increase/decrease due to inerease/decrease Geo Steel will provide crane for erecting the main structure Eig | 161,80,033.00 (Taka One Crore Sixty One Lac Eighty 1g & Unloading, work schedule ( Transpon etc.) as offered), of total plan area or any to unit price & that will be submitted in SR CHEMICAL ‘TERMS OF PAYMENT: BPE 2 2 rt ‘ The Payment tobe made by the Ist Party 10% along wth he ‘sa DUSTRIES LTD. will be run. e : ne & 2" payment 20%, 34 payment 20%, 4 payment 20%, $* payment 20%, SR Chemical will release rest 10% ‘of total amount after 7 (days) from the date of completed successfully and handover the work to ‘SR Chemical Industries Lit +All payments shall be in favor of ‘GEO STEEL (BD) LTD.’ against issuance of money receipt fiom the authorized person. WARRANTY & SERVICE: $ % You (Geo Stee! BD Lid) will provide 20 (Twenty years) warranty of Sheeting material but the warranty will void if any chemical reaction occur. 4 You(Geo Steel BD Lid) will provide 30 (Thirty years) of Super Structure Warranty. 4 You (Geo Stee! BD Ltd)will provide performance Certificate before handover of works. ‘TERMS & CONDITIONS: MIRTLE s 1. Product Quality & Quantity, Scope of the Work, Material Specification, Building Description, would be best as per your provided proposal, (SRG-27/11/2018). ‘Workers should be allowed to stay within the premises. ‘An Engineet must supervise the projet until complete the works properly or handover. It there is any complain regarding Short Supply, Damaged Materials & Defective - Materials then you should replace it ASAP. 5. All primary materials like column & rafter will be cleaned and painted one coat of red ‘oxide zine chromate primer, excluding enamel painting. 6. We should provide necessary electricity for erection of the building. 7. Erection schedule stated is based on the uninterrupted power supply at site and weather condition. 8, “SR Chemical Industries Ltd” should provide a good working environment in the site. 9, We will provide Labor Accommodation and electricity in factory 10, At the time of working at Project site all the safety regarding this issue will be provided by Geo Steel (BD) Lid, 11. At the time of working at project site if there any Accident Occur by the manpower of seller, Injure, Police Case or any other claim will be responsible, monitored and liability will be taken by Geo Steel (BD) Ltd. 12 If we (SR Chemical) faces any kind of financial loss incurred by manpower of Geo Steel (BD) Ltd. at the time of works will be borne by you. 13. You should try to maintain all the environmental issues and roles and regulation of the Factory site. Smoking, Drinking is totally Prohibited at the site of Factory, 14 SR Chemical Industries Lid”. shall be changed, modify and cancel the terms and conditions of the Work Order without any prior of Notice. Thanking you and make sure the best co-operation. pe Ma. Nuruzzamai CEO ‘SR Chemical Industries Limited Enclosed: Proposal /Quotation of Geo Steel (BD) Ltd, ‘SR GROUP: 4 Lake Dive oad Nina 1 Dhata 1229, a Phone 0965677444

You might also like