SR CHEMICAL
INDUSTRIES LTD.
TH GREE
Ref: SRCIL/WO-GEO/2018-14
To
GEO STEEL (BD)LTD
Suit No: 101-2, 2 Floor, Akram Tower
199, Shahid Nazrul Islam Sharani
Bijoy Nagar, Dhaka-1000
Attention: Engr. Ziaur Rahman, Man:
Cell: 01848-305656,
Date: 20/12/2018
ing Director, Geo Steel (BD) Ltd.
pabect: Work Order for Procurement/Supply of the MaterialGoods for Work of Factory
Pre- Fabricated Stee! Structure of “SR Chemical I
We would like to inform
fabrication supply and erection of Pre-Fabricated steel
pleased to issue a work
‘You that with reference to discussi
order for supplying fabrication supply and erection of
tries Ltd”,
ion with you about price Quotation for
structure dated on 27/11/ 2018, we are
Pre-Fabricated steel
Structure as per below mentioned specification with Terms and conden
[ SC] Work Description Wah Sposfication Rate (TRY | Amount in Taka]
|_No (Afier Discount) |
O1 ” | Reference No: GEOSTEEL SRG 2018-34 ‘As per
| | Date: 277112018 Proposal | — 1,60,19,835.00
|| Work's Name:
ey | | |
' Pipe Rack (1-11) |
| | Pract Area: 000 5a
| Project Location: Sherpur, Bogura |
| As per your submitted proposal | |
(Tar eae |
"Grand Total Amount:
L
MODE OF PAYMENT:
The total price of work order
e
is. Tk 1,61,80,033,00
‘Thousand and Thirty Three only.)
Prices are included all expenses ie; (Carrying, Loading
Completion of works should be done atthe prescribed
tee
other items added as
final bil
Geo Stee! will provide their own erect
Per our requirements according
n team,
oe
Finally total amount may increase/decrease due to inerease/decrease
Geo Steel will provide crane for erecting the main structure
Eig | 161,80,033.00
(Taka One Crore Sixty One Lac Eighty
1g & Unloading,
work schedule (
Transpon etc.)
as offered),
of total plan area or any
to unit price & that will be submitted inSR CHEMICAL
‘TERMS OF PAYMENT: BPE 2 2 rt
‘ The Payment tobe made by the Ist Party 10% along wth he ‘sa DUSTRIES LTD.
will be run. e : ne
& 2" payment 20%, 34 payment 20%, 4 payment 20%, $* payment 20%, SR Chemical will release rest 10%
‘of total amount after 7 (days) from the date of completed successfully and handover the work to
‘SR Chemical Industries Lit
+All payments shall be in favor of ‘GEO STEEL (BD) LTD.’ against issuance of money receipt
fiom the authorized person.
WARRANTY & SERVICE: $
% You (Geo Stee! BD Lid) will provide 20 (Twenty years) warranty of Sheeting material but the
warranty will void if any chemical reaction occur.
4 You(Geo Steel BD Lid) will provide 30 (Thirty years) of Super Structure Warranty.
4 You (Geo Stee! BD Ltd)will provide performance Certificate before handover of works.
‘TERMS & CONDITIONS: MIRTLE s
1. Product Quality & Quantity, Scope of the Work, Material Specification, Building
Description, would be best as per your provided proposal, (SRG-27/11/2018).
‘Workers should be allowed to stay within the premises.
‘An Engineet must supervise the projet until complete the works properly or handover.
It there is any complain regarding Short Supply, Damaged Materials & Defective
- Materials then you should replace it ASAP.
5. All primary materials like column & rafter will be cleaned and painted one coat of red
‘oxide zine chromate primer, excluding enamel painting.
6. We should provide necessary electricity for erection of the building.
7. Erection schedule stated is based on the uninterrupted power supply at site and weather
condition.
8, “SR Chemical Industries Ltd” should provide a good working environment in the site.
9, We will provide Labor Accommodation and electricity in factory
10, At the time of working at Project site all the safety regarding this issue will be provided
by Geo Steel (BD) Lid,
11. At the time of working at project site if there any Accident Occur by the manpower of
seller, Injure, Police Case or any other claim will be responsible, monitored and liability
will be taken by Geo Steel (BD) Ltd.
12 If we (SR Chemical) faces any kind of financial loss incurred by manpower of Geo
Steel (BD) Ltd. at the time of works will be borne by you.
13. You should try to maintain all the environmental issues and roles and regulation of the
Factory site. Smoking, Drinking is totally Prohibited at the site of Factory,
14 SR Chemical Industries Lid”. shall be changed, modify and cancel the terms and
conditions of the Work Order without any prior of Notice.
Thanking you and make sure the best co-operation.
pe
Ma. Nuruzzamai
CEO
‘SR Chemical Industries Limited
Enclosed: Proposal /Quotation of Geo Steel (BD) Ltd,
‘SR GROUP: 4 Lake Dive oad Nina 1 Dhata 1229, a Phone 0965677444