GENERAL NOTES: N REPUBLIC OF THE PHILIPPINES

ALL WORKS SHALL COMPLY WITH THE DPWH STANDARD SPECIFICATON 2004, VOLUME II AND TO THE
SUPPLEMENTAL SPECIFICATOIN AND ADDENDA PERTAINING TO THE PROJECT.
THIS SITE DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE REGIONAL DIRECTOR
NOTES AND SPECIFICATION: REGION I
1. EARTHWORKS/EXCAVATIONS PLANNING AND DESIGN DIVISION
- EXCAVATION SHALL BE IN ACCORDANCE WITH STANDARD SPECIFICATIONS. BRIDGES AND OTHER PUBLIC WORKS DESIGN SECTION
- ALL SUITABLE EXCAVTED MATERIALS SHALL BE USED IN THE BACKFILL FOR STRUCTURES AND OTHER
PURPOSES AND ALL EXCESS MATERIALS SHALL BE DISPOSED OFF DIRECTED. SAN FERNANDO CITY LA UNION

2. EMBANKMENT
- EMBANKMENT SHALL BE CONSTRUCTED OF SUITABLE MATERIALS WHICH IS ACCEPATABLE IN
ACCORDANCE WITH THE CONTRACT AND WHICH BE COMPACTED IN THE MANNER SPECIFIED IN THIS ITEM.
- EMBANKMENTS AND BACKFILLS SHALL CONTAIN NO MUCK, PEAT, SODS, AND OTHER DELETERIONS
MATTERS.
- EMBANKMENT SHALL BE COMPACTED TO A UNIFORM DENSITY OF NOT LESS THAN 95 MASS PERCENT OF BANGAR
THE MAXIMUM DRY DENSITY. SUDIPEN
LUNA
3. CONCRETE WORKS BALAOAN
- CONCRETE SHALL BE CLASS 'A' AND IN ACCORDANCE WITH THE DPWH STANDARD AND SPECIFICATIONS.
SANTOL
- PORTLAND CEMENT, FINE AGGREGATES, COARSE AGGREGATES, SHALL CONFORM TO ALL THE
REQUIREMENTS SHOWN ON THE PLANS OR AS DICTATED. TABLE OF CONTENTS
- ALL STEEL REINFORCEMENT SHALL BE ACCURATELY PLACED IN POSITION SHOWN ON THE PLANS AND BACNOTAN

FIRMLY HELD THERE DURING THE PLACING AND SETTING OF CONCRETE. SAN GABRIEL
SAN JUAN
- SPLICING OF BARS SHALL BE STAGGERD AS FOR AS POSSIBLE AND WITH A MININMUM SEPARATION OF
NOT LESS THAN 40 BAR DIAMETER. BAGULIN
LOCATION MAP
SAN FERNANDO CITY
SITE DEVELOPMENT PLAN
4.MASONRY WORKS SUMMARY OF QUANTITIES
GROUND FLOOR PLAN
LINE AND GRADE
NAGUILIAN
BURGOS
-CONCRETE HOLOWBLOCKS SHALL CONFORM TO THE REQUIREMENT OF NON LOAD BEARING HOLLOW BAUANG SECOND FLOOR PLAN
BLOCKS WITH DIMENSIONS SPECIFIED OR SHOWN ON THE PLANS MORTAR SHALL BE COMPOSED OF ONE FRONT ELEVATION
PART PORTLAND CEMENT AND TWO PARTS FINE AGGREGATES BY VOLUME.
LA UNION REAR ELEVATION
CABA
RIGHT-SIDE ELEVATION
ARINGAY LEFT SIDE ELEVATION
TUBAO SCHEDULE OF FINISH
5. FABRICATED MATERIALS AND HARDWARE
PUGO
AGOO
- STEEL WINDOWS SHALL CONSIST OF ALL FABRICATED MATERIALS FULLY EQUIPPED WITH FIXING
ROOF PLAN
ACCESSORIES AND LOCKING DEVICES AS SHOWN ON THE PLANS AND IN ACCORDANCE WITH THIS STO. TOMAS LONGITUDINAL SECTION
SPECIFICATION. LOUVERS OF FRAME AND VENTILATOR SHALL BE MITERED AND ELECTRICALLY BUTT CROSS SECTION
ROSARIO
WELDED WITH EXPOSED WELDS GROUND SMOOTH. ALL STEEL WINDOWS SHALL BE SET PLUMB AND TRUE IN SCHEDULE OF DOORS & WINDOWS
OPENINGS. THE JOINT BETWEEN THE WINDOW FRAME AND MASONRY SHALL BE CAREFULLY CAULKED. FOUNDATION PLAN
BASEMENT FLOOR FRAMING PLAN LAND USE AND ZONING
- LUMBER OF DOORS AND JAMBS SHALL BE OF REQUIRED OR SPECIFIED. FIRST FLOOR BEAM PLAN
- PLYWOOD FOR VENEER PF HOLLOW CORE FLUSH DOORS SHALL BE 3-PLY, ROTARY CUT, 6MM THICK SECOND FLOOR BEAM PLAN
MARINE PLYWOOD. GENERAL CONSTRUCTION NOTES
GENERAL CONSTRUCTION NOTES
6. CEMENT PLASTER FINISH
LOCATION MAP COLUMN FOOTING DETAIL
- CEMENT MORTAR SHALL BE A MIXTURE OF 1 CEMENT AND 2 SANDS PROPORTIONS. VICINITY MAP DRAWN NOT TO SCALE:
WALL FOOTING DETAIL
SLAB 1 & 2 DETAIL
CONCRETE STAIR DETAIL
7. STEELWORKS
DRAWN NOT TO SCALE: SCHEDULE OF COLUMN AND FOOTING
BEAM SECTION DETAILS
- THE WORK WILL INCLUDE FURNISHING, FABRICATING, HAULING,ERECTING,WELDING AND PAINTINGOF
STRUCTURAL MATERIALS CALLED FOR IN THE SPECIAL PROVISION OR SHOWN ON THE PLANS. ROOF FRAMING PLAN
- ALL ARC WELDING ELECTRODES SHALL BE CLASSIFIED AS REQUIRED FOR THE POSITION , TYPE OF TRUSSES DETAIL
CURRENT AND POLARITY AND OTHER CONDITIONS OF INTENDED USE. SCHEDULE OF TRUSSES
SLAB 1&2 SECTION DETAIL ARCHITECTURAL
- THE CONTRACTOR SHALL ENFORCE THE USE OF APPROVED ACCESSORIES NECESSARY FOR THE
PROTECTION AND CONVENIENCE OF THE WELDERS AND FOR THE PROPER AND EFFICIENT EXECUTION OF THE WORK. INTERIOR CEILING PERSPECTIVE DETAIL
ROOF BEAM- BASE PLATE CONN. DETAIL
8. CORRUGATED METAL ROOFING PURLIN - TOP CHORD CONN. DETAIL
CANOPY DETAIL
-CORRUGATED GALVANIZED IRON (G.I) SHEETS, INCLUDING PLAIN G.I.SHEETS FOR ROOFING
ACCESSORIES SHALL BE COLD-ROLLED MEETING ASTM A 153 AND WITH SPELTER COATING OF ZINC OF NOT LESS GF LIGHTING LAYOUT
X75MM HAVING HEXAGONAL HEADS AND PROVIDED WITH NEOPRENE WASHERS. 2F LIGHTING LAYOUT
THAN 0.381 KG./M², UNLESS OTHERWISE SPECIFIED OR SHOWN ON THE PLANS , ROOFING SHEETS SHALL BE 0.400MM GF POWER LAYOUT
THK. 2F POWER LAYOUT
- ROOF INSULATION SHALL BE FASTENED WITH THREAD CUTTING, ZINC COATED STEEL SCREWS, NO.12
RISER DIAGRAM
SCHEDULE OF LOAD
LOAD COMPUTATION
ELECTRICAL SYMBOLS STRUCTURAL
SPECIFICATIONS

GF PLUMBING LAYOUT
2F PLUMBING LAYOUT
PLUMBING ISOMETRY
SUMMARY OF QUANTITIES SEPTIC TANK DETAIL
PLUMBING NOTES
PLUMBING SYMBOLS

ELECTRICAL

SANITARY

FIRE DEPARTMENT

PERSPECTIVE
PROJECT & LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES LOCATION MAP


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SITE DEVELOPMENT PLAN PAULYNNE A. GATCHALIAN
LOCAL INFRASTRUCTURE PROGRAM, SUMMARY OF QUANTITIES
REGIONAL OFFICE NO. 1 DRAFTSMAN II - COS
CONSTRUCTION OF MULTI-PURPOSE BUILDING
Planning and Design Division PREPARED:
Bridges & Other Public Works Design Section
(BARANGAY HALL)
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
11
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
BRGY. STA. RITA EAST, ARINGAY, LA UNION
JULIUS M. GACETA
ARCHITECT II DATE: DATE: DATE: DATE:
A B C A B C
A B C Area = 61.60 Mts. 7.000 7.000

7.000 3.500 3.500 3.500 3.500

3.500 3.500

5" THK CHB WALL W/ CEMENT CONC CANOPY


0.050M DROP 0.050M DROP
PLASTER & PAINT FINISH BELOW
4 4
4 C.R. C.R.
FL- 2

KITCHEN
FL- 2 FL- 2
DINING

3.000

3.000
FL-1 FL-1
3.000

W A L K W A Y
FL-1

3 3
3

EMBANKMENT
DAY CARE CENTER
FL-1
FL-1
CONFERENCE AREA

3.000

9.000
3.000
FL-1 FL-1
9.000
3.000

BASEMENT INFO 0.850

11.000
2 2 D3 D3
2 1 12" GI RAILINGS 1.000
FL-1

1.000
STAIR
1.000
15 STEPS UP BRGY. CAPTAIN'S

DN
3.000

3.000
FL-2
1.000

FL-1 FL-1
OFFICE

2.000
3.000

FL-2
FL-2

1.000
STAIR
UP
FL-1

EMBANKMENT
STAIR
1.000

UP

1 1

3.500

0.850
1 FL-2

2.000
PROPOSED SLAB
PROPOSED
STONE MASONRY

0.500
2.844 EMBANKMENT 3.303 EMBANKMENT

0.500 7.000 0.500


PROPOSED
9.800 STONE MASONRY
Area = 32.05 Mts. L = 15m

BASEMENT FLOOR PLAN FIRST FLOOR PLAN SECOND FLOOR PLAN


SCALE 1:100 MTS. SCALE 1:100 MTS. SCALE 1:100 MTS.

SCHEDULE OF FINISHES
FL-1 0.60m x 0.60m GLAZED TILES

FL-2 0.30m x 0.30m UNGLAZED TILES


PLAIN CEMENT PLASTER WITH
WL-1 PAINT FINISHED

PROJECT & LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

BASEMENT FLOOR PLAN


REPUBLIC OF THE PHILIPPINES GROUND FLOOR PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SECOND FLOOR PLAN PAULYNNE A. GATCHALIAN
LOCAL INFRASTRUCTURE PROGRAM,
REGIONAL OFFICE NO. 1 DRAFTSMAN II - COS
CONSTRUCTION OF MULTI-PURPOSE BUILDING
Planning and Design Division PREPARED:
Bridges & Other Public Works Design Section
(BARANGAY HALL)
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
11
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
BRGY. STA. RITA EAST, ARINGAY, LA UNION
JULIUS M. GACETA
ARCHITECT II DATE: DATE: DATE: DATE:
LEGEND:

CONTINUATION

7.000 7.000 9.000 9.000


3.500 3.500 3.500 3.500 3.000 3.000 3.000 3.000 3.000 3.000

1.000
TOP OF ROOF BEAM
( ROOF BEAM LEVEL )
3.000

11.000
TOP OF BEAM
( 2ND FLOOR LEVEL )
1.300
3.000

0.500 0.500 VARIES


NGL
11.000

NGL
TOP OF BEAM
( 1ST FLOOR LEVEL )

0.500

0.500

0.500
EMBANKMENT

EMBANKMENT EMBANKMENT

2.800
3.000

FINISH GROUND LEVEL EMBANKMENT

4.400
( @ FRONT )

5.400
TOP OF BEAM
NGL
2.000 ( VARIES )

( BASEMENT )

1.000
LOWER ( NGL )

FRONT ELEVATION REAR ELEVATION LEFT - SIDE ELEVATION RIGHT - SIDE ELEVATION
SCALE 1:100 MTS. SCALE 1:100 MTS. SCALE 1:100 MTS. SCALE 1:100 MTS.
LEGEND:

CONTINUATION A B C 1 2 3 4 A B C
0.850 3.500 3.500 0.850
1.000

0.850
SCHEDULE OF DOORS
TOP OF ROOF BEAM
( ROOF BEAM LEVEL )
TOP OF ROOF BEAM
( ROOF BEAM LEVEL ) 4
MARK HEIGHT WIDTH DESCRIPTION NO. OF SET/S LOCATION
2.999

3.000
D3 D3
KIT
BRGY CAP'S OFFICE CONFERENCE DINING BRGY CAPT
INFO ALUM FRAMED SWING GLASS
D3 2.100 0.700 2.00 OFFICE/ ENTRY
BALCONY DOOR
TOP OF BEAM
( 2ND FLOOR LEVEL )
TOP OF BEAM
( 2ND FLOOR LEVEL ) 3 2ND FLOOR

D4 2.100 0.600 PVC DOOR 2.00 CR

SLOPE
3.001

9.000
3.000
1.300
0.500

GB4
SCHEDULE OF WINDOWS
11.000

DAY CARE
TOP OF BEAM TOP OF BEAM NO. OF
( 1ST FLOOR LEVEL ) ( 1ST FLOOR LEVEL ) 2 MARK HEIGHT WIDTH DESCRIPTION
SET/S
LOCATION

W1 1.500 1.500 ALUM FRAMED GLASS SLIDING WINDOW 1 BASEMENT


3.000

3.000
EMBANKMENT
4.000

4.400

BASEMENT
5.400

TOP OF BEAM TOP OF BEAM


1
2.000 ( VARIES )

0.850
( BASEMENT ) ( BASEMENT )
1.000

EMBANKMENT
50MM X 250MM X 1.20MM C - FACIA BD
1.000

LOWER ( NGL ) LOWER ( NGL ) 0.50MM THK PRE - PAINTED LONG SPAN ROOFING

TIE BEAM

CROSS SECTION LONGITUDINAL SECTION LONGITUDINAL SECTION


SCALE 1:100 MTS. SCALE 1:100 MTS.
SCALE 1:100 MTS.

PROJECT & LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES FRONT ELEVATION, REAR ELEVATION


RIGHT-SIDE ELEVATION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LEFT SIDE ELEVATION
PAULYNNE A. GATCHALIAN
LOCAL INFRASTRUCTURE PROGRAM,
REGIONAL OFFICE NO. 1 SCHEDULE OF FINISH DRAFTSMAN II - COS
CONSTRUCTION OF MULTI-PURPOSE BUILDING ROOF PLAN, LONGITUDINAL SECTION
Planning and Design Division PREPARED:
Bridges & Other Public Works Design Section
(BARANGAY HALL) CROSS SECTION, SCHEDULE OF DOORS & WINDOWS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
11
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
BRGY. STA. RITA EAST, ARINGAY, LA UNION
JULIUS M. GACETA
ARCHITECT II DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. 1
Planning and Design Division
Bridges & Other Public Works Design Section
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION

C.Y. 2021 PROJECT


LOCAL INFRASTRUCTURE PROGRAM,
CONSTRUCTION OF MULTI-PURPOSE BUILDING
(BARANGAY HALL)
LOCATION: BRGY. STA. RITA EAST, ARINGAY, LA UNION

SUBMITTED: RECOMMENDED: APPROVED:

ALBERTO B. ESQUEJO, JR EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III


CHIEF, PLANNING AND DESIGN DIVISION OIC-ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: DATE: DATE:


RISER DIAGRAM
POWER PANEL BOARD FLOURESCENT LAMP, 18W 25MM PVC, 230V, 60HZ, SERVICE ENTANCE
ENCLOSURE : NEMA-1 MAIN : 30AT/50AF 2P
M Ga.# 16
PANEL : PB1
230V C.B.
PB PULL BOX LED BULB, 12 WATTS 2-# 10 AWG THHN WIRE

PANEL BOARD SURFACE


MOUNTED
SINGLE POLE SINGLE THROW SWITCH 2-# 12 AWG THHN WIRE
S PINLIGHT, 24 WATTS
30AT/50AF, 2P, 230AC PANEL BOARD LOCATION : BESIDE
AT THETHE STAGE
BASEMENT KAIC : 10
L.O. 15A 15A L.O.
DUPLEX, SINGLE POLE SINGLE THROW SWITCH BRANCH
S2 CONDUIT UNDERGROUND LOAD IN AMPERES WIRE CONDUIT SIZE
1 2 CKT LOAD CIRCUIT
NO. DESCRIPTION LINE
VOLTS POLE FRAME TRIP VA L-N GRD.(TW) (PVC)
L.O. L.O. (THWN)
15A 15A
S3 TRIPLEX, SINGLE POLE SINGLE TRHOW SWITCH DUPLEX WEATHER PROOF CONVINIENCE OUTLET
WP
3 4 MAIN 230 2 50 30 2-5.5mm2 1-2.0mm2 25mm DIA.

KWHM KILOWATT HOUR METER DUPLEX CONVINIENCE OUTLET C.O. 20A 20A C.O. 1 LIGHTING OUTLET 230 2 50 15 108 0.47 2-3.5mm2 1-2.0mm2
1-2.0mm2 20mm DIA.
5 6 0.76
2 LIGHTING OUTLET 230 2 50 15 96 0.417 2-3.5mm2 1-2.0mm2
1-2.0mm2 20mm
20mm DIA.
DIA.

C CIRCUIT HOMERUN C.O. 20A SPARE 3 LIGHTING OUTLET 230 2 50 15 84 0.365 2-3.5mm2 1-2.0mm2
1-2.0mm2 20mm
20mm DIA.
DIA.
LEGEND & SYMBOLS 7 8 4 LIGHTING OUTLET 230 2 50 15 108 0.47 2-3.5mm2 1-2.0mm2
1-2.0mm2 20mm
20mm DIA.
DIA.
CIRCUIT BREAKER CONVENIENCE
5 OUTLET 230 2 50 20 900 3.913 2-3.5mm2 1-2.0mm2
1-2.0mm2 20mm
20mm DIA.
DIA.
CONVENIENCE
6 OUTLET 230 2 50 20 900 3.913 2-3.5mm2 1-2.0mm2 20mm DIA.
# 14 AWG THHN CONVENIENCE
GROUNDING WIRE 7 OUTLET 230 2 50 20 1080 4.7 2-3.5mm2 1-2.0mm2 20mm DIA.

A B C A B C A B C 8 SPARE
TOTAL 3276 14.243
7.000 7.000 7.000

3.500 3.500 3.500 3.500 3.500 3.500 B. SIZE OF CIRCUIT


PROTECTION
A. SIZE OF FEEDER
CONDUCTOR MAIN: 30AT, 50AF, 2P, 230V, 60HZ
It =14.243 A USE: 2-5.5mm2 THHN COPPER WIRE + 1-2.0mm2
=14.243 A @ 85% DF = 12.11A
4 4 4
THHN NEUTRAL WIRE
=12.11 A*1.25SF = 15.13 A IN 25MM DIA. PCV CONDUIT
3.000

3.000

3.000
ALL ELECTRICAL WORKS HEREIN INCLUDE SHALL BE EXECUTED ACCORDING
3 3 3 E1 TO THE REQUIREMENTS OF THE PHILPPIINE ELECTRICAL CODE & REQUIRE
MENTS OF THE LOCAL POWER COMPANY.
C7
9.000
3.000

9.000
3.000

9.000
3.000
C5 C6
CCORDINATE WITH OTHER TRADE ESPECIALTY WORKS OF CONTRACTORS
E2 FOR UP -TO-DATE REQUIREMENTS ON RELATED ELECTRICAL WORKS
2 2 2 INCLUDED HEREIN PRIOR TO CONSTRUCTION
1.000

1.000

1.000
ALL FEEDERS AND BRANCH CIRCUITS SHALL BE INSTALLED AS INDICATED
3.000

3.000

3.000
ON THE PLANS & & INDIVIDUAL BRANCH CIRCUIT HOMERUNS SHALLL NOT BE
E3
STAIR
1.000

1.000

1.000
UP

COMBINED UNLESS SO INDICATED


1 1 1
BASEMENT LIGHTING LAYOUT GROUND FLOOR LIGHTING LAYOUT SECOND FLOOR LIGHTING LAOUT ALL CONDUIT & METAL FRAMES OF EQUIPMENT SHALL BE GROUND BY
CONNECTINGTO EQUIPMENT GROUNDING CONDUCTOR OR TO WATER
SCALE 1:100 MTS.
SCALE 1:100 MTS. SCALE 1:100 MTS. E4
SERVICE LINE

A B C A B C A B C
7.000 7.000 7.000 PROVIDE SEPARATE GROUND WIRE SIZE AS PER PHILIPPINE ELECTRICAL
3.500 3.500 3.500 3.500 3.500 3.500 E1 CODE FOR ALL BRANCH CIRCUITS & FEEDERS
0.050M DROP 0.050M DROP

4 4 4 DEVICE COVER PLATES SHALL BE PLASTIC TYPE AND COVERED WITH A


k l
E5 COLOR SUBJECT TO THE DESIGN AND DEVICE
3.000

3.000

3.000

Sk Sl
c c c e e e j

i Sij STANDARD SIZE AND ACCESSORIES , SPLICING DEVICES, TERMINATION AND


3 3 3 E7 OTHER APPURTENANCES FOR THE ENTIRE ELECTRICAL WORK INSTALLATION
SHALL BE USED
9.000
3.000

9.000
3.000

9.000
3.000

b b b d d d h h
h
ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION
Sde Sh E8 OF A DULY REGISTERED PROFESSIONAL ELECTRICAL ENGINEER
2 2 S
S 2 S
Sfg
1.000

1.000
1.000

f
3.000

3.000

3.000

S Sabc a
2.000

a
C1 C2 GENERAL NOTES / SPECIFICATIONS
STAIR
1.000

1.000
UP

1 1 1 g g

NOTE: BULB i,j,k,l NEED TO BE ADDED, THE


EXISTING ELECTRICAL
BASEMENT POWER LAYOUT FIRST FLOOR POWER LAYOUT SECOND FLOOR POWER LAOUT REST ARE EXISTING
SCALE 1:100 MTS. SCALE 1:100 MTS. SCALE 1:100 MTS.

PROJECT & LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES GF LIGHTING LAYOUT, 2F LIGHTING LAYOUT


GF POWER LAYOUT, 2F POWER LAYOUT
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JOHN PAOLO P. SIMANGAN
LOCAL INFRASTRUCTURE PROGRAM, RISER DIAGRAM, SCHEDULE OF LOAD
REGIONAL OFFICE NO. 1 LOAD COMPUTATION ENGINEER II - COS
CONSTRUCTION OF MULTI-PURPOSE BUILDING ELECTRICAL SYMBOLS, SPECIFICATIONS
Planning and Design Division PREPARED:
Bridges & Other Public Works Design Section
(BARANGAY HALL)
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III S
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
11
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
BRGY. STA. RITA EAST, ARINGAY, LA UNION
DOMINIC G. DELA CRUZ
ENGINEER II DATE: DATE: DATE: DATE:
C
1. ALL PLUMBING INSTALLATION SHALL
CONFORM WITH THE RULES AND
REGULATIONS OF THE LATEST EDITION OF
B 7.0
00
3.5
00

C
OR 1 12"Ø PVCVTR
THE PHILIPPINE PLUMBING 1ST
FLO
CODE.
SHO SHOWER HEAD VTR VENT THRU ROOF
A 3.5
00

B MØ
PVC
FRO
M
KS
F FAUCET GV GATE VALVE 100M FD
WC WB 4.500
OR
2. ALL WORKS AND SUPERVISION SHALL BE
SV SEPTIC VAULT CV CHECK VALVE
A
C
FD W WB
OM
1ST
FLO C 1.500 1.500 1.500
SUPERVISED BY DULY LICENSED PV C FR
Ø
SANITARY ENGINEER OR MASTER 0MM

PLUMBER.
MH MANHOLE WM WATER METER
4 3.0
00 10
B 10 MM Ø RSB @ 0.200M O.C.
ON 0.100 M THK CONC SLAB
CO CLEAN OUT WATER CLOSET 0.50M X 0.50M MAN HOLE
OOR
3 00
M 1S
T FL W/ 3- 10MM. RSB

4A
3.0 00
9.0
3. ALL MATERIALS TO BE USED SHALL BE OF O
WC WATER CLOSET C FR
M Ø PV
APPROVED TYPE AND HIGH 100M
00

2
1.0
00
FD FLOOR DRAIN LAVATORY OC
3.0
1.0
00
QUALITY.
3 16MMØ
HANDLE BAR
4. ALL P[IPE AND FITTING TO USED SHALL BE KS KITCHEN SINK CB CATCH BASIN
1
4 2

0.500

0.500
1.500
BRAND NEW.
UPTAIR
S

5. EFFLUENT FROMM SEPTIC VAULT, RAIN


PLUMBING SYMBOLS 3 1
WATER FROM ROOF AND GROUND
SURFACE SHALL BE CONNECTED ON THE 2 0.500 0.500
STORM DRAINAGE GOING TO THE PLAN
1

PLUMBING NOTES PLUMBING SYMBOLS PLUMBING ISOMETRY


SCALE NTS

4.500
1.500 1.500 1.500
4.50 X 1.50 SEPTIC VAULT
100MM IDA.
10 MM Ø RSB @ 0.200M O.C. OUTLET PVC

A B C A B C A B C 0.500
ON 0.100 M THK CONC SLAB
0.500 0.500
PIPE

7.000 7.000 7.000 0.50M X 0.50M MAN HOLE 16MMØ


3.500 3.500 3.500 3.500 3.500 3.500 W/ 3- 10MM. RSB HANDLE BAR

0.10
1
4 '' Ø PPR FROM WATER SOURCE @ BASEMENT
1 NAT. GRADE LINE NAT. GRADE LINE
OC

100MM Ø PVC FROM BASEMENT TO 2ND FLOOR 100MM Ø PVC FROM BASEMENT '' Ø PPR FROM WATER SOURCE @ BASEMENT

0.300
0.200
2

4 4 4 10MM DIA. HOR BAR


100MM IDA.
IN LET PVC &10MM DIA. VERT. BAR
PIPE SPD @ 0.600M.OC
3.000

3.000

3.000

2.000
6 " THK. CHB W/ CEM.
PLASTER FIN.
DIGESTIVE DIGESTIVE LEACHING
2 - 10MM DIA. CONT. BARS
CHAMBER CHAMBER CHAMBER SPD. AS SHOWN W/ 10 MM

3 3 3 10MM DIA. TEMP. BARS


SPD AS SHOWN
BOTHWAYS ON 0.100M.
DIA. TIES SPD. @ 0.300M.
OC.

THK. CONC. SLAB

FINE GRAVEL BEDDING


9.000
3.000

9.000
3.000

9.000
3.000

2 2 2 0.500 0.500 0.500 0.500

SECTION
1.000

1.000

1.000
3.000

3.000

3.000
STAIR
1.000

1.000

1.000
UP

1 1 1

BASEMENT PLUMBING 2F PLUMBING LAYOUT 2F WATER LINE LAYOUT SEPTIC TANK DETAIL
SCALE 1:100 MTS. SCALE 1:100 MTS. SCALE 1:100 MTS. SCALE NTS

PROJECT & LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES GF PLUMBING LAYOUT, 2F PLUMBING LAYOUT


PLUMBING ISOMETRY
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PAULYNNE A. GATCHALIAN
LOCAL INFRASTRUCTURE PROGRAM, SEPTIC TANK DETAIL
REGIONAL OFFICE NO. 1 PLUMBING NOTES, PLUMBING SYMBOLS DRAFTSMAN II - COS
CONSTRUCTION OF MULTI-PURPOSE BUILDING
Planning and Design Division PREPARED:
Bridges & Other Public Works Design Section
(BARANGAY HALL)
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III P
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
11
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
BRGY. STA. RITA EAST, ARINGAY, LA UNION
JULIUS M. GACETA
ARCHITECT II DATE: DATE: DATE: DATE:
A B C A B C A B C A B C
7.000 7.000 7.000 7.000

3.500 3.500 3.500 3.500 3.500 3.500 3.500 3.500

C1F1 C1F2 C1F1 300MM X 300MM CONC COLUMN 5" THK CHB WALL W/ CEMENT
PLASTER & PAINT FINISH
4 GB1 GB1
4 BB BB
4 C1 1B2 C1 1B2 C1
4 C2 2B2 C2 2B2 C2 CONC CANOPY
C1 C1 C1 5" CHB WALL BELOW
3.000

3.000

3.000

3.000
1B1

1B1

1B1
GB1 S1 S1 S1 S1 2B1 S1 2B1 S1 2B1

BB

BB

BB
GB2 GB2
C1F2 C1F2 C1F2
C1 C1 C1 1B3 1B3 C2 C2 C2
3 GB1 GB1
3 BB BB 3 C1 C1 C1 3 2B2 2B2

BB

BB

BB
9.000
3.000

9.000
3.000

9.000
3.000

1B1

1B1

1B1

9.000
3.000
GB1 GB2 GB2 S1 S1 S1 S1 2B1 S1 2B1 S1 2B1
C1F2 C1F3 C1F2
C1 C1 C1 1B3 1B3 C2 C2 C2 CB2
2 GB1 GB1
2 S1 BB 2 C1 S1 C1 C1 2 S1 2B2 2B2
BB
1.000

1.000

2.0501.000

1.000

EB
1B1

1B1

1B1
BB STAIR S1 S1 S1 S1 2B1 S12B1 S1

BB

BB
GB2 GB2
3.000

3.000

3.000

3.000
GB1 STAIR 2B1
WELL STAIR WELL
C1F2 C1F2 C1F2 ABOVE WELL
STAIR
1.000

1.000

1.000

1.000
UP

GB3 GB3 C1 BB C1 BB C1 C1 1B1 C1 1B1 C1 C2 2B2 C2 2B2 C2 CB2


1 1 1 1

CB1
CB1

EB
SHEAR WALL 1.200
EB

S2
BB2
GB4
C3F3 C3F3

FOUNDATION PLAN BASEMENT FLOOR FRAMING PLAN FIRST FLOOR BEAMPLAN SECOND FLOOR BEAM PLAN
SCALE 1:100 MTS. SCALE 1:100 MTS. SCALE 1:100 MTS.
SCALE 1:100 MTS.

PROJECT & LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES FOUNDATION PLAN, BASEMENT FLOOR FRAMING PLAN


FIRST FLOOR BEAM PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SECOND FLOOR BEAM PLAN
PAULYNNE A. GATCHALIAN
LOCAL INFRASTRUCTURE PROGRAM,
REGIONAL OFFICE NO. 1 DRAFTSMAN II - COS
CONSTRUCTION OF MULTI-PURPOSE BUILDING
Planning and Design Division PREPARED:
Bridges & Other Public Works Design Section
(BARANGAY HALL)
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III S
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
11
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
BRGY. STA. RITA EAST, ARINGAY, LA UNION
BILLY JOE M. MOSTER
ENGINEER III DATE: DATE: DATE: DATE:
PROJECT & LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES GENERAL CONSTRUCTION NOTES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PAULYNNE A. GATCHALIAN
LOCAL INFRASTRUCTURE PROGRAM,
REGIONAL OFFICE NO. 1 DRAFTSMAN II - COS
CONSTRUCTION OF MULTI-PURPOSE BUILDING
Planning and Design Division PREPARED:
Bridges & Other Public Works Design Section
(BARANGAY HALL)
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III S
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
11
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
BRGY. STA. RITA EAST, ARINGAY, LA UNION
BILLY JOE M. MOSTER
ENGINEER III DATE: DATE: DATE: DATE:
AS BUILT

PROJECT & LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES GENERAL CONSTRUCTION NOTES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PAULYNNE A. GATCHALIAN
LOCAL INFRASTRUCTURE PROGRAM,
REGIONAL OFFICE NO. 1 DRAFTSMAN II - COS
CONSTRUCTION OF MULTI-PURPOSE BUILDING
Planning and Design Division PREPARED:
Bridges & Other Public Works Design Section
(BARANGAY HALL)
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III S
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
11
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
BRGY. STA. RITA EAST, ARINGAY, LA UNION
BILLY JOE M. MOSTER
ENGINEER III DATE: DATE: DATE: DATE:
LEGEND:
2ND FLOOR BEAM
SCHEDULE OF COLUMN
CONTINUATION MARK X (m) Y (m) DESCRIPTION REMARK
8 - 16MMØ CORNER COLUMN BARS W/ 10MM Ø TIES SPD
1.100 C1 0.300 0.300 AS FOLLOWS: FIRST 5 @ 0.050M, 5 @ 0.075M, 5 @ SQUARE COLUMN 0.200
6 - 16MM Ø VERT BARS
0.100M, & REST @ 0.150M.O.C TO M.H.
AS SHOWN 2F SLAB 0.950 0.150
6 - 16MMØ CORNER COLUMN BARS W/ 10MM Ø TIES SPD
2ND FLOOR LEVEL C2 0.300 0.300 AS FOLLOWS: FIRST 5 @ 0.050M, 5 @ 0.075M, 5 @ SQUARE COLUMN 2 - 16MM CONT. RSB
0.100M, & REST @ 0.150M.O.C TO M.H.

0.300
2F BEAM 4 - 16MMØ CORNER COLUMN BARS W/ 10MM Ø TIES SPD
2F LEVEL
2B1 BEAM C3 0.250 0.250 AS FOLLOWS: FIRST 1 @ 0.050M, 5 @ 0.100M, 5 @ SQUARE COLUMN
2 - 16MM CONT. RSB
RB 0.150M, & REST @ 0.200M
5
0.1
STIRRUPS :

10MM RSB CHAIR BAR 10MM Ø RSB TOP AND SCHEDULE OF FOOTING USED 10MM Ø STIRRUPS SPD AS FOLLOWS; FIRST 5
@ 0.050M, NEXT 5 @ 0.100 REST @ 0.150M TO CL
@ 0.25 M.O.C. BOTTOM BARS MARK X Y DEPTH THK DESCRIPTION REMARK
SPACED AT 0.250M X = 7 - 16MMØ RSB
12MM RSB NOSING BAR F1 1.200 1.200 1.500 0.300 SQUARE FTG
BOTH WAYS Y = 7 - 16MMØ RSB
2ND FLOOR BEAM ON STAGGERED POSITION X = 8 - 16MMØ RSB
EB DETAIL
16MM Ø STRAIGHT BARS F2 1.300 1.300 1.500 0.300 SQUARE FTG
LANDING Y = 8 - 16MMØ RSB

3.000
@0.25 M.O.C.
X = 8 - 16MMØ RSB
F2 1.400 1.400 1.500 0.300 SQUARE FTG
SEE LB DET. Y = 8 - 16MMØ RSB
X = 5 - 16MMØ RSB
3.000

8 - 16MM Ø VERT. BARS BARS F3 1.000 1.000 1.500 0.250 SQUARE FTG
12MM Ø HOR.BAR@ Y = 5 - 16MMØ RSB
AS SHOWN
0.15 M.O.C.

0.250 0.250
0.250 0.200 0.200
10MM Ø RSB SPACED
SPACE @ 0.400 M.O.C. 3 - 16MMØ CONT. RSB 2 - 16MMØ CONT. RSB
10MMØ LAT TIES SPD ASFOLLOWS; BOTH WAYS ON 0.075M 2 - 12MM CONT. RSB 3 - 12MM CONT. RSB 3 - 12MM CONT. RSB

0.350

0.350
FIRST 5 @ 0.05M, NEXT5 @ 0.10M, THK SLAB

0.350

0.350

0.350
REST @ 0.150 M. TO M.H. F.F.O.SG 0.400
2 - 16MMØ CONT. RSB 3 - 16MMØ CONT. RSB
GROUND FLOOR LEVEL
ATSUPPORT AT MID-SPAN
2 - 16MM CONT. RSB 2 - 12MM CONT. RSB 3 - 12MM CONT. RSB
0.250 ( CB1 DETAIL ) 0.250
GF LEVEL STAIR TIE BEAM STIRRUPS : STIRRUPS : STIRRUPS :
USED 10MM Ø STIRRUPS SPD AS FOLLOWS; FIRST 5 USED 10MM Ø STIRRUPS SPD AS FOLLOWS; FIRST 5 USED 10MM Ø STIRRUPS SPD AS FOLLOWS; FIRST 5 4 - 16MMØ CONT. RSB 2 - 16MMØ CONT. RSB

0.50
@ 0.050M, NEXT 5 @ 0.100 REST @ 0.150M TO CL @ 0.050M, NEXT 5 @ 0.100 REST @ 0.150M TO CL @ 0.050M, NEXT 5 @ 0.100 REST @ 0.150M TO CL
BACKFILL

0.350

0.350
RB1 DETAIL RB2 DETAIL RB3 DETAIL 2 - 16MMØ CONT. RSB 2 - 16MMØ CONT. RSB

ATSUPPORT AT MID-SPAN
E A R T H ( CB2 DETAIL )
ROOF BEAM STIRRUPS :
USED 10MM Ø STIRRUPS SPD AS FOLLOWS; FIRST 5 @ 0.050M, NEXT 5 @ 0.100 REST @ 0.150M TO CL
1ST FLOOR BEAM
TIE BEAM
0.250 0.250 0.250 0.250 0.200
3.000

3 - 16MMØ CONT. RSB 2 - 16MMØ CONT. RSB 4 - 16MMØ CONT. RSB 2 - 16MMØ CONT. RSB 4 - 16MM CONT. RSB
8 - 16MM Ø VERT
BARS AS SHOWN

0.300
0.350

0.350

0.350

0.350
2 - 16MMØ CONT. RSB 3 - 16MMØ CONT. RSB 2 - 16MMØ CONT. RSB 2 - 16MMØ CONT. RSB 4 - 16MM CONT. RSB

10MMØ LAT TIES SPD ASFOLLOWS; CONCRETE STAIR DETAIL ATSUPPORT


STIRRUPS :
AT MID-SPAN
USED 10MM Ø STIRRUPS SPD AS FOLLOWS;
ATSUPPORT
STIRRUPS :
AT MID-SPAN
USED 10MM Ø STIRRUPS SPD AS FOLLOWS;
STIRRUPS :
USED 10MM Ø STIRRUPS SPD AS FOLLOWS;
FIRST 5 @ 0.05M, NEXT5 @ 0.10M, SCALE 1:100 MTS. FIRST 5 @ 0.050M, FIRST 5 @ 0.050M,
FIRST 1 @ 0.050M, NEXT 5 @ 100
NEXT 5 @ 0.150 REST @ 0.200M
REST @ 0.150 M. TO M.H. F.F.O.SG NEXT 5 @ 0.100 REST @ 0.150M TO CL NEXT 5 @ 0.100 REST @ 0.150M TO CL

FIN FLR LN 2B1 DETAIL 2B2 DETAIL BB2 DETAIL

BASEMENT LEVEL & 1ST FLOOR LEVEL SECOND FLOOR BEAM BASEMENT BEAM
LENGTH
( VARIES )

L/4 L/2 L/4 0.250 0.250 0.250 0.250 0.250


2.000M

10mm Ø RSB @ 0.220MOC


BOTHWAYS, BOTTOM BARS
BASEMENT BEAM 12mmØ RSB
4 - 16MMØ 4 - 16MMØ 2 - 16MMØ 4 - 16MMØ CONT. RSB 2 - 16MMØ CONT. RSB
10mm Ø RSB @ 250mm TEMP. CONT. RSB CONT. RSB CONT. RSB 2 - 12MM CUT BARS
SPD @ 0.220

0.350

0.350

0.350

0.350

0.350
BARS TOP & BOTTOM BARS
MOC BENT
@ L/4 FROM
L/4
1.500

3 - 16MMØ 2 - 16MM 2 - 16MM 2 - 16MM CONT. RSB 2 - 16MM CONT. RSB


GRADE BEAM FACE OF
CONT. RSB CONT. RSB CONT. RSB
SUPPORT,
AT SUPPORT & MID - SPAN ATSUPPORT AT MID-SPAN ATSUPPORT AT MID-SPAN
0.300 TOP BARS
THK

STIRRUPS :
STIRRUPS : STIRRUPS :
0.075

USED 10MM Ø STIRRUPS SPD AS FOLLOWS;


USED 10MM Ø STIRRUPS SPD AS FOLLOWS; USED 10MM Ø STIRRUPS SPD AS FOLLOWS;
FIRST 5 @ 0.050M,
FIRST 5 @ 0.050M, FIRST 5 @ 0.050M,
NEXT 5 @ 0.100 REST @ 0.150M TO CL
12mmØ CUT NEXT 5 @ 0.100 REST @ 0.150M TO CL NEXT 5 @ 0.100 REST @ 0.150M TO CL
0.075 BARS @
EVERY 2 1B1 DETAIL 1B2 DETAIL 1B3 DETAIL
LENGTH

0.10M THK GRAVEL


L/2

BENT UP
Y - BAR BEDDING
X - BAR BARS @ L/4
X F.F.O.S.,
BOTHWAYS
FIRST FLOOR BEAM
0.075 0.200 0.200
0.075

0.200 0.250 0.250 0.200


00 10mm Ø RSB @ 150mm TOP &
0.3
L/4

BOTTOM BARS 4 - 16MM CONT. RSB 4 - 16MM CONT. RSB


3 - 16MM 2 - 16MM 3 - 16MM 2 - 16MM

0.350

0.350
CONT. RSB CONT. RSB CONT. RSB CONT. RSB

0.350

0.350

0.350

0.300
SLAB 2 (S2) 4- 16MM CONT. RSB 4- 16MM CONT. RSB
Y

Y - BAR 2- 16MM 2- 16MM 3- 16MM 2 - 16MM


CONT. RSB CONT. RSB CONT. RSB CONT. RSB
ATSUPPORT AT MID-SPAN AT SUPPORT & MID - SPAN AT SUPPORT & MID - SPAN AT SUPPORT & MID - SPAN AT SUPPORT & MID - SPAN
SLAB 1 (S1) STIRRUPS :
USED 10MM Ø STIRRUPS SPD AS FOLLOWS;
FIRST 5 @ 0.050M,
STIRRUPS :
USED 10MM Ø STIRRUPS SPD AS FOLLOWS;
STIRRUPS :
USED 10MM Ø STIRRUPS SPD AS FOLLOWS;
FIRST 5 @ 0.050M,
STIRRUPS :
USED 10MM Ø STIRRUPS SPD AS FOLLOWS;
FIRST 5 @ 0.050M,
STIRRUPS :
USED 10MM Ø STIRRUPS SPD AS FOLLOWS;
FIRST 1 @ 0.050M, NEXT 5 @ 100
FIRST 5 @ 0.050M,
NEXT 5 @ 0.100 REST @ 0.150M TO CL NEXT 5 @ 0.100 REST @ 0.150M TO CL NEXT 5 @ 0.100 REST @ 0.150M TO CL NEXT 5 @ 0.100 REST @ 0.150M TO CL NEXT 5 @ 0.150 REST @ 0.200M

GB1 DETAIL GB2 DETAIL GB3 DETAIL GB4 DETAIL


X - BAR
BB DETAIL
2F SLAB DETAIL BASEMENT BEAM LOWER GROUND BEAM
COLUMN - FOOTING DETAIL SCALE NTS.

SCALE 1:30 MTS.

PROJECT & LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:
COLUMN FOOTING DETAIL, WALL FOOTING DETAIL
REPUBLIC OF THE PHILIPPINES
SLAB 1 & 2 DETAIL
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PAULYNNE A. GATCHALIAN
LOCAL INFRASTRUCTURE PROGRAM, CONCRETE STAIR DETAIL
REGIONAL OFFICE NO. 1 SCHEDULE OF COLUMN AND FOOTING DRAFTSMAN II - COS
CONSTRUCTION OF MULTI-PURPOSE BUILDING
BEAM SECTION DETAILS
Planning and Design Division PREPARED:
Bridges & Other Public Works Design Section
(BARANGAY HALL)
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III S
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
11
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
BRGY. STA. RITA EAST, ARINGAY, LA UNION
BILLY JOE M. MOSTER
ENGINEER III DATE: DATE: DATE: DATE:
10MM Ø RSB SPACED NOTE: PROPOSED CEILING FOR THE BASEMENT, 1ST
SECOND FLOOR LEVEL FLOOR, 2ND FLOOR AND SPANDREL
@ 0.400 M.O.C.
0.400 BOTH WAYS ON 0.075M 10MM Ø RSB @ 0.25 M.O.C. (LONG SPAN )
LEGEND:
THK SLAB 0.100M THK CONC. SLAB
CONTINUATION

12MMØ RSB @ 0.25 M.O.C.

BACKFILL

0.100
TOP LINE OF WINDOW

0.10
0.400

10MM Ø RSB SPACED


@ 0.15 m.O.C.
SLAB-1 (S1) SECTION DETAIL CANOPY DETAIL 0.15 BOTH WAYS ON 0.125M DETAIL
SCALE 1:15 MTS.
SCALE NTS. THK SLAB

BOTTOM CHORD FULL WELDED MARK DESCRIPTION BAR SIZE


TO BASE PLATE
2 - 50MM X 50MM X 6.0MM THK ANGULAR
BOTT. CHORD TC TOP CHORD 2 - 50MM X 50MM X 6.0MM THK ANGULAR BAR

200 X 200 X 10 MM THK BASE PLATE BC BOTTOM CHORD 2 - 50MM X 50MM X 6.0MMTHK ANGULAR BAR
FULL FILLET WELD TO BOTT. CHORD

ROOF BEAM KP KING POST 2 - 50MM X 50MM X 6.0MM THK ANGULAR BAR CARRY CHANNEL AT 1200MM O.C.

FIBER CEMENT CEILING BOARD


4 -16MM X 300 MM ANCHOR BOLTS WM WEB MEMBERS 1 - 50MM X 50MM X 6.0MM THK ANGULAR BAR
CEILING FURRING AT 400MM O.C

INTERIOR CEILING PERSPECTIVE DETAIL


ROOF BEAM CONN. - BASE PLATE DETAIL SCHEDULE OF ANGULAR BARS SLAB-2 (S12) SECTION DETAIL
SCALE 1: 10 MTS. SCALE NTS.

300MM X 300MM X 10MM


THK GUSSET PLATE

A B C 50MM X 250MM X 1.20MM THK C - FACIA BD. 2" X 3" C - PURLINS


7.000 @ 0.600 M.O.C.
0.850 1.750 1.750 1.750 1.750 0.850
PRE - PAINTED FLASHING 50MM X 50MMX 6MM THK ANGULAR CLEATS
2 - 50MM X 500MM X 6MM THK ANGULAR BAR, TOP CHORD
1 0 " X 2 " F A C I A B D 5" CHB WALL W/ CEMENT PLASTER
1 - 50MM X 50MM X 6MM THK WEB MEMBER
& PAINT FINISH
0.850

RB3 RB3 PRE - PAINTED RIB TYPE LONG SPAN ROOFING


4 50MM X 75MM X 1.00MM C- PURLIN
PURLIN - TOP CHORD CONNECTION DET.
SCALE NTS.
AT 600MM O.C.
RB2
S

S
B D

B D
RB1

RB1
3.000

2 - 50MM X 50MM X 6MM THK ANGULAR BAR, TOP CHORD


S

S
F A C I A

F A C I A
U

2 - 50MM X 50MM X 6MM THK ANGULAR BAR,WEB MEMBERS


3
R

2 - 50MM X 50MM X 6MM THK ANGULAR BAR, BOTT CHORD


T

T
2 "

2 "

1.200
L

L
RB1

RB2

RB1
9.000
3.000

GA #24 PRE - PAINTED SPANISH


X

X
L

GUTTER
U

U
1 0 "

1 0 "
F

0.250
2
RB1

RB2

RB1
3.000

RB3 RB3
1.000 1.088 1.088 1.088 1.088 1.088 1.088 1.088 1.088 1.000
1
0.850

8.700
1 0 " X 2 " F A C I A B D

2" X 3" C- PURLIN @ 0.60 M.O.C.


W/ X 2" X 2" 6.0MM THK.
ANGULAR CLEATS

ROOF FRAMING PLAN


SCALE 1:100 MTS.
TRUSS DETAIL
SCALE NTS

PROJECT & LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

ROOF FRAMING PLAN, TRUSSES DETAIL


REPUBLIC OF THE PHILIPPINES
SCHEDULE OF TRUSSES, SLAB 1&2 SECTION DETAIL
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PAULYNNE A. GATCHALIAN
LOCAL INFRASTRUCTURE PROGRAM, INTERIOR CEILING PERSPECTIVE DETAIL
REGIONAL OFFICE NO. 1 ROOF BEAM- BASE PLATE CONN. DETAIL
DRAFTSMAN II - COS
CONSTRUCTION OF MULTI-PURPOSE BUILDING
PURLIN - TOP CHORD CONN. DETAIL, CANOPY DETAIL
Planning and Design Division PREPARED:
Bridges & Other Public Works Design Section
(BARANGAY HALL)
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III S
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
11
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
BRGY. STA. RITA EAST, ARINGAY, LA UNION
BILLY JOE M. MOSTER
ENGINEER III DATE: DATE: DATE: DATE:
300 MM Ø THK FILTER STONES SPACED
20mm ON CENTER STAGGERED

BURLAP CLOTH TIED AT THE


INNER END OF WEEPHOLE
300
100 mm Ø PVC WEEPHOLE SPACED AT 200mm
ON CENTER STAGGERED

300

S =1 : 24
DESIGN CRITERIA OF STONE MASONRY
MASONRY = .........................................................23.55 kN/ Cu.m.
SOIL = ...................................................................18.00 kN/ Cu.m.
MORTAR Ø = .....................................35.70° ANGLE OF INTERVAL REPOSE
BOULDERS Qa = ..............................196 kPa (TO BE VERIFIED DURING CONSTRUCTION)
=........................... 0.50 ASSUMED COEFFICIENT OF FRICTION
NATURAL GRADE LINE
Qs = ..........................................................................22.52 kPa
FSo =...........................................................................2.00
DETAIL "B" FS =..........................................................................1.5
SCALE 1: 20 MTS NOTE:
2
ALLOWABLE SOIL BEARING CAPACITY = 196 Kn/m

NOTE: ( STONE MASONRY)


PRIOR TO CONSTRUCTION, CONDUCT SOIL INVESTIGATION
00
IN
59.00 61.0
ACCORDANCE WITH THE STANDARD TESTING REQUIREMENT ALONG 000

THE ALIGNMENT OF ROAD TO DETERMINE THE CLASSIFICATION OF


L SOIL FOUNDATION. 59.00
00

P A R A P E T W A L L NOTES:
1. MATERIAL AND CONTRUCTION REQUIREMENTS SHALL CONFORM TO DPWH STANDARD
SPECIFICATIONS FOR HIGHWAYS AND BRIDGES 2013
2. USE OF MONOFILAMENT POLYPROPYLENE SYNTHETIC FIBERS (D.O. 95, SERIES 2005 ) AS

Ht = VARIABLE
ADDITIVE TO CONCRETE MIX.

Ht = VARIABLE
3. CONCRETE CURB AND GUTTER SHALL BE CONSIDERED IN THE DESIGN OF PAVED ROADS

100mm100mm
IF THE FUNCTION IS TO THE FACILITATE THE CHANNELING OF SURFACE WATER RUN-OFF
THUS PREVENTING THE EROSION OF SHOULDERS AND SLOPE.
S T O N E M A S O N R Y 4. MINIMUM CURB INLET INTERVAL ("D")10.0METERS IN FLOODED AREAS.
S =1 : 24

ON FILL 5. MINIMUM CURB INLET INTERVAL ("D")20.0METERS IN OTHER AREAS


H

H
ITEM 104 - EMBANKMENT
MIN.

MIN.
0.60

0.60
100MM Ø PVC WEEPHOLE WITH BURLAP CLOTH TIED
AT THE INNER END OF THE WEEPHOLE AND 300MM THK.
FILTER STONES SPACED AT 200mm ON CENTER STAGGERED

SEE DETAIL "B" ITEM 506(a) - STONE MASONRY


B = 60mm H
E
NATURAL GRADE LINE

BOTTOM BASE OF STONE MASONRY ELEVATION


100MMØ PVC WEEPHOLE WITH BURLAP CLOTH TIED
AT THE INNER END OF THE WEEPHOLE AND 300MM THK.
FILTER STONES SPACED AT 200mm ON CENTER STAGGERED

DETAIL ON STONE MASONRY W/ PARAPET WALL


SCALE 1: 60 MTS

PROJECT & LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES DETAIL OF STONE MASONRY

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PAULYNNE A. GATCHALIAN


LOCAL INFRASTRUCTURE PROGRAM,
REGIONAL OFFICE NO. 1 DRAFTSMAN II - COS
CONSTRUCTION OF MULTI-PURPOSE BUILDING
Planning and Design Division PREPARED:
Bridges & Other Public Works Design Section
(BARANGAY HALL)
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III S
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
11
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
BRGY. STA. RITA EAST, ARINGAY, LA UNION
BILLY JOE M. MOSTER
ENGINEER III DATE: DATE: DATE: DATE: