OYSTER TECHNOCON

PROPOSAL FOR
GRID CONNECTED ROOFTOP SOLAR SYSTEM
SOLAR ENERGY FOR A BETTER TOMORROW

PREPARED FOR: PREPARED BY:

Shree Vivek Kishor Chinchkhede Mr. PRAFUL ATHAWALE


Pawan Putra Society, Nagpur-440014 Plot No. 08, Shastri Nagar,
Bhandara Road,
Nagpur – 440008

COVER LETTER

REF NO.: OT/SOLAR/25R/23-24 DATE: 05/03/2024

Dear Shree Vivek Kishor Chinchkhede

As a Solar Company, we have worked with different clients in a variety of sectors, including
residential and commercial projects. At OYSTER TECHNOCON we pride ourselves on creating
custom solar energy solutions that fit the specific needs of your home, office or commercial
building. We are confident that we have the necessary skills and experience to provide you with a
comprehensive solution that will address your needs.

The cost of energy from MSEB power grids keeps going up, and the importance of maintaining a healthy
environment grows every day. Installing a solar energy system is a cost-effective, sustainable, and simple
way to reduce your environmental footprint and your energy budget. We care about the natural
environment as much as we do. Solar energy is non-polluting and renewable. Over 25 years, your new
system will offset your carbon footprint by 20 tons of CO2, equal to planting 35 acres of trees.

OYSTER TECHNOCON is authorized to install the solar energy solutions in India. This package
contains everything you'll need to select a solar energy plan that's right for your residential/commercial
building, including facts and figures supporting the expected outcome a solar energy system will have on
your overall costs, and projecting when your new system will "pay for itself" in energy savings.
We're confident that our qualifications and experience in the solar energy field will meet your needs, and
we look forward to working with you to make your workplaces and buildings more efficient.

Sincerely

OYSTER TECHNOCON

1
Project This proposal provides an outline and estimate of costs for installing a solar
Summary energy system for your Residential/commercial building at Nagpur. This
estimate is based on blueprints, telephone conversations, and a briefing on
dated 3rd March 2024.

Scope of System Estimate Annual Energy Solar Panel Solar Inverter


Production

Design, installation and Approx. 4650 Units Premier Bifacial Havells On-Grid
commissioning of 3.18 KW Double Glass Solar Inverter
On-Grid Roof Mounted DCR Solar
Solar Power Plant. Panels

Working principle of Solar PV System

Solar Photovoltaic technology (SPV) enables direct conversion of Sunlight into electricity. Photovoltaic cells,
commonly known as Solar cells, are used to convert light into electricity. A number of Solar cells joined together
make a Solar Photovoltaic module. The electrical output of a PV module is rated in terms of peak watt, which is the
maximum power output that the PV module could deliver under standard test conditions of incident solar
radiation of 1000 watts per square meter area, Air mass 1.5 and ambient temperature 25°C. A combination of few
Solar Modules makes a Solar Array. Solar modules made of solar cells produce Direct Current electricity from light,
which can be used to power equipment or to recharge a battery. An inverter is required to convert a direct current
(DC) into an alternating current (AC). These systems can be grid connected or off grid power for remote. Most
parts of India have about 285 sunny days. Average Solar radiation incident over the land is in the range of 4 -7 KWh
per square meter per day. Solar Photovoltaic power plant can be installed in land, on roof tops or even in water as
a floating body. Floating solar power plant is a recent development initiated by NBIRT, Kolkata. The PV power plant
can be grid connected or off grid power station or remote places. In grid connected plant, power generated from
the plant is exported to the grid through inverter and export-import meter. Power generated from solar module is
DC power which is converted to AC power using Inverter before feeding it to grid. Following diagram will explain
the Grid connected SPV power generation system

2
Materials and Scope of Work

S.No Components Description Make & Models Quantity


Solar Bifacial Double Glass
1 Premier Panels 06
DCR Module 530 Wp
2 Solar Grid Tie Inverter 3.3 kW Havells 01
3 DC Distribution Box Standard 01
4 AC Distribution Box Standard 01
5 Module Mounting Structure Standard Hot-dip G.I.
6 Solar Grade DC cable Polycab/Microtek At Actual
7 Solar Grade AC cable Polycab/Microtek At Actual
8 Net and generation metre L&T or HPL 2
9 Earthing System Reputed make 3 Set

OUR PROPOSAL

1. Commercial Offer - ON GRID SYSTEM

SN Item Description Cost GST Total

Installation, Testing and Commissioning of


1 158300.00 21810.00 180110.00
Rooftop solar system with basic height
Charges for 1 Phase Net Metre, generation
2 15000.00 -- 15000.00
metre and Subsidy
TOTAL 195110.00

Rupees One Lakh Ninety Five Thousand


One Hundred and Ten Only

WARRANTY:
 Solar panels guaranteed for 25 Years
 Inverter guaranteed for 10 Years

BANK ACCOUNT DETAILS :


OYSTER TECHNOCON
Bank Name: State Bank of India
Account Number: 40015036635
IFSC Code: SBIN0030425
Disclaimer: The prices listed in the preceding table are an estimate for the services discussed. This summary is not a warranty of final price. Estimates are subject to
change if project specifications are changed or costs for outsourced services change before a contract is executed.

3
ABOUT US:

OYSTER TECHNOCON’S SOLAR ENERGY SERVICES:

OYSTER TECHNOCON is a small business with a big impact. We've helped more than 500+ clients make
a full or partial switch from power grid to solar - for heating, cooling, and other energy needs. It's all
part of OYSTER TECHNOCON commitment to keeping up with the latest technology and sustainable
energy expertise, so we can offer our customers the very best home and business comfort at the very
best prices.
Our satisfied customers include office and retail buildings, residential developers, institutions, and of
course homeowners. Our business is keeping people and the environment healthy, comfortable, and
happy knowing that they've made responsible choices in their fuel and energy consumption.

All of our solar energy


experts are highly trained,
certified, licensed, insured,
and bonded.

TERMS & CONDITIONS:

Purchase Order (PO) for Supply & Work Order (WO) for Services is required on the name OYSTER
TECHNOCON Nagpur (GST: 27AAHFO1666K1ZW)

Note:
*after site visit cost of project may vary

*THIS SUBSIDY is deposited to beneficiaries account after solar project completion and it is totally on Central
government only.

*THIS QUOTATION IS VALID FOR 7 DAYS ONLY * Transport extra (outside Nagpur)

Delivery Period for Dispatch of Materials:

 1 Week on receipt of Purchase Order (PO) & Advance Payment


 Completion Period 1 Week subject to availability of complete set and area

Schedule of Payments:

 60 % of the offered price for supply as an advance, 30% at the time of delivery of all materials 10%
after installation and completion of the project
 Owner/client shall release all due payments within 3 days from the date of receipt of relevant
documents.
4
Warranty Details:

A. Solar Photovoltaic Modules Output Warranty

 97.5% for first year, thereafter from two to twenty-five years 0.7% max decrease in module
nominal power output per year ending with 80.7% in the 25th year
 10-year material warranty
 25 years’ linear performance warranty

OEM Warranty is applicable for workmanship against manufacturing defects, is subject to equipment
/ material or part thereof not being subject to accident, alteration or improper Use.

B. Solar Inverter Warranty 10 Years


The Solar inverters are warranted for 10 years from the OEM. OEM Warranty is applicable for
workmanship against manufacturing defects, is subject to equipment / material or part.
Thereof not being subject to accident, alteration or improper use.
C. 5-year onsite service provided by OYSTER TECHNOCON for the system check-up and
maintenance. Thereafter visiting charges applicable

PROPOSAL SIGN-OFF

Additional charges will be included if changes are made to the project scope once this document has
been signed and/or differences between the allowance outlined above and the actual cost of these
items varies.

The next step is to agree to this proposal (in addition to any changes that have been noted in the
presentation of this document), and to sign the contractual agreement which references the
document above.

If you have questions on this proposal, feel free to contact PROPOSAL LEAD at your convenience by
email at oyster.technocon@gmail.com or by phone at +91-8551019504. We will be in touch with you
next week to arrange a follow-up conversation on the proposal.
Thank you for your consideration,

Signature

Proposal Lead: MR. PRAFUL AATHAWALE


OYSTER TECHNOCON
Nagpur

You might also like