Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

M.

H COVER (2'-0"X1'-6")

10"

IRON STEPS
10"
7' M.H COVER (1'-8" DIA.)
2'
INLET OUTLET PIPE CONNECTED
TO SOAK PIT
PIPE

5"TH. BAFFLE WALL


10"
10" 3"TH. R.C.C FINGE

10" 2' 3' 4'-7" 4' 2' 10"


10" 5" 10"
10" 12' 10"

PLAN OF THE SEPTIC TANK

P.C.C(1:4:8)
IN LET T BEND
M.H COVER (2'-0'X1'-6")
3"TH. R.C.C FINGE 4" THICK R.C.C SLAB

OUT LET T BEND


1'
LIQUID LEVEL
2" 1'-6" 1'-2"
1'-3" IRON STEPS

5'-2"1'-2" 1'-8" 5' 5"TH. BAFFLE WALL


1'-8"
2'-1" 2'-1"
1'-9"
1'
8" 8"TH. P.C.C(1:3:6)

SECTION OF THE SEPTIC TANK

INLET CHAMBER

DRAIN

0.600M SAND 1:2-2:0 MM


0.300M GRAVELS 5-10 MM
0.300M BOULDER 5-10 MM

27.65 SLOTTED PIPE 3MM

100MM P V C PIPE
6.0M 200MM DIA BORE
GRAVELS 5-10 MM

DETAIL OF RECHARGE PIT