Tower TOWER R Floor 10TH FLOOR Unit(s) STAIRCASE Activity REINFORCEMENT WORKS - PRE, DURING & POST CHECK WIR Created By TAPAN DAS WIR Status Approved WIR Created Date 6/4/2024 4:00:01 PM WIR Closed Date 6/4/2024 6:13:27 PM Contractor Krishna Hi-tech Pvt.Ltd.- Phase Retreat Prakriti
TASKS HISTORY
SI # Location Task User Status Scheduled Date Closed Date
1 ST-02 (10th floor - 1/2 REINFORCEMENT WORKS TAPAN Added 6/4/2024 4:00:01 landing) - PRE, DURING & POST DAS PM CHECK 2 ST-02 (10th floor - 1/2 REINFORCEMENT WORKS Kabir Approved 6/4/2024 6:13:27 6/4/2024 6:13:27 landing) - PRE, DURING & POST Mondal PM PM CHECK
SI # Checkpoint Client Comments Contractor Comments Last Status Photos
1 Name, date and number of the GFC drawing Pass 2 Is the area prepared for starting reinforcement Pass (shuttering complete, cleaned, oiled, taped & required safety measures has been taken) 3 Aproved bar bending schedule available and the Pass area to be reinforced compatible with the approved drawings? 4 Are the required tools available at site to ensure Pass correct work? 5 Is the reinforcement stacked on wooden runners Pass and free from oil, mud, grease and other forms of contamination? 6 Is the overlapping of rebar for correct length and Pass the laps are staggered? 7 Are the development length provided for Pass Beams/Columns as per drawing/BBS? 8 Are the dowels for columns, beams and slabs in Pass place checked for proper length as per the bar bending plan or schedule? 9 Are the required hooks fixed and is the Pass chainheight or the upper layer of reinforcement correct? Can the chair support the construction load without displacement of rebar? 10 Is the reinforcement done as per specification Pass and drawing [numbers, spacing, shape]?(Tolerance 10mm for effective depth 200mm &15mm for depth above 200mm) 11 Are cover blocks provided and fixed as per Pass specifications,have beam and column joints checked for sufficient cover bIocks?(Tolerance to Cover+5mm) 12 Is the rebar assembly well tied and able to take Pass construction loads & forces? 13 Is the binding wire of correct size 16 to 22 gauge Pass black annealed steel wire used? Are the ends of the binding wire turned away from the surface? 14 Has the consultant inspected the reinforcement NA before the concreting has started? 15 Check for support system for reinforcement Pass works as per technical specification requirements 16 Check the top level of the reinforcement ( Pass excluding cover ) as per approved GFC drawing