804798: GODREJ PRAKRITI-TOWER R

-REINFORCEMENT WORKS - PRE, DURING & POST CHECK

Company Godrej Properties Project GODREJ PRAKRITI


Tower TOWER R Floor 10TH FLOOR
Unit(s) STAIRCASE Activity REINFORCEMENT WORKS
- PRE, DURING & POST
CHECK
WIR Created By TAPAN DAS WIR Status Approved
WIR Created Date 6/4/2024 4:00:01 PM WIR Closed Date 6/4/2024 6:13:27 PM
Contractor Krishna Hi-tech Pvt.Ltd.- Phase Retreat
Prakriti

TASKS HISTORY

SI # Location Task User Status Scheduled Date Closed Date


1 ST-02 (10th floor - 1/2 REINFORCEMENT WORKS TAPAN Added 6/4/2024 4:00:01
landing) - PRE, DURING & POST DAS PM
CHECK
2 ST-02 (10th floor - 1/2 REINFORCEMENT WORKS Kabir Approved 6/4/2024 6:13:27 6/4/2024 6:13:27
landing) - PRE, DURING & POST Mondal PM PM
CHECK

SI # Checkpoint Client Comments Contractor Comments Last Status Photos


1 Name, date and number of the GFC drawing Pass
2 Is the area prepared for starting reinforcement Pass
(shuttering complete, cleaned, oiled, taped &
required safety measures has been taken)
3 Aproved bar bending schedule available and the Pass
area to be reinforced compatible with the
approved drawings?
4 Are the required tools available at site to ensure Pass
correct work?
5 Is the reinforcement stacked on wooden runners Pass
and free from oil, mud, grease and other forms
of contamination?
6 Is the overlapping of rebar for correct length and Pass
the laps are staggered?
7 Are the development length provided for Pass
Beams/Columns as per drawing/BBS?
8 Are the dowels for columns, beams and slabs in Pass
place checked for proper length as per the bar
bending plan or schedule?
9 Are the required hooks fixed and is the Pass
chainheight or the upper layer of reinforcement
correct? Can the chair support the construction
load without displacement of rebar?
10 Is the reinforcement done as per specification Pass
and drawing [numbers, spacing,
shape]?(Tolerance 10mm for effective depth
200mm &15mm for depth above 200mm)
11 Are cover blocks provided and fixed as per Pass
specifications,have beam and column joints
checked for sufficient cover bIocks?(Tolerance
to Cover+5mm)
12 Is the rebar assembly well tied and able to take Pass
construction loads & forces?
13 Is the binding wire of correct size 16 to 22 gauge Pass
black annealed steel wire used? Are the ends of
the binding wire turned away from the surface?
14 Has the consultant inspected the reinforcement NA
before the concreting has started?
15 Check for support system for reinforcement Pass
works as per technical specification
requirements
16 Check the top level of the reinforcement ( Pass
excluding cover ) as per approved GFC drawing

Page 1|1