812732: GODREJ PRAKRITI-TOWER R

-STRUCTURAL CONCRETE - PRE CHECKS

Company Godrej Properties Project GODREJ PRAKRITI


Tower TOWER R Floor 10TH FLOOR
Unit(s) STAIRCASE Activity STRUCTURAL CONCRETE
- PRE CHECKS
WIR Created By Souvik Biswas WIR Status Approved
WIR Created Date 6/7/2024 7:24:16 PM WIR Closed Date 6/7/2024 9:07:59 PM
Contractor Krishna Hi-tech Pvt.Ltd.- Phase Retreat
Prakriti

TASKS HISTORY

SI # Location Task User Status Scheduled Date Closed Date


1 Staircase -2(half STRUCTURAL CONCRETE Souvik Added 6/7/2024 7:24:16
landing to 11th floor) - PRE CHECKS Biswas PM
2 Staircase -2(half STRUCTURAL CONCRETE Kabir Approved 6/7/2024 9:07:59 6/7/2024 9:07:59
landing to 11th floor) - PRE CHECKS Mondal PM PM

SI # Checkpoint Client Comments Contractor Comments Last Status Photos


1 Check Availability of approved concrete mix Pass
design & Material test results from approved
RMC Plant
2 Check Form works and Reinforcement works are Pass
100% completed sign off Respective work in
charge obtained
3 The pour plan approval shall be taken from the Pass
structural consultant, EIC and QIC prior to
commencing the each slab Pour etc.
4 The approved pour plan including construction Pass
joint, cube sampling, pouring details etc shall be
available in hard copy with Respective concrete
incharges
5 A pour card shall be documented to record Pass
approval of every concrete pour along with MEP,
contractor & GPL team signature for clearance.
6 The contractor’s site Engineer and contractors Pass
Quality control Engineer shall inspect the work
and record their observations before seeking the
pour card approval of the Engineer.
7 Ensure proper tools & tackles, fuel and Pass
necessary size of Needle vibrators are available
to ensure proper compaction
8 Check for proping system, Back proping and re- Pass
Proping as per design
9 Reinforcement works are completed and signed Pass
off including placing of Necessary covers,
dowels / lapping provison and chairs to all
locations.
10 Ensure for all sleeves, cutouts and proper fixing Pass
and placing of MEP fittings inline with drawing
11 Check the Slab Top levels & Slab thickness Pass
including sunken sizes and Locations per GFC
12 Ensure Skilled masons and sufficient manpower Pass
are available as required with necessary
Induction.
13 check availability of GFC drawings with Layout Pass
plan and level and with Coordinates.
14 Ensure every 3 rd floor checked as per Pass
Coordinates to analyse the Verticality of the
Building and data available with Architect
approval
15 Check for waterproofing scheme, if any NA
Waterproofing layer or material to be spared
ensure done
16 Ensure starter level, formwork line and Pass
dimensions are proper as per size of the
element.
17 Ensure Formwork holes, Joints are masked Pass
including where ever Light holes visible at
bottom of slab to be packed with foam sheet and
appropriate material to avoid any kind of slurry
leaks
18 Check for pumps of suitable capacity provided Pass
on the site
19 Check for proper cleaning and shuttering oil Pass
application

P T O. Page 1|2
812732: GODREJ PRAKRITI-TOWER R
-STRUCTURAL CONCRETE - PRE CHECKS

20 Proper lighting arrangement made for concreting Pass


during night time and taurpalin sheet avilable if
required
21 Check for wall panels bottom mortar packing, toe NA
supprot and extra supports if any

Page 2|2