812730: GODREJ PRAKRITI-TOWER R

-STRUCTURAL CONCRETE - DURING POUR

Company Godrej Properties Project GODREJ PRAKRITI


Tower TOWER R Floor 10TH FLOOR
Unit(s) STAIRCASE Activity STRUCTURAL CONCRETE
- DURING POUR
WIR Created By Souvik Biswas WIR Status Approved
WIR Created Date 6/7/2024 7:24:08 PM WIR Closed Date 6/7/2024 9:07:49 PM
Contractor Krishna Hi-tech Pvt.Ltd.- Phase Retreat
Prakriti

TASKS HISTORY

SI # Location Task User Status Scheduled Date Closed Date


1 Staircase -2( half STRUCTURAL CONCRETE Souvik Added 6/7/2024 7:24:08
landing to 11th floor) - DURING POUR Biswas PM
2 Staircase -2( half STRUCTURAL CONCRETE Kabir Approved 6/7/2024 9:07:49 6/7/2024 9:07:49
landing to 11th floor) - DURING POUR Mondal PM PM

SI # Checkpoint Client Comments Contractor Comments Last Status Photos


1 Availability & functionality of Vibrators with Pass
respective needle ( electrical & Diesel vibrator
shall be stand by checked before commence the
concrete)
2 Existing Construction Joints are Roughed and Pass
Cleaned. Applied with Epoxy Bonding agent to
receive Concrete.
3 Check Batch ticket as per Approved mix design Pass
and the approved tolerance guidelines as per
ITP
4 Does the concrete look homogenous without Pass
segregation, bleeding & have required
workability
5 Was pour plan followed fully? In case pour plan Pass
was not fully followed, give reasons.
6 All vehicle are poured with 3 hrs retention as per 04 hours Pass
mix design and NO redosing permitted
7 Ensure walkways are in place to avoid damage Pass
of Electrical conduits
8 Ensure Standby Electrician and Plumber to refix Pass
if any Electrical and Cut-out dislocations
9 Ensure Safety tools, PPE effective lights in case Pass
of night concrete
10 Workability at the pump point as measured by Pass
slump test shall be as per approve mix design
with tolerance of +/-25mm
11 Have concreting done by layers not exceeding Pass
300mm and next layer of concrete has to be
placed only after the bottom layer has been
compacted properly.
12 The concrete should be filled first in beam/wall Pass
and after slab
13 If the concrete Grade difference between Slab Pass
concrete , Column beam junction to be poured
with high grade ensure its being done with
Tower carne Bucket and Less Slump being
ensure for Effective application otherwise
permitted by consultant for same grade
14 In sunken area, Ensure forms for sunken are ties Pass
firmly and thickness should be maintained as per
drawing or specification.
15 In Sunken or cantilever portions don’t allow the Pass
pump concrete directly Pour with high pressure
extra care to be taken with manual placement
16 Ensure the thickness of concrete by using Pass
concrete gauge
17 Key for concrete: To Finish concrete Laying Pass
coarse aggregate on top of the concrete surface,
it should be key for upcoming concrete layers in
Wall/ column
18 Check for top concrete level & finishing in slab Pass
+/-10mm Max permitted with required finish
19 Early curing after 3 hours of concrete or the time Pass
of non-foot mark, Sprinkle curing to the slab
surface to be commenced to avoid Plastic
Shrinkage cracks