807424:GODREJPRAKRITI-TOWERQ

-REINFORCEMENTWORKS-PRE,DURING&POST CHECK

Company Godrej Properties Project GODREJ PRAKRITI


Tower TOWER Q Floor 15th FLOOR
Unit(s) COLUMN Activity REINFORCEMENT WORKS
-PRE,DURING&POST CHECK

WIRCreatedBy Arup KumarJantua WIRStatus Approved


WIRCreatedDate 6/5/2024 6:08:16 PM WIRClosedDate 6/5/2024 6:28:42 PM
Contractor KrishnaHi-techPvt.Ltd.- Prakriti Phase Retreat

TASKSHISTORY

SI# Location Task User Status ScheduledDate ClosedDate


1 T1C58,71. REINFORCEMENT WORKS Arup Added 6/5/2024 6:08:16
-PRE,DURING&POST CHECK Kumar PM
Jantua
2 T1C58,71. REINFORCEMENT WORKS SUBHADI Approved 6/5/2024 6:28:42 6/5/2024 6:28:42
-PRE,DURING&POST CHECK P PM PM
MALLICK

SI# Checkpoint ClientComments ContractorComments LastStatus Photos


1 Name, date and number of the GFC drawing R.C.DETAILOF RC DETAIL OF Pass
COL.SHEDULE COL.SCHEDUL
(10TH TO ROOF E(10TH TO
& ABOVE ROOF &ABOVE
ROOF ROOF)(BLOCK-
)(BLOCK-Q) Q).19/10/23- 012-
(SHEET-1,). DD-GP- BL(Q)-
012-DD-GP- CS-C- 114A,B,C
BL(Q)-CS-C-
114A.
09.10.2023
2 Istheareapreparedforstartingreinforcement Yes Pass
(shuttering complete, cleaned, oiled, taped &
required safety measures has been taken)
3 Aprovedbarbendingscheduleavailableandthe area to Yes Pass
be reinforced compatible with the approved
drawings?
4 Aretherequiredtoolsavailableatsitetoensure correct Yes Pass
work?
5 Isthereinforcementstackedonwoodenrunners andfree Yes Pass
from oil, mud, grease and other forms of
contamination?
6 Istheoverlappingofrebarforcorrectlengthand the laps Yes Pass
are staggered?
7 Arethedevelopmentlengthprovidedfor Yes Pass
Beams/Columns as per drawing/BBS?
8 Arethedowelsforcolumns,beamsandslabsin Yes Pass
placechecked for proper length as per thebar bending
plan or schedule?
9 Are the required hooks fixed and is the Yes Pass
chainheightortheupperlayerofreinforcement
correct?Canthechairsupporttheconstruction load
without displacement of rebar?
10 Isthereinforcementdoneasperspecification and Yes Pass
drawing [numbers, spacing, shape]?(Tolerance
10mm for effective depth 200mm &15mm for depth
above 200mm)
11 Are cover blocks providedand fixed as per Yes Pass
specifications,have beam and column joints
checkedforsufficientcoverbIocks?(Tolerance to
Cover+5mm)
12 Istherebarassemblywelltiedandabletotake construction Yes Pass
loads & forces?
13 Isthebindingwireofcorrectsize16to22gauge Yes Pass
blackannealedsteelwireused?Aretheendsof the
binding wire turned away from the surface?
14 Hastheconsultantinspectedthereinforcement before Yes Pass
the concreting has started?
15 Checkforsupportsystemforreinforcement works as Yes Pass
per technical specification requirements

16 Check the top level of the reinforcement Yes Pass


( excludingcover)asperapprovedGFCdrawing

Page1|1