1 Name, date and number of the GFC drawing R.C.DETAILOF RC DETAIL OF Pass COL.SHEDULE COL.SCHEDUL (10TH TO ROOF E(10TH TO & ABOVE ROOF &ABOVE ROOF ROOF)(BLOCK- )(BLOCK-Q) Q).19/10/23- 012- (SHEET-1,). DD-GP- BL(Q)- 012-DD-GP- CS-C- 114A,B,C BL(Q)-CS-C- 114A. 09.10.2023 2 Istheareapreparedforstartingreinforcement Yes Pass (shuttering complete, cleaned, oiled, taped & required safety measures has been taken) 3 Aprovedbarbendingscheduleavailableandthe area to Yes Pass be reinforced compatible with the approved drawings? 4 Aretherequiredtoolsavailableatsitetoensure correct Yes Pass work? 5 Isthereinforcementstackedonwoodenrunners andfree Yes Pass from oil, mud, grease and other forms of contamination? 6 Istheoverlappingofrebarforcorrectlengthand the laps Yes Pass are staggered? 7 Arethedevelopmentlengthprovidedfor Yes Pass Beams/Columns as per drawing/BBS? 8 Arethedowelsforcolumns,beamsandslabsin Yes Pass placechecked for proper length as per thebar bending plan or schedule? 9 Are the required hooks fixed and is the Yes Pass chainheightortheupperlayerofreinforcement correct?Canthechairsupporttheconstruction load without displacement of rebar? 10 Isthereinforcementdoneasperspecification and Yes Pass drawing [numbers, spacing, shape]?(Tolerance 10mm for effective depth 200mm &15mm for depth above 200mm) 11 Are cover blocks providedand fixed as per Yes Pass specifications,have beam and column joints checkedforsufficientcoverbIocks?(Tolerance to Cover+5mm) 12 Istherebarassemblywelltiedandabletotake construction Yes Pass loads & forces? 13 Isthebindingwireofcorrectsize16to22gauge Yes Pass blackannealedsteelwireused?Aretheendsof the binding wire turned away from the surface? 14 Hastheconsultantinspectedthereinforcement before Yes Pass the concreting has started? 15 Checkforsupportsystemforreinforcement works as Yes Pass per technical specification requirements
16 Check the top level of the reinforcement Yes Pass