Professional Documents
Culture Documents
SEMI FINALS EXAMINATION
SEMI FINALS EXAMINATION
SEMI FINALS EXAMINATION
Department of Education
REGION IV-A
SCHOOLS DIVISION OFFICE OF CAVITE PROVINCE
GENERAL MARIANO ALVAREZ TECHNICAL HIGH SCHOOL
SEMI-FINAL EXAMINATION
Civil Technology - Plumbing
GRADE EIGHT
Multiple Choices:
Direction: Read each situation/statement carefully. Choose and write the letter of the
best answer on the space before each number.
1. In your own room, you begin to segregate which items are for keeps and which are for
wastebasket. Which among the 5S is applied?
A. SEISO C. SEIRI
B. SHITSUKE D. SEITON
2. You're working in a warehouse where tools and equipment are scattered randomly. What
action should you take?
A. Leave the tools as they are and search for them when needed.
B. Organize tools in designated areas for easy access.
C. Pick- up the tools keep them together.
D. Request new tools to replace the missing ones.
3. Your shop work has accumulated dust and debris on the production floor. What is the
appropriate response?
A. Continue working despite the mess.
B. Sweep and clean the production floor to remove dust and debris.
C. Inform management about the cleanliness issue.
D. Avoid the dirty areas and work around them.
5. The comfort room is dirty with soap scum and water stains on the sink and mirror.
What's the appropriate action?
A. Leave the restroom as is and use it regardless.
B. Clean the sink and mirror to remove soap scum and water stains.
C. Avoid using the restroom until it's cleaned by janitorial staff.
D. Inform management about the restroom's cleanliness issues.
6. Each team member in the workshop has their own method of labeling parts and
materials. What should you recommend?
A. Maintain individual labeling methods to avoid confusion.
7. In the workshop, you notice several broken tools mixed with usable ones. What should
you do?
A. Keep all tools regardless of their condition.
B. Sort through the tools and discard the broken ones.
C. Ignore the broken tools and continue working.
D. Use the broken tools until they completely fail.
8. Your team is tasked witused to close the end of a dead-end pipe. organizing a storage
room. You come across several items that
haven't been used in months. What should you do?
A. Keep all items for future use.
B. Dispose of all items immediately.
C. Sort items into necessary and unnecessary categories.
D. Leave the items as they are.
9. Your workstation is cluttered, making it difficult to find tools when needed. What action
should you take?
A. Continue working in the cluttered environment.
B. Create a designated spot for each tool.
C. Add more clutter to make it easier to find items.
D. Ignore the clutter and search for tools when needed.
10. Several weeks after implementing 5S practices, you notice a decline in cleanliness and
organization. What should you do to address this?
A. Implement stricter rules and regulations.
B. Ignore the decline and hope it improves on its own.
C. Reinforce the importance of 5S principles and provide ongoing training.
D. Discontinue 5S practices altogether.
11. What do you call a document designed to guide you in the execution of a project?
A. BUILDING PLAN C. PROJECT PLAN
B. ACTION PLAN D. PLAN
12. Which part of the project plan contains the quantity of materials to be used?
A. WORKING DRAWING C. PROCEDURE
B. TOOLS NEEDED D. BILLS OF MATERIALS
15. In making a Project Plan. The first thing you have to consider is to have your
_______________ where you will determine the purpose of the project.
16. The bill of materials contains the ______________, unit, and description of materials.
A. QUANTITY C. MATERIALS
B. OBJECTIVE D. MONEY
17. ____________ is also important in purchasing your material and other
expenses.
A. QUANTITY C. MATERIALS
B. OBJECTIVE D. MONEY
18. Following the plan and using appropriate __________ will give you not only
quality output of the project but also keep you safe from any accident.
A. QUANTITY C. MATERIALS
B. MONEY D. TOOLS
22. What safety equipment should be worn when working with PVC cement?
A. Safety goggles and gloves
B. Earplugs
C. Face mask
D. Steel-toed boots
25. Which factor is NOT typically considered when planning a DIY PVC project?
A. Pipe size
B. Color of the PVC
C. Required fittings
D. Project dimensions
26. Which of the following is NOT a potential DIY PVC project?
A. PVC laptop stand
B. PVC shoe rack
C. PVC frying pan
D. PVC bird feeder
27. In what ways can PVC pipes be creatively used in DIY projects?
A. Only for plumbing
B. Only for storage
C. For furniture, decorations, and more
D. Only for gardening
28. What is the MOST advantage of using PVC over galvanized pipes in some
DIY projects?
A. PVC is cheaper
B. PVC is easier to work with
C. PVC is more durable
D. PVC is lighter
29. Which PVC fitting is used to create a 90-degree angle joint between two
pipes?
A. Tee fitting
B. Elbow fitting
C. Coupling
D. Union fitting
30. What is the recommended method for removing burrs from the cut end of a
PVC pipe?
A. sanding using sand paper
B. heating
C. scraping using blade
D. cutting using knife
31. Which safety precaution should be taken when working with PVC cement?
A. Use it in a well-ventilated area.
B. Wear gloves and safety goggles.
C. Avoid skin contact.
D. All of the above.
32. What is the measurement of both end of pipe the fits inside the pipe fittings
for the DIY PVC project?
A. 150 cm C. 1.5 cm
B. 15 cm D. 1.5 mm
33. Which pipe fitting is used to connect three pipes together at a junction?
A. TEE C. ELBOW
B. CROSS D. REDUCER
34. Which pipe fitting is used to close off the end of a pipe?
A. CAP C. PLUG
B. REDUCER D. UNION
35. Which pipe fitting is used to join two pipes together in a straight line?
A. Coupling C. ELBOW
B. Tee
C. Elbow
D. Cross