Copy of Engineering(1)

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 14

MATERIAL

Civil
laboratory Architectural

concrete factory administration building

Asphalt factory Ground Floor

insulation materials Roof Floor

Elevations and
steel structure Sections
Fire & life Safety
steel rebars layout

water stop interior layout

DOOR SCHEDULE
& LOUVER
gypsum bord fire/moisture SCHEDULE

FILLING
STATION
aluminum acoustic 60*60 PLAN

concrete block fire rated / Pump


cement tiles / curbstone Shed Plan
camera PTZ / fixed camera Site Plan

lighting poles
aluminium windows

ventilation louvres

ladders

Aluminuium Doors & Frame


Entrance

Tiling cermic

Painting

shutter door

GLS Tank

HDPE
Ductile Iron Pipes
Ductile fitting
Manholes covers
Chambers Stairs
PPR Pipes

Mech
Valves
Fitting
Fire Hydrants
Pumps
AC's
fire fighting
CHOLORINATOR
Dosing pumps
HVAC ducts
NOVEC FM200
Crane

electrical
power cables
control cables
communication cables
instruments cables
optical fiber cables

panel boards
earthing and lightning
protection
conduits and sleeves
cable trays
wiring devices
boxes
lighting fixtures
lighting poles
fite Alarm
CCTV
instruments
ShopDrawing
Mechanical Structure Electrical
administration
administration building administration building building

FOUNDATION
Ground Floor HVAC LAYOUT
Plan SECTIONS & PLAN
GROUND
FRAMING PLAN
Roof Floor HVAC SECTION &
Plan and schedule DETAILS

GLS TANSK
FOUNDATION
Ground Floor LAYOUT SECTION
PLUMBING PLAN & DETAILS
PLUMBING RISER FILLING
& SCHEDULE STATION

FIRE FIGHTING FOUNDATION


PLAN LAYOUT SECTION

STRUCTUREE
DETAILS &
SITE SCHEDULE

PUMP
ROOM
SHED
STRUCTU
RE
Valve box chamber DETAILS
STEE
STRUCTU
RE
TYPICAL CCTV
Injection Chammber DETAILS layout
CHAIN
LINK
Potable Water FENCE elec Site
Network Site Layout DETAILS layout

Storm Water
Network Site Layout SITE
pump SITE LOCATION
FEEDING PUMPS
PLAN AND BULIDING
SCHEDULE LOCATION
TRUCK
FILLING
STATION
PRPCESS
PLAN GRID LEVELING
TRANSIMI
GLS TANK SSION
PLAN LINE

GLS TANK STRUCTURE


DETAILS WASH CHAMBER
CHLORIN STRUCTURE
ATION FLOW METER
SYSTEM CHAMBER
TRANSIMI STRUCTURE
SSION BUTTER FLY
LINE VALVE CHAMBER
STRUCTURE AIR
RELASE
WASH CHAMBER CHAMBER
FLOW METER
CHAMBER
BUTTER FLY
VALVE CHAMBER
AIR RELASE
CHAMBER
Transportation PROFILE
administration PROJECT
building LOCATIONS POTABLE WATER NETWORK

ROAD GRID
AD Lighting LEVELING LAYOUT PLAN

ROAD LAYOUT
AD Power PLAN PROFILES
POTABLE
WATER
TRANSIMI
AD ROAD SETTING SSION
Lightining OUT PLAN LINE
AD Fire
alarm ROAD PROFILE LAYOUT PLAN
ROAD MARKING &
SIGNAGE LAYOUT
AD telecom PLAN PROFILES

ROAD MARKING
AD Power &SIGN MOUNTING
Table DETRAILS

ROAD TYPICAL
AD Details CROSS SECTIONS
Activity ID Activity Name Activity Status Activity % Calendar Days Start Date Finish Date Total Float (hrs)
Potable Water Connection for Aseer-1 Industrial City 5 01-Jul-2024 05-Jul-2024
Milestones
Preliminaries
Mobilization Works
Engineering
Pump Station & Filling station
Pump Station
shopdrawing
Pump Shed civil shopdrawing
PumpShed Mechanical shopdrawing
Pump Shed Architecture shopdrawing
Pump Shed Electrical shopdrawing
Filling Station civil shopdrawing
Filling Station Mechanical shopdrawing
Filling Station Architecture shopdrawing
Filling Station Electrical shopdrawing
material submission

Reviewing and approve mesh fence


Reviewing and approve steel fence
Reviewing and approve electrical cables.
Reviewing and approve steel fence gate
Reviewing and approve Isolation materials
Reviewing and approve Fire Alarm System
Reviewing and approve steel doors and windows
Reviewing and approve DI pipes
Reviewing and approve Lighting units and devices
Reviewing and approve wooden doors and windows
Reviewing and approve valves and fittings
Reviewing and approve main motor control center type MCC
Reviewing and approve control panel
Reviewing and approve Pumps
Reviewing and approve distribution panel
Reviewing and approve Electrical Devices
WATER TANKS
shopdrawing
civil shopdrawing
Mechanical shopdrawing
GLS TANK Plan
GLS TANK DETAILS
material submission
GLS Tank
ADMINISTRATION BUILDING
shopdrawing
civil shopdrawing
Architecture shopdrawing
Electrical shopdrawing
Mechanical shopdrawing
Fire Fitting ShopDrawing
HAVC Shopdrawing
material submission
concrete factory
steel rebars
gypsum bord fire/moisture
aluminum acoustic 60*60
concrete block fire rated / cement tiles / curbstone
aluminium windows
Aluminuium Doors & Frame Entrance
Tiling cermic
Painting
shutter door
PPR Pipes
Fire Hydrants
power cables
panel boards
cable trays
wiring devices
boxes
POTABLE WATER TRANSMISSION
shopdrawing
Transimission line Profile
Transimission Loine Corredor
Air Release Valve chambers details
Wash up Valve chamber details
ButterFly valve chamber details
material submission
Ductile Iron Pipes
Ductile fitting
Manholes covers
Chambers Stairs
Valves
Fitting
Isolation
POTABLE WATER NETWORK
shopdrawing
potablewater Profile
Potable Water Layout
Air Valve chambers details
Wash up Valve chamber details
ButterFly valve chamber details
material submission
HDPE
Valves and Fitting
2024
Jun Jul

You might also like