5. Payable Training manual
5. Payable Training manual
5. Payable Training manual
Approvals:
Mr. Francis A.
Copy Number
Document Control
Change Record
Reviewers
Distribution
Document Control...................................................................................................................ii
Introduction..............................................................................................................................1
Objective.............................................................................................................................1
Target Audience................................................................................................................1
Supplier Invoices....................................................................................................................2
Invoice Matching with PO...............................................................................................2
Prepayment Invoice..........................................................................................................2
Standard Invoice...............................................................................................................5
Credit Memo......................................................................................................................9
Application of prepayment...........................................................................................12
Project cost importation.......................................................................................................14
Inventory cost importation............................................................................................14
Supplier cost importation..............................................................................................16
Introduction
Emirates E&I Co. has chosen to deploy Project module of Oracle E-Business Suite
Release 12.2.5 (hereinafter in this document referred to as ‘Oracle’).
- General Ledger
- Payables
- Receivables
- Purchasing
- Order Management
- Inventory
- HRMS
Objective
The objective of this document is to outline detail steps that Emirates E&I team will
follow with respect to executing different Business Transactions. This document aims
to equip Emirate E&I team with requisite training to execute the business using Oracle
project module of release 12.2.5
Target Audience
The target audience for this document is the key user group of Emirates E&I team.
Supplier Invoice Creation for projects.
1.1 Navigation.
1.2 Objective.
Operating unit Default System will default the operating unit based on setups.
Type LOV Supplier Invoice type. Chose the Prepayment as the invoice type for
advance to supplier.
Amount Free text Enter the prepayment amount inclusive of tax amount
Lines
Distribution
Distribution Defaults Advance to Supplier account defaults by system. Include the project
Account segment manually.
Enter above details and save. Following Screen short to show the Invoice lines and distribution from.
Distribution line.
Prepayment Invoice is create. For prepayment application we need to validate and payment should be made.
2.1 Navigation.
2.2 Objective.
Navigate to Invoice work bench and select the invoice type as “Standard”.
Operating unit Default System will default the operating unit based on the user set ups.
Type LOV Supplier Invoice type. Chose the invoice type as Standard.
Lines
Distribution
Enter above details and Save. Following Screen short to show the Invoice lines and distribution from.
While creating a standard invoice for a customer for whom there is a prepayment is available, we will be getting
the above notification.
Distribution line
The screen short showing the standard invoice. Click on action to validate and create account.
3. Credit memo.
3.1 Navigation.
3.2 Objective.
Click On Distribution and enter the project details. System automatically defaults the account code
combination
4.1 Navigation.
4.2 Objective.
Following are the steps for application of prepayment invoice to the standard invoice.
Navigate to invoice work bench and query the invoice for which the prepayment
need to be applied.
Step: 4 Click on .
1.1 Navigation.
Project Costing > Expenditure > Transaction Import > Import Transaction.
1.2 Objective.
Step: 3 then “Click” ok and submit the request. Once the request completed successfully then we can see the inventory
cost in the project.
2.1 Objective.
In the parameter provide the project number and submit the request. Once the request completes successfully
we can see the supplier cost in the projects.