Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Classified as Confidential Internal by SEC - )‫الشركة السعودية للكهرباء مصنف مقيد (داخلي‬

PERSONNEL LEAVE APPROVAL REQUEST


(To be Completed by Contractor)

To: Engr.Basem T Alshareef Date Prepared :


CSD-WOA Division Manager

We Kindly seek your approval for this leave request as per the Following details:

Contractor : Holy Rock & Green Flag Engineering Consultancy Contract No: 4400018677
Personnel Name : I.D. NO:
Job Classification: Main Base Work Location:

REASON FOR LEAVE:

Annual Vacation Year Last Work Date : (G)


Resign / Terminate (DD/MM/YY)

Emergency Leave Start Date: (G)


Personal Return - To- Work Date:
Medical (DD/MM/YY)

Certified by: Total No. of Leave Days:


EARNED LEAVE CREDIT: REMAINING LEAVE CREDIT:
USED LEAVE: THIS LEAVE REQUEST:
Contractor REMAINING LEAVE CREDIT: NET TOTAL EARNED LEAVE CREDIT:

(FOR COMPANY USE ONLY) RELIEVER/REPLACEMENT:

Approved as requested Required: Resume of Proposed reliever

Not Approved; To be rescheduled to: must be submitted within thirty (30)


Last Work Date: Gregorian calendar days upon receipt of
(DD/MM/YY) COMPANY representative's approval of
Return- To- Work Date: leave request. A transition period of
(DD/MM/YY)
ten (10) working days in required with
Total No. of Leave Days: no additional cost to Company
Not Required

COMPANY APPROVAL CONTRACTOR APPROVAL

Name: Engr.Basem T Alshareef Name: Sahar Aldakhil


Position: CSD-WOA Division Manager Position: HR Representative
Signature: Signature:
Date: Date:

NOTE: To be prepared and submitted no less than (30) calendar days prior to personnel
vacation or expatriation leave.

REMARKS :

cc. SEC, Proponent - Supervisor Employee Signature:

Classified as Confidential Internal by SEC - )‫الشركة السعودية للكهرباء مصنف مقيد (داخلي‬

You might also like