Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 36

Bore No : BH. 1 Bore No : BH.

1
PT. GLOBAL PARASINDO JAYA Depth : 2.00-2.50 PT. GLOBAL PARASINDO JAYA PERMEABILITY OF Depth : 2.00-2.50
CONSOLIDATION TEST
Test By : Suhendra. CONSOLIDATION TEST Test By : Suhendra.
Rock & Soil Investigation Rock & Soil Investigation
Time LOAD (Kg)
0.825 1.650 3.300 6.600 13.200 25.400 6.600 0.825
0" 0.000 77.400 170.100 277.500 404.600 552.800 540.100
9.6" 8.700 87.300 182.100 292.300 420.800
21.4" 14.200 93.800 189.200 299.800 431.800
38.4" 19.100 99.600 195.300 307.500 440.900
1.0' 23.400 103.800 199.500 312.300 448.100
2.25' 32.600 114.900 211.300 326.100 465.700
4.0' 40.100 124.800 222.400 338.700 481.800 Kg/Cm2 ∆ Cm ∆H ∆H/H MV CV K=MV.CV.YW
9.0' 51.500 138.200 239.400 359.000 506.500 Cm2/Kg Cm2/Sec Cm/Sec
16.0' 58.800 147.600 251.400 373.300 522.800 -3
25.0' 62.900 153.500 258.600 381.500 532.400 (1) (2) (3) (4) (5) (6) (7) = 5.6.10
36.0' 65.700 157.000 262.800 385.900 537.500
49.0' 67.700 158.800 265.000 387.200 539.400
24 Hours 77.400 170.100 277.500 404.600 552.800 540.100 508.700
HS = 0.9269 Z= 1.4820
Moist. Content & Before After Void Ratio & Deg Before After Diameter of 0.25 1.9226 0.0774 0.0403 0.1610 5.17E-03 8.32E-07
Wet Density Test Test ree of Saturation Test Test Ring (Cm) = 6.50 0.50 1.8299 0.0927 0.0507 0.1013 5.05E-03 5.11E-07
Wt Wet Soil & Ring (gr) 288.24 277.43 Tickness (H) Cm 2.000 1.447 1.00 1.7225 0.1074 0.0624 0.0624 4.76E-03 2.97E-07
Wt Ring (gr) 181.26 181.26 H-Hs 2.00 1.5954 0.1271 0.0797 0.0398 4.15E-03 1.65E-07
Wt Wet Soil (gr) 106.98 96.17 eo = --------- 1.158 0.561 Area (A) = 33.18 4.00 1.4472 0.1482 0.1024 0.0256 3.23E-03 8.28E-08
Wt Dry Soil (gr) 79.23 79.23 Hs
Wt Water (gr) 27.75 16.94 Moist. Content (%) 35.02 21.38 3.78E-07
Moist. Content (%) 35.02 21.38 Degree of Saturat 77.93 98.13 Volume = 66.37
Wet Density (gr/cc) 1.612 1.449 Specific Gravity 2.576 2.576
Pressure Dial Original Correct Settlement ∆e e: Average Hight of t 90 CV :
Sample 0.212 Hm2
t 90
Kg/Cm2 Reading Settlement Tool ∆ (Cm) ∆ H/Hs eo-∆e Settlement Hm (Cm) (Second) Cm2/Sec
0.00 0.000 -
0.25 77.400 77.400 - 0.0774 0.0835 1.0741 0.0774 1.9226 151.69 5.17E-03
0.50 170.100 170.100 - 0.1701 0.1835 0.9741 0.1238 1.8763 147.89 5.05E-03
1.00 277.500 277.500 - 0.2775 0.2994 0.8583 0.2238 1.7762 140.45 4.76E-03
2.00 404.600 404.600 - 0.4046 0.4365 0.7211 0.3411 1.6590 140.45 4.15E-03
4.00 552.800 552.800 - 0.5528 0.5964 0.5613 0.4787 1.5213 151.69 3.23E-03
2.00 540.100 540.100 - 0.5401 0.5827 0.5750 0.5465 1.4536
0.25 508.700 508.700 - 0.5087 0.5488 0.6088 0.5244 1.4756 Average : 4.47E-03
Project : Location : Page : Project : Location : Page :
Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai. Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara. Kab. Serdang Bedagai. Prov. Sumatera Utara.
- -
Bore No : BH. 1
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 0.25 Kg/Cm2. Teg : 0.50 Kg/Cm2.
t90 : 1.59 Mnt. t90 : 1.57 Mnt.
Settlement Graph Time t90 : 151.69 Sec. Settlement Graph Time t90 : 147.89 Sec.

0.00 -72.00

-84.00
-10.00

-96.00
-20.00

-108.00
-30.00

-120.00

-40.00

-132.00

-50.00

-144.00

-60.00
-156.00

-70.00
-168.00

-80.00 -180.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 1
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 1.00 Kg/Cm2. Teg : 2.00 Kg/Cm2.
t90 : 1.53 Mnt. t90 : 1.53 Mnt.
Settlement Graph Time t90 : 140.45 Sec. Settlement Graph Time t90 : 140.45 Sec.

-155.00 -276.00

-170.00
-294.00

-185.00
-312.00

-200.00
-330.00

-215.00

-348.00

-230.00

-366.00
-245.00

-384.00
-260.00

-402.00
-275.00

-290.00 -420.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 1
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 4.00 Kg/Cm2.
t90 : 1.59 Mnt. e AND CV GRAPH
Settlement Graph Time t90 : 151.69 Sec.
1.2000

-390.00

1.0000
-410.00

-430.00
0.8000

-450.00

0.6000

-470.00

0.4000
0.10 1.00 10.00
-490.00

6.00E-03

-510.00 5.00E-03

4.00E-03

3.00E-03
-530.00
2.00E-03

1.00E-03

0.00E+00
-550.00
0.10 1.00 10.00

-570.00
Pressura in Kg/Cm2
0 1 2 3 4 5 6 7 8 Max Precompresion : 4.00 Kg/Cm2. Sample Area : 33.18 Cm2
21.4
In Situvoid Ratio eo : 1.158 Sample Height : 2.00 Cm
9.6 38.4 4 9 16 25 36 49 64 Coef of Consol (Cv) : 4.47E-03
Compres Index (Cc) : 0.4634

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 2 Bore No : BH. 2
PT. GLOBAL PARASINDO JAYA Depth : 2.00-2.50 PT. GLOBAL PARASINDO JAYA PERMEABILITY OF Depth : 2.00-2.50
CONSOLIDATION TEST
Test By : Suhendra. CONSOLIDATION TEST Test By : Suhendra.
Rock & Soil Investigation Rock & Soil Investigation
Time LOAD (Kg)
0.825 1.650 3.300 6.600 13.200 25.400 6.600 0.825
0" 0.000 70.600 155.800 259.500 386.900 541.500 529.100
9.6" 7.700 79.100 166.500 270.000 400.700
21.4" 11.800 84.000 171.300 278.400 409.800
38.4" 15.800 88.900 178.000 285.900 418.500
1.0' 18.900 92.100 181.600 291.500 424.300
2.25' 25.900 101.000 192.400 304.400 439.400
4.0' 32.400 108.400 202.000 318.100 454.100 Kg/Cm2 ∆ Cm ∆H ∆H/H MV CV K=MV.CV.YW
9.0' 43.100 120.600 217.000 335.400 477.100 Cm2/Kg Cm2/Sec Cm/Sec
16.0' 50.600 129.200 228.200 349.300 494.600 -3
25.0' 55.800 135.500 236.200 358.900 507.900 (1) (2) (3) (4) (5) (6) (7) = 5.6.10
36.0' 59.700 140.200 242.700 366.600 518.000
49.0' 62.800 145.000 247.200 372.400 525.100
24 Hours 70.600 155.800 259.500 386.900 541.500 529.100 498.900
HS = 0.9799 Z= 1.5460
Moist. Content & Before After Void Ratio & Deg Before After Diameter of 0.25 1.9294 0.0706 0.0366 0.1464 5.69E-03 8.33E-07
Wet Density Test Test ree of Saturation Test Test Ring (Cm) = 6.50 0.50 1.8442 0.0852 0.0462 0.0924 5.44E-03 5.03E-07
Wt Wet Soil & Ring (gr) 287.20 278.51 Tickness (H) Cm 2.000 1.459 1.00 1.7405 0.1037 0.0596 0.0596 4.49E-03 2.68E-07
Wt Ring (gr) 179.36 179.36 H-Hs 2.00 1.6131 0.1274 0.0790 0.0395 4.08E-03 1.61E-07
Wt Wet Soil (gr) 107.84 99.15 eo = --------- 1.041 0.488 Area (A) = 33.18 4.00 1.4585 0.1546 0.1060 0.0265 3.70E-03 9.82E-08
Wt Dry Soil (gr) 83.50 83.50 Hs
Wt Water (gr) 24.34 15.65 Moist. Content (%) 29.15 18.74 3.73E-07
Moist. Content (%) 29.15 18.74 Degree of Saturat 71.91 98.54 Volume = 66.37
Wet Density (gr/cc) 1.625 1.494 Specific Gravity 2.568 2.568
Pressure Dial Original Correct Settlement ∆e e: Average Hight of t 90 CV :
Sample 0.212 Hm2
t 90
Kg/Cm2 Reading Settlement Tool ∆ (Cm) ∆ H/Hs eo-∆e Settlement Hm (Cm) (Second) Cm2/Sec
0.00 0.000 -
0.25 70.600 70.600 - 0.0706 0.0720 0.9689 0.0706 1.9294 138.62 5.69E-03
0.50 155.800 155.800 - 0.1558 0.1590 0.8820 0.1132 1.8868 138.62 5.44E-03
1.00 259.500 259.500 - 0.2595 0.2648 0.7762 0.2077 1.7924 151.69 4.49E-03
2.00 386.900 386.900 - 0.3869 0.3948 0.6461 0.3232 1.6768 146.02 4.08E-03
4.00 541.500 541.500 - 0.5415 0.5526 0.4884 0.4642 1.5358 135.00 3.70E-03
2.00 529.100 529.100 - 0.5291 0.5399 0.5010 0.5353 1.4647
0.25 498.900 498.900 - 0.4989 0.5091 0.5318 0.5140 1.4860 Average : 4.68E-03
Project : Location : Page : Project : Location : Page :
Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai. Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara. Kab. Serdang Bedagai. Prov. Sumatera Utara.
- -
Bore No : BH. 2
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 0.25 Kg/Cm2. Teg : 0.50 Kg/Cm2.
t90 : 1.52 Mnt. t90 : 1.52 Mnt.
Settlement Graph Time t90 : 138.62 Sec. Settlement Graph Time t90 : 138.62 Sec.

0.00 -66.00

-10.00 -78.00

-20.00 -90.00

-30.00 -102.00

-40.00 -114.00

-50.00 -126.00

-60.00 -138.00

-70.00 -150.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 2
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 1.00 Kg/Cm2. Teg : 2.00 Kg/Cm2.
t90 : 1.59 Mnt. t90 : 1.56 Mnt.
Settlement Graph Time t90 : 151.69 Sec. Settlement Graph Time t90 : 146.02 Sec.

-155.00 -256.00

-274.00
-170.00

-292.00
-185.00

-310.00

-200.00

-328.00

-215.00

-346.00

-230.00
-364.00

-245.00
-382.00

-260.00 -400.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 2
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 4.00 Kg/Cm2.
t90 : 1.50 Mnt. e AND CV GRAPH
Settlement Graph Time t90 : 135.00 Sec.
1.0000

-380.00

-400.00
0.8000

-420.00

0.6000

-440.00

-460.00
0.4000
0.10 1.00 10.00

-480.00 6.00E-03

5.00E-03

4.00E-03

-500.00 3.00E-03

2.00E-03

1.00E-03

-520.00 0.00E+00
0.10 1.00 10.00

-540.00
Pressura in Kg/Cm2
0 1 2 3 4 5 6 7 8 Max Precompresion : 4.00 Kg/Cm2. Sample Area : 33.18 Cm2
21.4
In Situvoid Ratio eo : 1.041 Sample Height : 2.00 Cm
9.6 38.4 4 9 16 25 36 49 64 Coef of Consol (Cv) : 4.68E-03
Compres Index (Cc) : 0.4014

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 3 Bore No : BH. 3
PT. GLOBAL PARASINDO JAYA Depth : 2.00-2.50 PT. GLOBAL PARASINDO JAYA PERMEABILITY OF Depth : 2.00-2.50
CONSOLIDATION TEST
Test By : Suhendra. CONSOLIDATION TEST Test By : Suhendra.
Rock & Soil Investigation Rock & Soil Investigation
Time LOAD (Kg)
0.825 1.650 3.300 6.600 13.200 25.400 6.600 0.825
0" 0.000 75.000 164.800 273.500 406.400 564.800 550.900
9.6" 7.100 83.900 173.800 285.200 421.100
21.4" 11.600 89.100 179.600 293.600 429.900
38.4" 15.900 94.200 186.400 300.600 438.700
1.0' 18.900 97.700 190.100 305.100 443.800
2.25' 26.900 106.500 201.300 319.500 459.500
4.0' 34.200 114.800 211.800 331.000 474.600 Kg/Cm2 ∆ Cm ∆H ∆H/H MV CV K=MV.CV.YW
9.0' 45.000 127.100 227.000 350.100 497.700 Cm2/Kg Cm2/Sec Cm/Sec
16.0' 53.100 135.500 238.100 364.200 516.000 -3
25.0' 58.900 141.700 246.900 374.700 529.600 (1) (2) (3) (4) (5) (6) (7) = 5.6.10
36.0' 63.500 146.800 254.500 382.400 540.900
49.0' 67.000 151.100 259.100 389.200 549.200
24 Hours 75.000 164.800 273.500 406.400 564.800 550.900 518.500
HS = 0.8478 Z= 1.5840
Moist. Content & Before After Void Ratio & Deg Before After Diameter of 0.25 1.9250 0.0750 0.0390 0.1558 5.18E-03 8.07E-07
Wet Density Test Test ree of Saturation Test Test Ring (Cm) = 6.50 0.50 1.8352 0.0898 0.0489 0.0979 5.55E-03 5.43E-07
Wt Wet Soil & Ring (gr) 287.98 273.14 Tickness (H) Cm 2.000 1.435 1.00 1.7265 0.1087 0.0630 0.0630 4.72E-03 2.97E-07
Wt Ring (gr) 182.72 182.72 H-Hs 2.00 1.5936 0.1329 0.0834 0.0417 4.33E-03 1.80E-07
Wt Wet Soil (gr) 105.26 90.42 eo = --------- 1.359 0.693 Area (A) = 33.18 4.00 1.4352 0.1584 0.1104 0.0276 3.60E-03 9.94E-08
Wt Dry Soil (gr) 72.19 72.19 Hs
Wt Water (gr) 33.07 18.23 Moist. Content (%) 45.81 25.26 3.86E-07
Moist. Content (%) 45.81 25.26 Degree of Saturat 86.49 93.55 Volume = 66.37
Wet Density (gr/cc) 1.586 1.362 Specific Gravity 2.566 2.566
Pressure Dial Original Correct Settlement ∆e e: Average Hight of t 90 CV :
Sample 0.212 Hm2
t 90
Kg/Cm2 Reading Settlement Tool ∆ (Cm) ∆ H/Hs eo-∆e Settlement Hm (Cm) (Second) Cm2/Sec
0.00 0.000 -
0.25 75.000 75.000 - 0.0750 0.0885 1.2706 0.0750 1.9250 151.69 5.18E-03
0.50 164.800 164.800 - 0.1648 0.1944 1.1647 0.1199 1.8801 135.00 5.55E-03
1.00 273.500 273.500 - 0.2735 0.3226 1.0365 0.2192 1.7809 142.30 4.72E-03
2.00 406.400 406.400 - 0.4064 0.4794 0.8797 0.3400 1.6601 135.00 4.33E-03
4.00 564.800 564.800 - 0.5648 0.6662 0.6929 0.4856 1.5144 135.00 3.60E-03
2.00 550.900 550.900 - 0.5509 0.6498 0.7093 0.5579 1.4422
0.25 518.500 518.500 - 0.5185 0.6116 0.7475 0.5347 1.4653 Average : 4.68E-03
Project : Location : Page : Project : Location : Page :
Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai. Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara. Kab. Serdang Bedagai. Prov. Sumatera Utara.
- -
Bore No : BH. 3
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 0.25 Kg/Cm2. Teg : 0.50 Kg/Cm2.
t90 : 1.59 Mnt. t90 : 1.50 Mnt.
Settlement Graph Time t90 : 151.69 Sec. Settlement Graph Time t90 : 135.00 Sec.

0.00 -74.00

-10.00 -86.00

-20.00 -98.00

-30.00 -110.00

-40.00 -122.00

-50.00 -134.00

-60.00 -146.00

-70.00 -158.00

-80.00 -170.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 3
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 1.00 Kg/Cm2. Teg : 2.00 Kg/Cm2.
t90 : 1.54 Mnt. t90 : 1.50 Mnt.
Settlement Graph Time t90 : 142.30 Sec. Settlement Graph Time t90 : 135.00 Sec.

-160.00 -258.00

-175.00
-276.00

-294.00
-190.00

-312.00
-205.00

-330.00

-220.00

-348.00

-235.00

-366.00

-250.00
-384.00

-265.00 -402.00

-280.00
-420.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 3
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 4.00 Kg/Cm2.
t90 : 1.50 Mnt. e AND CV GRAPH
Settlement Graph Time t90 : 135.00 Sec.
1.4000
-400.00

1.2000

-420.00

1.0000

-440.00
0.8000

-460.00
0.6000

-480.00 0.4000
0.10 1.00 10.00

-500.00 6.00E-03

5.00E-03

4.00E-03

-520.00 3.00E-03

2.00E-03

1.00E-03

-540.00 0.00E+00
0.10 1.00 10.00

Pressura in Kg/Cm2
-560.00
0 1 2 3 4 5 6 7 8 Max Precompresion : 4.00 Kg/Cm2. Sample Area : 33.18 Cm2
21.4
In Situvoid Ratio eo : 1.359 Sample Height : 2.00 Cm
9.6 38.4 4 9 16 25 36 49 64 Coef of Consol (Cv) : 4.68E-03
Compres Index (Cc) : 0.4921

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 3 Bore No : BH. 3
PT. GLOBAL PARASINDO JAYA Depth : 13.50-14.00 PT. GLOBAL PARASINDO JAYA PERMEABILITY OF Depth : 13.50-14.00
CONSOLIDATION TEST
Test By : Suhendra. CONSOLIDATION TEST Test By : Suhendra.
Rock & Soil Investigation Rock & Soil Investigation
Time LOAD (Kg)
0.825 1.650 3.300 6.600 13.200 25.400 6.600 0.825
0" 0.000 70.800 155.700 258.900 383.900 535.100 524.900
9.6" 7.500 80.600 166.700 270.200 398.900
21.4" 11.600 85.500 173.400 278.400 407.700
38.4" 16.100 90.900 179.600 286.200 417.100
1.0' 19.500 94.500 184.300 291.400 422.800
2.25' 27.000 103.900 195.400 305.000 438.700
4.0' 33.400 112.100 205.100 318.000 454.500 Kg/Cm2 ∆ Cm ∆H ∆H/H MV CV K=MV.CV.YW
9.0' 43.500 124.200 221.300 336.800 479.100 Cm2/Kg Cm2/Sec Cm/Sec
16.0' 50.800 132.500 232.400 350.100 497.400 -3
25.0' 55.200 137.900 239.300 358.800 509.500 (1) (2) (3) (4) (5) (6) (7) = 5.6.10
36.0' 58.200 141.200 244.400 365.700 517.600
49.0' 60.500 144.100 247.200 370.100 522.100
24 Hours 70.800 155.700 258.900 383.900 535.100 524.900 497.600
HS = 0.8556 Z= 1.5120
Moist. Content & Before After Void Ratio & Deg Before After Diameter of 0.25 1.9292 0.0708 0.0367 0.1468 5.40E-03 7.93E-07
Wet Density Test Test ree of Saturation Test Test Ring (Cm) = 6.50 0.50 1.8443 0.0849 0.0460 0.0921 5.17E-03 4.76E-07
Wt Wet Soil & Ring (gr) 286.86 272.03 Tickness (H) Cm 2.000 1.465 1.00 1.7411 0.1032 0.0593 0.0593 4.91E-03 2.91E-07
Wt Ring (gr) 180.14 180.14 H-Hs 2.00 1.6161 0.1250 0.0773 0.0387 4.20E-03 1.62E-07
Wt Wet Soil (gr) 106.72 91.89 eo = --------- 1.337 0.712 Area (A) = 33.18 4.00 1.4649 0.1512 0.1032 0.0258 3.40E-03 8.78E-08
Wt Dry Soil (gr) 74.27 74.27 Hs
Wt Water (gr) 32.44 17.62 Moist. Content (%) 43.68 23.72 3.62E-07
Moist. Content (%) 43.68 23.72 Degree of Saturat 85.43 87.14 Volume = 66.37
Wet Density (gr/cc) 1.608 1.385 Specific Gravity 2.616 2.616
Pressure Dial Original Correct Settlement ∆e e: Average Hight of t 90 CV :
Sample 0.212 Hm2
t 90
Kg/Cm2 Reading Settlement Tool ∆ (Cm) ∆ H/Hs eo-∆e Settlement Hm (Cm) (Second) Cm2/Sec
0.00 0.000 -
0.25 70.800 70.800 - 0.0708 0.0827 1.2547 0.0708 1.9292 146.02 5.40E-03
0.50 155.700 155.700 - 0.1557 0.1820 1.1555 0.1133 1.8868 146.02 5.17E-03
1.00 258.900 258.900 - 0.2589 0.3026 1.0349 0.2073 1.7927 138.62 4.91E-03
2.00 383.900 383.900 - 0.3839 0.4487 0.8888 0.3214 1.6786 142.30 4.20E-03
4.00 535.100 535.100 - 0.5351 0.6254 0.7121 0.4595 1.5405 147.89 3.40E-03
2.00 524.900 524.900 - 0.5249 0.6135 0.7240 0.5300 1.4700
0.25 497.600 497.600 - 0.4976 0.5816 0.7559 0.5113 1.4888 Average : 4.62E-03
Project : Location : Page : Project : Location : Page :
Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai. Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara. Kab. Serdang Bedagai. Prov. Sumatera Utara.
- -
Bore No : BH. 3
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 13.50-14.00
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 0.25 Kg/Cm2. Teg : 0.50 Kg/Cm2.
t90 : 1.56 Mnt. t90 : 1.56 Mnt.
Settlement Graph Time t90 : 146.02 Sec. Settlement Graph Time t90 : 146.02 Sec.

0.00
-66.00

-10.00
-78.00

-20.00

-90.00

-30.00

-102.00

-40.00

-114.00

-50.00

-126.00

-60.00

-138.00
-70.00

-80.00 -150.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 3
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 13.50-14.00
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 1.00 Kg/Cm2. Teg : 2.00 Kg/Cm2.
t90 : 1.52 Mnt. t90 : 1.54 Mnt.
Settlement Graph Time t90 : 138.62 Sec. Settlement Graph Time t90 : 142.30 Sec.

-155.00
-246.00

-264.00
-170.00

-282.00
-185.00

-300.00

-200.00

-318.00

-215.00

-336.00

-230.00

-354.00

-245.00
-372.00

-390.00
-260.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 3
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 13.50-14.00
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 4.00 Kg/Cm2.
t90 : 1.57 Mnt. e AND CV GRAPH
Settlement Graph Time t90 : 147.89 Sec.
1.4000
-380.00

1.2000
-400.00

1.0000

-420.00

0.8000

-440.00
0.6000

-460.00
0.4000
0.10 1.00 10.00

-480.00 6.00E-03

5.00E-03

4.00E-03

-500.00 3.00E-03

2.00E-03

1.00E-03

-520.00 0.00E+00
0.10 1.00 10.00

Pressura in Kg/Cm2
-540.00
0 1 2 3 4 5 6 7 8 Max Precompresion : 4.00 Kg/Cm2. Sample Area : 33.18 Cm2
21.4
In Situvoid Ratio eo : 1.337 Sample Height : 2.00 Cm
9.6 38.4 4 9 16 25 36 49 64 Coef of Consol (Cv) : 4.62E-03
Compres Index (Cc) : 0.4593

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 4 Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA Depth : 2.00-2.50 PT. GLOBAL PARASINDO JAYA PERMEABILITY OF Depth : 2.00-2.50
CONSOLIDATION TEST
Test By : Suhendra. CONSOLIDATION TEST Test By : Suhendra.
Rock & Soil Investigation Rock & Soil Investigation
Time LOAD (Kg)
0.825 1.650 3.300 6.600 13.200 25.400 6.600 0.825
0" 0.000 75.600 165.900 273.500 403.600 559.800 548.200
9.6" 7.400 84.100 176.700 286.900 418.800
21.4" 12.300 89.700 182.900 294.600 428.400
38.4" 16.600 95.400 189.800 302.100 437.500
1.0' 19.900 99.200 195.400 306.900 443.200
2.25' 28.400 108.900 205.600 320.400 460.200
4.0' 35.100 118.000 216.100 332.900 475.600 Kg/Cm2 ∆ Cm ∆H ∆H/H MV CV K=MV.CV.YW
9.0' 46.500 130.200 231.600 352.500 500.100 Cm2/Kg Cm2/Sec Cm/Sec
16.0' 54.300 138.900 241.200 366.900 518.400 -3
25.0' 60.000 145.400 248.900 376.700 530.900 (1) (2) (3) (4) (5) (6) (7) = 5.6.10
36.0' 63.700 149.900 255.400 383.000 540.100
49.0' 66.000 153.300 259.700 387.300 545.500
24 Hours 75.600 165.900 273.500 403.600 559.800 548.200 514.600
HS = 0.9207 Z= 1.5620
Moist. Content & Before After Void Ratio & Deg Before After Diameter of 0.25 1.9244 0.0756 0.0393 0.1571 5.38E-03 8.45E-07
Wet Density Test Test ree of Saturation Test Test Ring (Cm) = 6.50 0.50 1.8341 0.0903 0.0492 0.0985 5.40E-03 5.32E-07
Wt Wet Soil & Ring (gr) 285.34 275.48 Tickness (H) Cm 2.000 1.440 1.00 1.7265 0.1076 0.0623 0.0623 4.54E-03 2.83E-07
Wt Ring (gr) 179.35 179.35 H-Hs 2.00 1.5964 0.1301 0.0815 0.0407 4.28E-03 1.74E-07
Wt Wet Soil (gr) 105.99 96.13 eo = --------- 1.172 0.564 Area (A) = 33.18 4.00 1.4402 0.1562 0.1085 0.0271 3.39E-03 9.19E-08
Wt Dry Soil (gr) 79.59 79.59 Hs
Wt Water (gr) 26.40 16.54 Moist. Content (%) 33.17 20.78 3.85E-07
Moist. Content (%) 33.17 20.78 Degree of Saturat 73.71 95.94 Volume = 66.37
Wet Density (gr/cc) 1.597 1.448 Specific Gravity 2.605 2.605
Pressure Dial Original Correct Settlement ∆e e: Average Hight of t 90 CV :
Sample 0.212 Hm2
t 90
Kg/Cm2 Reading Settlement Tool ∆ (Cm) ∆ H/Hs eo-∆e Settlement Hm (Cm) (Second) Cm2/Sec
0.00 0.000 -
0.25 75.600 75.600 - 0.0756 0.0821 1.0901 0.0756 1.9244 146.02 5.38E-03
0.50 165.900 165.900 - 0.1659 0.1802 0.9921 0.1208 1.8793 138.62 5.40E-03
1.00 273.500 273.500 - 0.2735 0.2971 0.8752 0.2197 1.7803 147.89 4.54E-03
2.00 403.600 403.600 - 0.4036 0.4384 0.7339 0.3386 1.6615 136.81 4.28E-03
4.00 559.800 559.800 - 0.5598 0.6080 0.5642 0.4817 1.5183 144.15 3.39E-03
2.00 548.200 548.200 - 0.5482 0.5954 0.5768 0.5540 1.4460
0.25 514.600 514.600 - 0.5146 0.5589 0.6133 0.5314 1.4686 Average : 4.60E-03
Project : Location : Page : Project : Location : Page :
Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai. Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara. Kab. Serdang Bedagai. Prov. Sumatera Utara.
- -
Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 0.25 Kg/Cm2. Teg : 0.50 Kg/Cm2.
t90 : 1.56 Mnt. t90 : 1.52 Mnt.
Settlement Graph Time t90 : 146.02 Sec. Settlement Graph Time t90 : 138.62 Sec.

0.00 -74.00

-10.00 -86.00

-20.00 -98.00

-30.00 -110.00

-40.00 -122.00

-50.00 -134.00

-60.00 -146.00

-70.00 -158.00

-80.00 -170.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 1.00 Kg/Cm2. Teg : 2.00 Kg/Cm2.
t90 : 1.57 Mnt. t90 : 1.51 Mnt.
Settlement Graph Time t90 : 147.89 Sec. Settlement Graph Time t90 : 136.81 Sec.

-150.00 -256.00

-165.00 -274.00

-180.00 -292.00

-195.00 -310.00

-210.00 -328.00

-225.00 -346.00

-240.00 -364.00

-255.00 -382.00

-270.00 -400.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 4.00 Kg/Cm2.
t90 : 1.55 Mnt. e AND CV GRAPH
Settlement Graph Time t90 : 144.15 Sec.
1.2000

-400.00

1.0000
-420.00

0.8000
-440.00

-460.00 0.6000

-480.00
0.4000
0.10 1.00 10.00

-500.00 6.00E-03

5.00E-03

4.00E-03

-520.00 3.00E-03

2.00E-03

1.00E-03

-540.00 0.00E+00
0.10 1.00 10.00

-560.00
Pressura in Kg/Cm2
0 1 2 3 4 5 6 7 8 Max Precompresion : 4.00 Kg/Cm2. Sample Area : 33.18 Cm2
21.4
In Situvoid Ratio eo : 1.172 Sample Height : 2.00 Cm
9.6 38.4 4 9 16 25 36 49 64 Coef of Consol (Cv) : 4.60E-03
Compres Index (Cc) : 0.4536

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 4 Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA Depth : 4.00-4.50 PT. GLOBAL PARASINDO JAYA PERMEABILITY OF Depth : 4.00-4.50
CONSOLIDATION TEST
Test By : Suhendra. CONSOLIDATION TEST Test By : Suhendra.
Rock & Soil Investigation Rock & Soil Investigation
Time LOAD (Kg)
0.825 1.650 3.300 6.600 13.200 25.400 6.600 0.825
0" 0.000 70.200 161.700 283.200 426.400 577.700 564.900
9.6" 11.700 83.200 179.100 302.300 444.200
21.4" 16.500 89.400 187.800 311.500 453.100
38.4" 21.500 95.600 196.100 321.300 461.900
1.0' 26.100 100.900 202.900 328.400 469.700
2.25' 34.600 111.700 217.400 345.500 484.500
4.0' 41.300 119.900 229.900 359.700 498.200 Kg/Cm2 ∆ Cm ∆H ∆H/H MV CV K=MV.CV.YW
9.0' 50.800 132.500 245.800 379.400 518.200 Cm2/Kg Cm2/Sec Cm/Sec
16.0' 55.400 139.000 255.000 392.000 532.900 -3
25.0' 58.000 143.000 259.600 399.100 542.800 (1) (2) (3) (4) (5) (6) (7) = 5.6.10
36.0' 60.000 146.800 263.000 405.100 551.200
49.0' 65.000 152.800 269.100 412.100 559.200
24 Hours 70.200 161.700 283.200 426.400 577.700 564.900 530.500
HS = 0.9543 Z= 1.5130
Moist. Content & Before After Void Ratio & Deg Before After Diameter of 0.25 1.9298 0.0702 0.0364 0.1455 5.41E-03 7.87E-07
Wet Density Test Test ree of Saturation Test Test Ring (Cm) = 6.50 0.50 1.8383 0.0915 0.0498 0.0995 5.43E-03 5.40E-07
Wt Wet Soil & Ring (gr) 290.52 279.66 Tickness (H) Cm 2.000 1.422 1.00 1.7168 0.1215 0.0708 0.0708 4.96E-03 3.51E-07
Wt Ring (gr) 182.41 182.41 H-Hs 2.00 1.5736 0.1432 0.0910 0.0455 4.09E-03 1.86E-07
Wt Wet Soil (gr) 108.11 97.25 eo = --------- 1.096 0.490 Area (A) = 33.18 4.00 1.4223 0.1513 0.1064 0.0266 3.30E-03 8.78E-08
Wt Dry Soil (gr) 82.49 82.49 Hs
Wt Water (gr) 25.62 14.76 Moist. Content (%) 31.06 17.89 3.90E-07
Moist. Content (%) 31.06 17.89 Degree of Saturat 73.84 95.02 Volume = 66.37
Wet Density (gr/cc) 1.629 1.465 Specific Gravity 2.605 2.605
Pressure Dial Original Correct Settlement ∆e e: Average Hight of t 90 CV :
Sample 0.212 Hm2
t 90
Kg/Cm2 Reading Settlement Tool ∆ (Cm) ∆ H/Hs eo-∆e Settlement Hm (Cm) (Second) Cm2/Sec
0.00 0.000 -
0.25 70.200 70.200 - 0.0702 0.0736 1.0223 0.0702 1.9298 146.02 5.41E-03
0.50 161.700 161.700 - 0.1617 0.1694 0.9264 0.1160 1.8841 138.62 5.43E-03
1.00 283.200 283.200 - 0.2832 0.2968 0.7991 0.2225 1.7776 135.00 4.96E-03
2.00 426.400 426.400 - 0.4264 0.4468 0.6490 0.3548 1.6452 140.45 4.09E-03
4.00 577.700 577.700 - 0.5777 0.6054 0.4905 0.5021 1.4980 144.15 3.30E-03
2.00 564.900 564.900 - 0.5649 0.5920 0.5039 0.5713 1.4287
0.25 530.500 530.500 - 0.5305 0.5559 0.5399 0.5477 1.4523 Average : 4.64E-03
Project : Location : Page : Project : Location : Page :
Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai. Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara. Kab. Serdang Bedagai. Prov. Sumatera Utara.
- -
Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 4.00-4.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 0.25 Kg/Cm2. Teg : 0.50 Kg/Cm2.
t90 : 1.56 Mnt. t90 : 1.52 Mnt.
Settlement Graph Time t90 : 146.02 Sec. Settlement Graph Time t90 : 138.62 Sec.

0.00 -62.00

-74.00
-10.00

-86.00

-20.00

-98.00

-30.00

-110.00

-40.00

-122.00

-50.00

-134.00

-60.00
-146.00

-70.00
-158.00

-80.00 -170.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 4.00-4.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 1.00 Kg/Cm2. Teg : 2.00 Kg/Cm2.
t90 : 1.50 Mnt. t90 : 1.53 Mnt.
Settlement Graph Time t90 : 135.00 Sec. Settlement Graph Time t90 : 140.45 Sec.

-150.00
-268.00

-165.00 -286.00

-180.00 -304.00

-195.00 -322.00

-210.00 -340.00

-225.00 -358.00

-240.00 -376.00

-255.00
-394.00

-270.00
-412.00

-430.00
-285.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 4.00-4.50
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 4.00 Kg/Cm2.
t90 : 1.55 Mnt. e AND CV GRAPH
Settlement Graph Time t90 : 144.15 Sec.
1.2000
-410.00

-430.00 1.0000

-450.00
0.8000

-470.00

0.6000

-490.00

0.4000
0.10 1.00 10.00
-510.00

6.00E-03

-530.00 5.00E-03

4.00E-03

3.00E-03
-550.00
2.00E-03

1.00E-03

0.00E+00
-570.00 0.10 1.00 10.00

Pressura in Kg/Cm2
-590.00
0 1 2 3 4 5 6 7 8 Max Precompresion : 4.00 Kg/Cm2. Sample Area : 33.18 Cm2
21.4
In Situvoid Ratio eo : 1.096 Sample Height : 2.00 Cm
9.6 38.4 4 9 16 25 36 49 64 Coef of Consol (Cv) : 4.64E-03
Compres Index (Cc) : 0.4679

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 4 Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA Depth : 17.50-18.00 PT. GLOBAL PARASINDO JAYA PERMEABILITY OF Depth : 17.50-18.00
CONSOLIDATION TEST
Test By : Suhendra. CONSOLIDATION TEST Test By : Suhendra.
Rock & Soil Investigation Rock & Soil Investigation
Time LOAD (Kg)
0.825 1.650 3.300 6.600 13.200 25.400 6.600 0.825
0" 0.000 48.300 107.700 181.200 270.900 381.100 374.100
9.6" 5.200 53.500 114.300 190.100 281.600
21.4" 7.800 56.600 118.500 194.800 287.000
38.4" 10.500 59.300 122.100 199.500 292.500
1.0' 12.300 61.800 125.300 203.400 297.300
2.25' 17.500 67.200 132.900 212.100 308.200
4.0' 21.700 71.900 139.000 219.800 318.000 Kg/Cm2 ∆ Cm ∆H ∆H/H MV CV K=MV.CV.YW
9.0' 28.300 79.400 149.200 231.700 333.100 Cm2/Kg Cm2/Sec Cm/Sec
16.0' 33.200 85.100 156.400 240.900 344.500 -3
25.0' 36.300 89.600 161.800 247.700 353.900 (1) (2) (3) (4) (5) (6) (7) = 5.6.10
36.0' 38.500 92.800 166.000 253.000 361.000
49.0' 40.100 95.900 169.000 257.400 366.400
24 Hours 48.300 107.700 181.200 270.900 381.100 374.100 349.200
HS = 1.0423 Z= 1.1020
Moist. Content & Before After Void Ratio & Deg Before After Diameter of 0.25 1.9517 0.0483 0.0247 0.0990 5.19E-03 5.14E-07
Wet Density Test Test ree of Saturation Test Test Ring (Cm) = 6.50 0.50 1.8923 0.0594 0.0314 0.0628 4.26E-03 2.68E-07
Wt Wet Soil & Ring (gr) 296.97 288.12 Tickness (H) Cm 2.000 1.619 1.00 1.8188 0.0735 0.0404 0.0404 3.80E-03 1.53E-07
Wt Ring (gr) 184.01 184.01 H-Hs 2.00 1.7291 0.0897 0.0519 0.0259 3.85E-03 9.98E-08
Wt Wet Soil (gr) 112.96 104.11 eo = --------- 0.919 0.553 Area (A) = 33.18 4.00 1.6189 0.1102 0.0681 0.0170 2.63E-03 4.48E-08
Wt Dry Soil (gr) 90.52 90.52 Hs
Wt Water (gr) 22.44 13.60 Moist. Content (%) 24.79 15.02 2.16E-07
Moist. Content (%) 24.79 15.02 Degree of Saturat 70.61 71.06 Volume = 66.37
Wet Density (gr/cc) 1.702 1.569 Specific Gravity 2.617 2.617
Pressure Dial Original Correct Settlement ∆e e: Average Hight of t 90 CV :
Sample 0.212 Hm2
t 90
Kg/Cm2 Reading Settlement Tool ∆ (Cm) ∆ H/Hs eo-∆e Settlement Hm (Cm) (Second) Cm2/Sec
0.00 0.000 -
0.25 48.300 48.300 - 0.0483 0.0463 0.8724 0.0483 1.9517 155.53 5.19E-03
0.50 107.700 107.700 - 0.1077 0.1033 0.8154 0.0780 1.9220 183.75 4.26E-03
1.00 181.200 181.200 - 0.1812 0.1738 0.7449 0.1445 1.8556 192.25 3.80E-03
2.00 270.900 270.900 - 0.2709 0.2599 0.6589 0.2261 1.7740 173.40 3.85E-03
4.00 381.100 381.100 - 0.3811 0.3656 0.5532 0.3260 1.6740 225.82 2.63E-03
2.00 374.100 374.100 - 0.3741 0.3589 0.5599 0.3776 1.6224
0.25 349.200 349.200 - 0.3492 0.3350 0.5838 0.3617 1.6384 Average : 3.95E-03
Project : Location : Page : Project : Location : Page :
Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai. Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara. Kab. Serdang Bedagai. Prov. Sumatera Utara.
- -
Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 17.50-18.00
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 0.25 Kg/Cm2. Teg : 0.50 Kg/Cm2.
t90 : 1.61 Mnt. t90 : 1.75 Mnt.
Settlement Graph Time t90 : 155.53 Sec. Settlement Graph Time t90 : 183.75 Sec.

0.00 -42.00

-5.00

-10.00 -54.00

-15.00

-20.00 -66.00

-25.00

-30.00 -78.00

-35.00

-40.00 -90.00

-45.00

-50.00 -102.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 17.50-18.00
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 1.00 Kg/Cm2. Teg : 2.00 Kg/Cm2.
t90 : 1.79 Mnt. t90 : 1.70 Mnt.
Settlement Graph Time t90 : 192.25 Sec. Settlement Graph Time t90 : 173.40 Sec.

-100.00 -172.00

-190.00
-115.00

-208.00

-130.00

-226.00

-145.00

-244.00

-160.00
-262.00

-175.00
-280.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 17.50-18.00
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 4.00 Kg/Cm2.
t90 : 1.94 Mnt. e AND CV GRAPH
Settlement Graph Time t90 : 225.82 Sec.
1.0000
-260.00

0.8000
-280.00

-300.00 0.6000

-320.00 0.4000
0.10 1.00 10.00

6.00E-03

-340.00 5.00E-03

4.00E-03

3.00E-03

2.00E-03

-360.00 1.00E-03

0.00E+00
0.10 1.00 10.00

Pressura in Kg/Cm2
-380.00
0 1 2 3 4 5 6 7 8 Max Precompresion : 4.00 Kg/Cm2. Sample Area : 33.18 Cm2
21.4
In Situvoid Ratio eo : 0.919 Sample Height : 2.00 Cm
9.6 38.4 4 9 16 25 36 49 64 Coef of Consol (Cv) : 3.95E-03
Compres Index (Cc) : 0.2617

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 4 Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA Depth : 25.50-26.00 PT. GLOBAL PARASINDO JAYA PERMEABILITY OF Depth : 25.50-26.00
CONSOLIDATION TEST
Test By : Suhendra. CONSOLIDATION TEST Test By : Suhendra.
Rock & Soil Investigation Rock & Soil Investigation
Time LOAD (Kg)
0.825 1.650 3.300 6.600 13.200 25.400 6.600 0.825
0" 0.000 65.200 143.800 240.600 360.900 506.700 498.200
9.6" 7.500 72.400 153.100 252.300 374.600
21.4" 11.300 77.500 158.200 258.700 383.100
38.4" 15.500 81.600 163.600 266.600 392.300
1.0' 18.900 84.900 167.400 270.800 397.600
2.25' 25.400 93.000 176.200 282.900 413.500
4.0' 31.200 100.500 185.000 295.800 428.100 Kg/Cm2 ∆ Cm ∆H ∆H/H MV CV K=MV.CV.YW
9.0' 40.800 111.400 198.700 313.100 448.900 Cm2/Kg Cm2/Sec Cm/Sec
16.0' 47.300 119.300 207.600 325.400 465.500 -3
25.0' 51.800 125.100 215.500 334.300 477.300 (1) (2) (3) (4) (5) (6) (7) = 5.6.10
36.0' 54.500 129.400 221.800 340.800 485.500
49.0' 56.800 132.500 225.500 347.100 491.800
24 Hours 65.200 143.800 240.600 360.900 506.700 498.200 469.100
HS = 0.9556 Z= 1.4580
Moist. Content & Before After Void Ratio & Deg Before After Diameter of 0.25 1.9348 0.0652 0.0337 0.1348 5.88E-03 7.92E-07
Wet Density Test Test ree of Saturation Test Test Ring (Cm) = 6.50 0.50 1.8562 0.0786 0.0423 0.0847 5.09E-03 4.31E-07
Wt Wet Soil & Ring (gr) 290.27 278.19 Tickness (H) Cm 2.000 1.493 1.00 1.7594 0.0968 0.0550 0.0550 4.93E-03 2.71E-07
Wt Ring (gr) 180.17 180.17 H-Hs 2.00 1.6391 0.1203 0.0734 0.0367 4.36E-03 1.60E-07
Wt Wet Soil (gr) 110.10 98.02 eo = --------- 1.093 0.563 Area (A) = 33.18 4.00 1.4933 0.1458 0.0976 0.0244 3.75E-03 9.16E-08
Wt Dry Soil (gr) 81.36 81.36 Hs
Wt Water (gr) 28.74 16.66 Moist. Content (%) 35.32 20.47 3.49E-07
Moist. Content (%) 35.32 20.47 Degree of Saturat 82.92 93.34 Volume = 66.37
Wet Density (gr/cc) 1.659 1.477 Specific Gravity 2.566 2.566
Pressure Dial Original Correct Settlement ∆e e: Average Hight of t 90 CV :
Sample 0.212 Hm2
t 90
Kg/Cm2 Reading Settlement Tool ∆ (Cm) ∆ H/Hs eo-∆e Settlement Hm (Cm) (Second) Cm2/Sec
0.00 0.000 -
0.25 65.200 65.200 - 0.0652 0.0682 1.0248 0.0652 1.9348 135.00 5.88E-03
0.50 143.800 143.800 - 0.1438 0.1505 0.9425 0.1045 1.8955 149.78 5.09E-03
1.00 240.600 240.600 - 0.2406 0.2518 0.8412 0.1922 1.8078 140.45 4.93E-03
2.00 360.900 360.900 - 0.3609 0.3777 0.7153 0.3008 1.6993 140.45 4.36E-03
4.00 506.700 506.700 - 0.5067 0.5303 0.5627 0.4338 1.5662 138.62 3.75E-03
2.00 498.200 498.200 - 0.4982 0.5214 0.5716 0.5025 1.4976
0.25 469.100 469.100 - 0.4691 0.4909 0.6021 0.4837 1.5164 Average : 4.80E-03
Project : Location : Page : Project : Location : Page :
Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai. Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara. Kab. Serdang Bedagai. Prov. Sumatera Utara.
- -
Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 25.50-26.00
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 0.25 Kg/Cm2. Teg : 0.50 Kg/Cm2.
t90 : 1.50 Mnt. t90 : 1.58 Mnt.
Settlement Graph Time t90 : 135.00 Sec. Settlement Graph Time t90 : 149.78 Sec.

0.00 -54.00

-66.00
-10.00

-78.00
-20.00

-90.00

-30.00

-102.00

-40.00

-114.00

-50.00
-126.00

-60.00
-138.00

-70.00 -150.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 25.50-26.00
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 1.00 Kg/Cm2. Teg : 2.00 Kg/Cm2.
t90 : 1.53 Mnt. t90 : 1.53 Mnt.
Settlement Graph Time t90 : 140.45 Sec. Settlement Graph Time t90 : 140.45 Sec.

-130.00 -226.00

-244.00
-145.00

-262.00
-160.00

-280.00

-175.00

-298.00

-190.00

-316.00

-205.00
-334.00

-220.00
-352.00

-235.00 -370.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 4
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 25.50-26.00
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 4.00 Kg/Cm2.
t90 : 1.52 Mnt. e AND CV GRAPH
Settlement Graph Time t90 : 138.62 Sec.
1.2000

-360.00

1.0000

-380.00

0.8000

-400.00

0.6000

-420.00

0.4000
0.10 1.00 10.00
-440.00

7.00E-03

6.00E-03

5.00E-03
-460.00
4.00E-03

3.00E-03

2.00E-03

1.00E-03
-480.00
0.00E+00
0.10 1.00 10.00

-500.00
Pressura in Kg/Cm2
0 1 2 3 4 5 6 7 8 Max Precompresion : 4.00 Kg/Cm2. Sample Area : 33.18 Cm2
21.4
In Situvoid Ratio eo : 1.093 Sample Height : 2.00 Cm
9.6 38.4 4 9 16 25 36 49 64 Coef of Consol (Cv) : 4.80E-03
Compres Index (Cc) : 0.3808

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 5 Bore No : BH. 5
PT. GLOBAL PARASINDO JAYA Depth : 2.00-2.500 PT. GLOBAL PARASINDO JAYA PERMEABILITY OF Depth : 2.00-2.500
CONSOLIDATION TEST
Test By : Suhendra. CONSOLIDATION TEST Test By : Suhendra.
Rock & Soil Investigation Rock & Soil Investigation
Time LOAD (Kg)
0.825 1.650 3.300 6.600 13.200 25.400 6.600 0.825
0" 0.000 65.900 146.100 244.500 366.800 515.400 504.300
9.6" 6.500 73.900 156.400 256.000 381.100
21.4" 10.800 79.000 161.600 262.600 388.900
38.4" 14.000 83.400 167.800 270.100 398.400
1.0' 16.900 86.800 170.900 274.600 403.200
2.25' 23.400 95.300 182.200 287.300 420.100
4.0' 29.700 102.400 191.200 298.400 433.500 Kg/Cm2 ∆ Cm ∆H ∆H/H MV CV K=MV.CV.YW
9.0' 38.600 113.900 205.400 316.500 455.100 Cm2/Kg Cm2/Sec Cm/Sec
16.0' 45.600 121.000 215.800 329.700 471.900 -3
25.0' 50.100 126.200 223.300 338.800 482.800 (1) (2) (3) (4) (5) (6) (7) = 5.6.10
36.0' 53.800 130.600 229.000 345.500 492.700
49.0' 56.500 135.100 233.000 351.000 500.600
24 Hours 65.900 146.100 244.500 366.800 515.400 504.300 476.200
HS = 0.8999 Z= 1.4860
Moist. Content & Before After Void Ratio & Deg Before After Diameter of 0.25 1.9341 0.0659 0.0341 0.1363 5.29E-03 7.22E-07
Wet Density Test Test ree of Saturation Test Test Ring (Cm) = 6.50 0.50 1.8539 0.0802 0.0433 0.0865 5.14E-03 4.45E-07
Wt Wet Soil & Ring (gr) 287.54 274.99 Tickness (H) Cm 2.000 1.485 1.00 1.7555 0.0984 0.0561 0.0561 4.85E-03 2.72E-07
Wt Ring (gr) 178.90 178.90 H-Hs 2.00 1.6332 0.1223 0.0749 0.0374 4.17E-03 1.56E-07
Wt Wet Soil (gr) 108.64 96.09 eo = --------- 1.222 0.650 Area (A) = 33.18 4.00 1.4846 0.1486 0.1001 0.0250 3.48E-03 8.72E-08
Wt Dry Soil (gr) 77.07 77.07 Hs
Wt Water (gr) 31.57 19.02 Moist. Content (%) 40.96 24.68 3.36E-07
Moist. Content (%) 40.96 24.68 Degree of Saturat 86.48 98.04 Volume = 66.37
Wet Density (gr/cc) 1.637 1.448 Specific Gravity 2.581 2.581
Pressure Dial Original Correct Settlement ∆e e: Average Hight of t 90 CV :
Sample 0.212 Hm2
t 90
Kg/Cm2 Reading Settlement Tool ∆ (Cm) ∆ H/Hs eo-∆e Settlement Hm (Cm) (Second) Cm2/Sec
0.00 0.000 -
0.25 65.900 65.900 - 0.0659 0.0732 1.1492 0.0659 1.9341 149.78 5.29E-03
0.50 146.100 146.100 - 0.1461 0.1624 1.0601 0.1060 1.8940 147.89 5.14E-03
1.00 244.500 244.500 - 0.2445 0.2717 0.9508 0.1953 1.8047 142.30 4.85E-03
2.00 366.800 366.800 - 0.3668 0.4076 0.8149 0.3057 1.6944 146.02 4.17E-03
4.00 515.400 515.400 - 0.5154 0.5727 0.6497 0.4411 1.5589 147.89 3.48E-03
2.00 504.300 504.300 - 0.5043 0.5604 0.6621 0.5099 1.4902
0.25 476.200 476.200 - 0.4762 0.5292 0.6933 0.4903 1.5098 Average : 4.59E-03
Project : Location : Page : Project : Location : Page :
Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai. Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara. Kab. Serdang Bedagai. Prov. Sumatera Utara.
- -
Bore No : BH. 5
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.500
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 0.25 Kg/Cm2. Teg : 0.50 Kg/Cm2.
t90 : 1.58 Mnt. t90 : 1.57 Mnt.
Settlement Graph Time t90 : 149.78 Sec. Settlement Graph Time t90 : 147.89 Sec.

0.00 -56.00

-10.00 -68.00

-20.00 -80.00

-30.00 -92.00

-40.00 -104.00

-50.00 -116.00

-60.00 -128.00

-70.00 -140.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 5
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.500
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 1.00 Kg/Cm2. Teg : 2.00 Kg/Cm2.
t90 : 1.54 Mnt. t90 : 1.56 Mnt.
Settlement Graph Time t90 : 142.30 Sec. Settlement Graph Time t90 : 146.02 Sec.

-145.00 -244.00

-160.00 -262.00

-175.00 -280.00

-190.00 -298.00

-205.00 -316.00

-220.00 -334.00

-235.00 -352.00

-250.00 -370.00
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

21.4 21.4
9.6 38.4 4 9 16 25 36 49 64 9.6 38.4 4 9 16 25 36 49 64

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-
Bore No : BH. 5
PT. GLOBAL PARASINDO JAYA CONSOLIDATION Depth : 2.00-2.500
GRAPH Test by : Suhendra.
Rock & Soil Investigation
Teg : 4.00 Kg/Cm2.
t90 : 1.57 Mnt. e AND CV GRAPH
Settlement Graph Time t90 : 147.89 Sec.
1.2000

-360.00

1.0000
-380.00

0.8000
-400.00

-420.00 0.6000

-440.00
0.4000
0.10 1.00 10.00

-460.00 6.00E-03

5.00E-03

4.00E-03

-480.00 3.00E-03

2.00E-03

1.00E-03

-500.00 0.00E+00
0.10 1.00 10.00

-520.00
Pressura in Kg/Cm2
0 1 2 3 4 5 6 7 8 Max Precompresion : 4.00 Kg/Cm2. Sample Area : 33.18 Cm2
21.4
In Situvoid Ratio eo : 1.222 Sample Height : 2.00 Cm
9.6 38.4 4 9 16 25 36 49 64 Coef of Consol (Cv) : 4.59E-03
Compres Index (Cc) : 0.4109

Project : Location : Page :


Detail Desain Bendung D.I. Bajayu Kab. Serdang Bedagai.
Kab. Serdang Bedagai. Prov. Sumatera Utara.
-

You might also like