Professional Documents
Culture Documents
8d format GG 15.05.2023
8d format GG 15.05.2023
TL:
Segregation Qty(Total) 0 0 0
Defect Qty 0 0 0
Rework Qty 0 0 0
Accepted Qty 0 0 0
Defect - -
Rework - -
Accepted Part Identification (Attach Photo) Defective Part Identification (Attach Photo) Comments
Page 1 of 2
D4: a)ROOT CAUSE ANALYSIS
CAUSES
EFFECTS
Material Environment Method
Environment
SIGNIFICANT /
SL.NO CAUSE VALIDATION IN-SIGNIFICANT REMARKS
DFMEA / Drawing No No
Process flow
No No
diagram/Revision
PFMEA / Revision No No
SOP / Revision No No
Fixture/Tools/Check sheet &
No No
Others
If any other documents
No No
(PDIR, FIRST OFF,etc.)
D7: b)HORIZONTAL DEPLOYMENT - PREVENT RECURRENCE
Part Number Responsibility Target Completed on Part Number Responsibility Target Completed on
EFFECTIVENESS MONITORING
MONTH Status
No of Occurrences
Reviewed by QA : Approved by GM :
Date : Date :
CAR Status Open Close QA Sign :
b)RECOGNIZE THE TEAM
Page 2 of 2
8D CORRECTIVE ACTION REPORT
D0: 8 D ANALYSIS REQUIREMENT: DOC: 8DIN/01/15.05.2023
TL:
Segregation Qty(Total) 0 0 0
Defect Qty 0 0 0
Rework Qty 0 0 0
Accepted Qty 0 0 0
Defect - -
Rework - -
Accepted Part Identification (Attach Photo) Defective Part Identification (Attach Photo) Comments
Page 1 of 2
D4: a)ROOT CAUSE ANALYSIS
CAUSES
EFFECTS
Material Environment Method
Environment
SIGNIFICANT / IN-
SL.NO CAUSE VALIDATION SIGNIFICANT REMARKS
DFMEA / Drawing No No
Process flow
No No
diagram/Revision
PFMEA / Revision No No
SOP / Revision No No
Fixture/Tools/Check sheet &
No No
Others
If any other documents
No No
(PDIR, FIRST OFF,etc.)
D7: b)HORIZONTAL DEPLOYMENT - PREVENT RECURRENCE
Part Number Responsibility Target Completed on Part Number Responsibility Target Completed on
EFFECTIVENESS MONITORING
MONTH Status
No of Occurrences
Reviewed by QA : Approved by GM :
Date : Date :
CAR Status Open Close QA Sign :
b)RECOGNIZE THE TEAM
Page 2 of 2
8D CORRECTIVE ACTION REPORT
D0: 8 D ANALYSIS REQUIREMENT: DOC: 8DEP/GG/00/15.09.2021
TL:
Segregation Qty(Total) 0 0 0
Defect Qty 0 0 0
Rework Qty 0 0 0
Accepted Qty 0 0 0
Defect - -
Rework - -
Accepted Part Identification (Attach Photo) Defective Part Identification (Attach Photo) Comments
Page 1 of 2
D4: a)ROOT CAUSE ANALYSIS
CAUSES
EFFECTS
Material Environment Method
b)VALIDATION FOR THE POSSIBLE CAUSES:
SIGNIFICANT /
SL.NO CAUSE VALIDATION IN-SIGNIFICANT REMARKS
DFMEA / Drawing No No
Process flow
No No
diagram/Revision
PFMEA / Revision No No
SOP / Revision No No
Fixture/Tools/Check sheet &
No No
Others
If any other documents
No No
(PDIR, FIRST OFF,etc.)
D7: b)HORIZONTAL DEPLOYMENT - PREVENT RECURRENCE
Part Number Responsibility Target Completed on Part Number Responsibility Target Completed on
Date : Date :
EFFECTIVENESS MONITORING
MONTH Status
No of Occurrences
Reviewed by QA : Approved by GM :
Date : Date :
CAR Status Open Close QA Sign :
b)RECOGNIZE THE TEAM
Page 2 of 2
Based on complaint CFT
Gearbox spares
marketing 1 1
quality 2 2
production 2 2
design 1 1
assembly 1 0