Construction Materials IV

CMT3700
2024
Major test 1

Ms. Z.N Dube


Concrete Design

SIEVE SIZE INDIVIDUAL INDIVIDUAL CUMMALATIVE PERCENTAGE


PERCENTAGE
(mm) MASS PERCENTAGE RETAINED MATERIAL
RETAINED PASSED ROUNDED
RETAINED (g) (%) (%) OFF (%)
10 0 0 0 100
7.10 0 0 0 100
5.00 13.0 2.6 2.6 97
2.00 41.5 8.4 11.0 89
1.00 99.5 20.1 31.1 69
0.60 160.0 32.3 63.4 37
0.30 86.0 17.3 80.7 19
0.15 43.5 8.8 89.5 11
0.075 30.0 6.0 95.5 4.5

Total mass of mass


496.0 (g)
Concrete Design

Fineness Modulus

FM= (Sum of cum.% retained 5.0 mm to 0.15 mm sieve) / 100

= 278.3/100

= 2.78
Concrete Design

Compacted Bulk Density (coarse aggregate)

COMPACTED
Mass of material + mould (g) 32928

Mass of mould (g) 9559

Mass of material (g) 23369

Volume (𝑚3 ) 0.015

Bulk density (𝑘𝑔/𝑚3 ) 1558


Concrete Design

Bulk Relative Density


𝐶
BRD =
(𝐴−𝐵)

22.5 mm stone

(A) Mass of the saturated surface-dry test sample (g) 3111.7

(B) Mass of the saturated surface-dry test sample in water (g) 1909.1

(C) Mass of the oven dried test sample (g) 3102.6

Relative density 2.58


Concrete Design

Concrete Mix Design Parameters


Stone size 22.5 mm
Target strength 50 MPa (28 days) - given
Cement type CEM I 52.5 N (given)
Target slump 75 mm (given)
Crusher Sand quality Good (given)
W:C Use the provided graph
Type of compaction / vibration Moderate vibration (given)
K Value Refer to the C&CI design method (Table provided)
Cube size 0.150m x 0.150m x 0.150m
Concrete Design

Concrete Mix Design Parameters


Relative Density of CEM I 3.15 (given)
Relative Density of Stone Use the results you obtained.
Relative density of Crusher sand Use 2.63 (If not given, use the results you
obtained)
Fineness Modulus Use the results you obtained (fine sand).
Compacted Bulk Density of stone Use the results you obtained.
Concrete Design
Quantities for 1 𝐦𝟑

Water requirement: Gill Owens, (2013) Fundamentals of Concrete, Cement &


Concrete Institute.

Coarse aggregate size = 22.5 mm


W = 205.3 𝑙 /𝑚3 … interpolation (water requirement table)
Concrete Design
Water Cement Ratio: Gill Owens, (2013) Fundamentals of
Concrete, Cement & Concrete Institute Cement Content
𝐶 = 𝑊 ÷ 𝑊/𝐶
= 205.3 ÷ 0.46
= 446.3 𝑘𝑔/𝑚3
Concrete Design

Stone content
𝑆𝑡 = 𝐶𝐵𝐷𝑆𝑡 (𝐾 − 0.1𝐹𝑀)
= 1558 (1.03 – 0.1 (2.78)
= 1171. 6 𝑘𝑔/𝑚3

K Value : Gill Owens, (2013) Fundamentals of Concrete, Cement & Concrete Institute
Concrete Design

Sand content

Note: M and D refer respectively to mass and particle relative density.


Subscripts c, s, a and w refer respectively to cement, sand, stone and water

𝑀𝑐 𝑀𝑎 𝑀𝑤
𝑀𝑠 = 𝐷𝑠 × 1000 1 − − −
𝐷𝑐 × 1000 𝐷𝑎 × 1000 1 × 1000
446.3 1171. 6 205.3
= 2.63 × 1000 1 − − −
3.15 × 1000 2.58 × 1000 1 × 1000
= 523.1 𝑘𝑔/𝑚3
Concrete Design
Design for 6 concrete cubes (0.150 x 0.150 x 0.150 m)

Cube size (𝑚3 ) = 0.150 x 0.150 x 0.150


= 0.003375 𝑚3

Equivalent of 6 cubes required (𝑚3 ) = 0.003375 x 6


= 0.02025 𝑚3

Required quantity of material for 6 cubes


Water = 205.3 x 0.02025 = 4.16 𝒍
Cement = 446.3 x 0.02025 = 9.04 kg
Stone = 1171.6 x 0.02025 = 23.72 kg
Sand = 523.1 x 0.02025 = 10.59 kg