Risk Assessment Report

Simple & Obvious Assessment

Task Name
Products Used ICP
LEADmixed standard
MONOXIDE (WEIHAISolution
ABOKEM CO LTD)

Risk Ranking:

01 Task Details
Task Name ICP Mixed standard solution
Task Description Determination of multi-elements in Cu concentrate
Frequency Daily Duration 3 hrs
Assessors Munkh-Erdene Erdene-Ochir, Anujin Munkhnasan
Operators Zaya Gankhuyag, Jargalmaa Gankhuyag, Lkhagvajargal Bumba-Erdene, Tuul Sukhbaatar
Locations of Use AAS room at RC Inspection LLC
Date Assessed 10/31/2023 Next Review Date 10/31/2024
Risk Owner Khos-erdene Khishigbayar (OT), Bayarjargal Bayartsengel (RC), Tsogt Tsengel (RC)

02 Products
Product Name Multi-Element
LEAD MONOXIDE ICP - Standard Solution IV ROTI®Star 23 elements in 2 % HNO₃ - 1000 mg/L
Manufacturer CARL
WEIHAI ROTH GMBH
ABOKEM CO + LTD
CO.KG
SDS Date 15-Jul-2023
10-Oct-2022 * at time of assessment
Quantity 600 ml Concentration 0.01%
Storage Location RC Inspection LLC
GHS Overview DANGER

03 Risks
Likelihoods Rare • Unlikely • Possible • Likely • Almost Certain
Consequences Low • Minor • Moderate • Major • Critical
Hazard Statement Likelihood Consequence
May be corrosive
damage to metals
fertility or the unborn child Unlikely Low
damage
Causes skin to organs through prolonged or repeated exposure
irritation Possible Minor
Causes serious
May cause harmeye irritation children
to breast-fed Possible Moderate
May cause of
Suspected cancer
causingby inhalation
cancer Unlikely Major
May damage fertility. May
Very toxic to aquatic life with damage the unborn
long lasting child (if exposed)
effects Unlikely Major
Harmful if inhaled
Harmful if swallowed

RIO TINTO OYU TOLGOI Page 1 of 3


Date Printed: 29-Oct-2023
Risk Assessment Report
Simple & Obvious Assessment

Task Name

04 Controls
Control name Category Effectiveness (%)
Good ventilation system at AAS room Engineering 95%
Wear nitrile, protective gloves PPE 85%
Wear safety glasses with side shields PPE 85%
Place safety Showers and eyewash stations Engineering 90%

05 Analysis
Risk Matrix
Consequences
Low Minor Moderate Major Critical
Likelihood 2 4 6 8 10
Almost Certain Medium High High Very High Very High
10 20 40 60 80 100
Likely Medium Medium High High Very High
8 16 32 48 64 80
Possible Low Medium High High High
6 12 24 36 48 60
Unlikely Low Low Medium Medium High
4 8 16 24 32 40
Rare Low Low Medium Medium High
2 4 8 12 16 20

Conclusion Critical (Exceeds the risk acceptance threshold and need urgent and immediatiate attention) | High
(Exceeds the risk acceptance threshold and requires proactive mamangement) | Low (Risk is
negligible) | Moderate (Risk is present, and required active management)
Recommendations / Medium risk
Actions Required All critical controls for the risk will be reflected in the SWP for performing ICP measurement

Actions Completed Good ventilation system at AAS room, safety glasses, nitrile gloves, safety Showers and eyewash stations

RIO TINTO OYU TOLGOI Page 2 of 3


Date Printed: 29-Oct-2023
Risk Assessment Report
Simple & Obvious Assessment

Task Name

06 Authorisation
RISK ASSESSMENT NOT YET APPROVED
Authorisation Status Approved | Rejected
Authorised By Chimedyudon Tsogdelger
Signature

Position Superintendent A&QC


Date Authorised 10/31/23
Comments

RIO TINTO OYU TOLGOI Page 3 of 3


Date Printed: 29-Oct-2023