Professional Documents
Culture Documents
4522-MM-ED-416-001_R03 GA of CCTV Cameras
4522-MM-ED-416-001_R03 GA of CCTV Cameras
A A
LEGEND
Blue = New Camera
CCTV
Orange = Existing Camera
Green = New Safety Camera
86 F
RCC
025
86 M 86 M 86 M
B RCC
003 86 M
RCC
022
RCC
021
B
CCTV
RCC System Code
W/H Top 001 86 M 86 M
47700 A/B 86
RCC
M
86 F RCC RCC F = Fixed
86 M RCC M0 3 5. 6 T 0 1 L WS
78°
002
50°
25°
015
0°
P-GEV 20 SM-WD
373152
44700 A/B 005 RCC RCC
P-GEV 20 SM-WD
373152
373152
P-GEV 20 SM-WD
P-GEV 20 SM-WD
373152
CCTV
CCTV
86 M
HATCH HATCH HATCH
D Deck
41400 A/B
RCC 86 F
004 L03 bis
017 RCC Tag Number
ELECTRIC CARGO 86 M 023 STARBOARD
HATCH
C Deck MOTOR MACHINERY L73
RCC
38250 A/B ROOM ROOM
CCTV
L04
L01
L02
DECK STORE 016 CCTV
B Deck
C
I
P
45
45
35100 A/B
NO.4 TRUNK NO.3 TRUNK CCTV
NO.2 TRUNK NO.1 TRUNK
CCTV
CCTV
A Deck
31700 A/B
CAMERA INDEX
CCTV
CCTV
)
&S
86 M BOSUN STORE
.(P
) REGAS
RCC (S
T. 86-RCC-002 Moveable Foremast stb
.T
2
.B
R. SWBD RM.
W
019 TO
(P E/R
.S NO.4 CARGO TANK
.O NO.3 CARGO TANK NO.2 CARGO TANK NO.1 CARGO TANK C.L.
3 86-RCC-003 Moveable Aft mooring
NO.5 COFFERDAM
2ND Deck
NO.4 COFFERDAM
.D
NO.1 COFFERDAM
20575 A/B M
T.
NO.3 COFFERDAM
NO.2 COFFERDAM
CCTV
R.
M.G.O.
M.D.O.
4 86-RCC-004 Moveable Bridge Wing stbd
TO
SERV. SERV.
S)
)
B.W.
.S
&S
P&
.T. (C)
.O
.T.(
.T
GEAR ROOM
86-RCC-005 Moveable Bridge Wing Port
.(C)
.G
F.
W
5
D.W
M
) )
R.T
C/D (S)
S) &S
STOR
3RD Deck
& .(P ) &S
14730 A/B .(P B.T
&S .(P 6 86-RCC-006 Fixed Engine Room nr.1
STO
EM'CY L.S.
B.T .(P .T
A.P.T. EXIT H.F.O. H.F.O. H.F.O. L.S. H.F.O. . W. . B.T .B FWD. PUMP F.P.T.
S.L.W.L. EM'CY FIRE TRUNK SETT. 4W .3 2W
S.L.W.L.
.
W
SERV. SETT. . NO 86-RCC-007 Fixed Engine Room nr.2
H.F.O
(C, W.B.T.) SERV. (C, W.B.T.)
PUMP SPACE
NO . RM. 7
.O.
T (S) T (S) T (S) T (S)
NO .1
NO
H.F
4TH Deck
10555 A/B
8 86-RCC-008 Fixed Purifier Room nr.1
NO.2
&S)
ENGINE ROOM
NO.1
F.O.
.T.(P
OVER
FLOW
T (S)
9 86-RCC-009 Fixed Purifier Room nr.2
W.B
SIDE
TANG
ENT LI 10 86-RCC-010 Fixed Emergency Generator Room
FWD
Floor NE
4400 A/B S/T C.W.T.(C)
D B.L.
10 20 30 40 50 60 70 80 90 100 110 118 120 130 140 150 160 170
B.L. 12 86-RCC-012 . Incinerator Upper Deck D
13 86-RCC-013 - Aux. Boiler
F.S. 800 F.S. 3440 F.S. 3440 F.S. 3440 F.S. 800
FR 92-215 14 86-RCC-014 - I.G.G.
13600 39200 2450 44720 3445 2900 44720 3445 2900 44720 3445 2700 26800 3445 2700 10400 19200 10310
A.P. F.P. 15 86-RCC-015 Moveable Foremast Port
(13.600m) (52.800m) (103.415m) (154.480m) (205.545m) (238.390m) (251.490m) (270.690m)
16 86-RCC-016 Fixed Fwd Pump Room
17 86-RCC-017 Fixed STS Manifold Port
18 86-RCC-018 Moveable Aft Boiler
19 86-RCC-019 Moveable Gangway
20 86-RCC-020 Moveable HP-manifold stbd
21 86-RCC-021 Moveable Regas Crane
22 86-RCC-022 Moveable Regas Mast No.1
23 86-RCC-023 Fixed Safety Camera foremast FWD
E 24 86-RCC-024 Fixed Safety Camera Manifold Port E
86 M 25 86-RCC-025 Fixed Safety Camera
RCC
86 F 86 F 86 M 86 M
86 F 005 RCC RCC RCC RCC
RCC
017 024 022 021
025
86 M
RCC
003
CCTV UPPER DECK PLAN
DN CCTV
CCTV
LAYDOWN
AREA
N
O CK
.2
F. .LO WORKER'S CABIN CREWS'
W (SUEZ CREW; 6P) CHANGING
& FIRE CONTROL
O
ROOM
C
86 M .T
K. 86 F
RCC RCC
UP
No.2 CARGO
O
OIL POLLUTION
C
UP ER SUPPLY EQUIPMENT LOCKER SAFETY LOCKER SWBD ROOM
SLEWING
RIGHT
LEFT
LUFFING
DOWN
UP
STORE
HOISTING
DOWN
UP
OM
UP
GARBAGE
RO
LANDING STORE
SPACE LIFT
D
F F
NO.3 OFFICERS' TRUNK
86 M
WB
PUB. CHANGING ROOM DN TO
T. ENGINE RM
RCC
SS
CCTV
GA
CCTV
O
002
C
CCTV
RE
AIR HANDLING UNIT ROOM UP
DN
CCTV
1PN
INCINERATOR
GENERAL NOTES
AUX. N
BOILER ROOM PA
NIO
C.L. CCTV M
C.L.
CCTV
NO.2 DN CO
CCTV
UP FRONT
TV
A.P. UP 70
CC
AUX. DN
BOILER DN FWD. PUMP ROOM
NO.1
F.P.
CRANE
RIGHT
LEFT
DOWN
JIB
UP
DOWN
HOOK
UP
P
P
B
UP No.1 CARGO
UP SWBD ROOM
DN UP
C
O
C.F.W.
EXP. TK
ER SUPPLY
FANS NO.1 VENT FOAM ROOM
(3.8M3)
DECK STORE
CABLE
TRUNK 1. CCTV Layout developed for conversion shipyard information.
FAN ROOM FISH MEAT L03
NO.2
UP
)
L52
LANDING
L54
L72
(U
L56
L58
WORKSHOP ROOM
LOBBY
R O
H.
NO.1
DECK
LUFFINGUP HOISTINGUP
DOWN
DOWN
SLEWING
RIGHT
LEFT
ELEC. MOTOR RM.
ED AT SEA
AC
OXY. STORE
O BE KEPT LOS C
LAYDOWN
K.
UP ROOM VEGETABLE AREA
M COMPRESSOR CL MOTOR CL
HATCH
.T O
C
)
UP
M(U
RG
O
.W
F
information and requirements.
DAIRY
.1 CA
OO
O L04
L73
N L01
RR
L57
L81
L02 L55L53
CCTV
. L51
M
L71
K 86
TO
.T
.W RCC
.MO
CCTV
D TO BE KEPT CLOS ED AT SEA
C/MACH. RM.
.1
NO
2. Final location of equipment to be made at site to provide
EC
C/MACH. RM.
015
G G
TO BE KEPT CLOSED AT SEA
EL
C
O
OC
CCTV
C
O
CCTV
86 M 86 M 86 M
25
RCC RCC RCC 3. Consult vendor manuals for correct installation methodes for
00
86 M
019 004 001 RCC
020
detectors.
4. Camera 6 and Camera 7 to be moved 1-3 meters.
H H
J J
PURIFIER BALLAST TK (P)
RCC 19 ROOM
19
E.R. WATER 16
16 BALLAST TK (P) UP
010 12 M.G.O.
CC
UP M.G.O.
TV
TRUNK C.G.L
TANK BUFFER
CC
ELECTRIC
GALLEY CREW'S UP DN EQUIPMENT ROOM
NO.5 COFFERDAM
LIFTING BEAM (2 TON)
DUTY
MAIN G.E. MAIN G.E. MAIN GE NO.3 G
FRESH AIR MESS ROOM
IN
IN
OUT
A.P.TK SPACE
UP DN TRANSFORMER
EM'CY
LANDING
LIFTING SPACE
UP C.L. C.L. EXIT NO.3
SPACE
UP DN LIFTING
FR16 FR25 FR30 DN FR35
C.L. FR50 FR55 FR60 FR65
DN
AIR FR43 45 EM'CY SPACE UP
CHAMBER EM'CY UPEXIT
PIPE/DUCT FIRE PUMP EM'CY DN DN
TRUNK
SPACE FIRE PUMP DN LANDING
OFFICERS' SPACE SPACE
MAIN G.E. DUTY AUX. BOILER WATER
CIRC. PUMPS
LIFTING
DN UP
CABLE
K K
GCU FAN GCU FAN TRUNK UP PROPULSION
NO.2 NO.1 NO.1 MAIN GENERATOR UP TRANSFORMER
ENGINE ROOM UP NO.1 MAIN GENERATOR NO.1 NO.2
HOSPITAL
ENGINE ROOM TRANSFORMER
SWIMMING NO.1CONVERTER CCTV
H.F.O. H.F.O. L.S. H.F.O. L.S. H.F.O. STOR. TK L.O. SETT. L.O. SETT. L.O. STOR. L.O. STOR.
CC
DN
16
NO.1
PURIFIER
SERV. TK SETT. TK SERV. TK SETT. TK 8 WATER TK TK TK TK TK M.D.O.
SERV.TK
M.D.O.
STOR. TK
03 ISSUED FOR CONSTRUCTION 02.11.2023 APN AHH EN
19 ROOM 12 21
23 NO.4 WATER
16 02 ISSUED FOR INFORMATION 19.09.2023 APN VJN EN
27 ER WATER
BALLAST TK (S) 19 ER WATER NO.4 WATER
BALLAST TK (S) 23
31 BALLAST TK (S) BALLAST TK (S)
35 39 43 66 27 31 01 ISSUED FOR REVIEW 29.06.2023 VJN APN EN
35 39 43 66
86 F REV. No. REVISION DATE BY CHECKED APPROVED
RCC
86 F PROJECT
RCC 006
008
Glycol Water Pumps 1 for MSO
L Compressor Cooling BW Singapore FSRU L
Glycol Water Pumps 2 for MSO
Compressor Cooling TITLE/SUBTITLE CLIENT
GA of CCTV cameras
General Arrangement CLIENT DOC. No.
1/7 03 A1 NTS
M 4522-MM-ED-416-001 THIS DRAWING IS THE PROPERTY OF MOSS MARITIME AS.
M
IT IS NOT TO BE DISCLOSED, COPIED OR IN ANY OTHER WAY
PROJ. No. - SUB SUPPL. - DISCIPLINE & DOC TYPE - SFI No. - SERIAL No USED WITHOUT MOSS MARITIME'S WRITTEN PERMISSION.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PLOTTED: 02.11.2023 - 09:43
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Harzardous area
A A
R4
R3 .5M
M
R3M
R3
M
.5M R4
R4 .5M
C C
HIGH PRESSURE
MANIFOLD AREA
Harzardous area
HIGH PRESSURE
MANIFOLD AREA
D D
86 M
RCC R4
.5M
R3
M
020
E E
2.4M
F F
GENERAL NOTES
1. CCTV Layout developed for conversion shipyard information.
To be developed based on site inspection, test and to vendor
CCTV
NO.2 TRUNK 2.
information and requirements.
Final location of equipment to be made at site to provide
G G
optimum operational coverage and access for maintence.
3. Consult vendor manuals for correct installation methodes for
detectors.
H H
J J
K K
PROJECT
L BW Singapore FSRU L
TITLE/SUBTITLE CLIENT
GA of CCTV cameras
H.P. Manifold
CLIENT DOC. No.
2/7 03 A1 NTS
M 4522-MM-ED-416-001 THIS DRAWING IS THE PROPERTY OF MOSS MARITIME AS.
M
IT IS NOT TO BE DISCLOSED, COPIED OR IN ANY OTHER WAY
PROJ. No. - SUB SUPPL. - DISCIPLINE & DOC TYPE - SFI No. - SERIAL No USED WITHOUT MOSS MARITIME'S WRITTEN PERMISSION.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PLOTTED: 02.11.2023 - 09:43
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Harzardous area
A STS MANIFOLD AREA A
C C
Harzardous area
024 M
R3
.5M
R4
86 F
E
RCC E
017
2.4M
F
DECK STORE F
GENERAL NOTES
H H
J J
K K
PROJECT
L BW Singapore FSRU L
TITLE/SUBTITLE CLIENT
GA of CCTV cameras
STS Manifold Port CLIENT DOC. No.
3/7 03 A1 NTS
M 4522-MM-ED-416-001 THIS DRAWING IS THE PROPERTY OF MOSS MARITIME AS.
M
IT IS NOT TO BE DISCLOSED, COPIED OR IN ANY OTHER WAY
PROJ. No. - SUB SUPPL. - DISCIPLINE & DOC TYPE - SFI No. - SERIAL No USED WITHOUT MOSS MARITIME'S WRITTEN PERMISSION.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PLOTTED: 02.11.2023 - 09:44
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A 86 M A
2ND DECK PLAN UPPER DECK PLAN RCC
GENERAL NOTES
86 F 005
RCC 1. CCTV Layout developed for conversion shipyard information.
To be developed based on site inspection, test and to vendor
B B
025 information and requirements.
2. Final location of equipment to be made at site to provide
optimum operational coverage and access for maintence.
86 M
RCC 3. Consult vendor manuals for correct installation methodes for
detectors.
CCTV
003
C C
DN
LAYDOWN
AREA
N CK
O
.2
F. .LO WORKER'S CABIN CREWS'
D W (SUEZ CREW; 6P) CHANGING
D
STORE UP
GARBAGE
LANDING STORE
SPACE
E NO.3 OFFICERS'
LIFT E
PUB. TRUNK
CHANGING ROOM DN TO
T. ENGINE RM
CCTV
CCTV
F F
AUX.
INCINERATOR
BOILER ROOM
C.L. UP NO.2 DN
A.P. 10 UP 20 AUX. DN 30 40 50 60
BOILER DN
NO.1
UP No.1 CARGO
G UP SWBD ROOM G
DN UP
C.F.W.
EXP. TK
(3.8M3)
CABLE
ER SUPPLY TRUNK
DECK STORE
FANS NO.1 VENT FOAM ROOM
FAN ROOM FISH MEAT
NO.2
UP
H LANDING H
SPACE C.G.L
DRY PROV.
BOUNS'S ACE. STORE
UP LOBBY
NO.1 WORKSHOP ROOM
OXY.
K . UP ROOM VEGETABLE
.T
W
F. DAIRY
.1
O
J N J
TK.
.
W
D.
O .1
N
OC
CCTV
K K
CCTV
M
PROJECT
86 86 M
L RCC RCC BW Singapore FSRU L
GA of CCTV cameras
CLIENT
4/7 03 A1 NTS
M 4522-MM-ED-416-001 THIS DRAWING IS THE PROPERTY OF MOSS MARITIME AS.
M
IT IS NOT TO BE DISCLOSED, COPIED OR IN ANY OTHER WAY
PROJ. No. - SUB SUPPL. - DISCIPLINE & DOC TYPE - SFI No. - SERIAL No USED WITHOUT MOSS MARITIME'S WRITTEN PERMISSION.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PLOTTED: 02.11.2023 - 09:43
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A A
GENERAL NOTES
1. CCTV Layout developed for conversion shipyard information.
B
86 M 86 M To be developed based on site inspection, test and to vendor
B
RCC RCC information and requirements.
78°
002
50°
25°
015
0°
C C
P-GEV 20 SM-WD
373152
P-GEV 20 SM-WD
373152
373152
P-GEV 20 SM-WD
P-GEV 20 SM-WD
373152
CCTV
86
RCC
F PROFILE
86
RCC
M 023 STARBOARD
D HOLD D
016 CCTV
NO.1 TRUNK
E E
BOSUN STORE
REGAS
SWBD RM.
F F
NO.1 CARGO TANK C.L.
NO.1 COFFERDAM
CCTV
B.W.
C)
)
R.T. (
T.(C
S)
G G
OR.
&
. STO
. (P
.T
. ST
NO
1 H.
NO.2
&S)
NO.
.T.(P
H H
W.B
FWD
B.L.
J J
118 120 130 140 150 160 170
F.S. 800
PROJECT
L BW Singapore FSRU L
TITLE/SUBTITLE CLIENT
GA of CCTV cameras
FW PUMP ROOM CLIENT DOC. No.
5/7 03 A1 NTS
M 4522-MM-ED-416-001 THIS DRAWING IS THE PROPERTY OF MOSS MARITIME AS.
M
IT IS NOT TO BE DISCLOSED, COPIED OR IN ANY OTHER WAY
PROJ. No. - SUB SUPPL. - DISCIPLINE & DOC TYPE - SFI No. - SERIAL No USED WITHOUT MOSS MARITIME'S WRITTEN PERMISSION.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PLOTTED: 02.11.2023 - 09:43
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Harzardous area
A A
2ND DECK WEATHER TIGHT STEEL DOOR
FOR CARGO MACH. RM.
R3
M
70 71 R1 75 79 80 CL
.5M
ESCAPE HATCH
VENT MAST
R3M
R4.5M
M.
FOR ELECT. MOTOR RM.
B B
RM
R
Y
OR
BOLTED TYPE HATCH
R
NE
MECH. EXHAUST VENT
OT
HI
FOR CARGO MACH. RM.
AC
.M
M R3M
CT
R1.5M
O
RG
E
WEATHER TIGHT 2.3M
CA
EL
STEEL DOOR FOR ESCAPE HATCH
ELECT. MOTOR RM.
O C
O C
R1
SIDE SHELL
R3
.5M
M
M
.5
R1
M
R3
MECH. SUPP. VENT NAT. SUPP. VENT
FOR ELECT. MOTOR RM. FOR CARGO MACH. RM.
Harzardous area
L03
U)
L52
L54
L72
L56
( L58
M
D O
O L05
D
R
H. DECK
O BE KEPT LOS C
LAYDOWN
AREA
M COMPRESSOR CL MOTOR CL
HATCH
O
)
M(U
RG
CA
OO
HATCH HATCH HATCH
L04
L73
L01
R
L57
L81
L53
L55
OR
L02
L51
L71
OT
CCTV
TO BE KEPT CLOS ED AT SEA
C.M
C/MACH. RM.
E
C/MACH. RM.
TO BE KEPT CLOSED AT SEA
EL
C
O
ROOMNO.4 TRUNK
r:2
86 M
25
RCC
00
001
F F
GENERAL NOTES
1. CCTV Layout developed for conversion shipyard information.
3RD DECK 86
RCC
F
To be developed based on site inspection, test and to vendor
information and requirements.
N2
BUFFER
UP NO.2
TANK TRANSFORMER
NO.2 MAIN GENERATOR CCTV ROOM
ENGINE ROOM
NO.5 COFFERDAM
J J
UP LANDING
LANDING SPACE PROPULSION
UP
SPACE
DN TRANSFORMER
EM'CY
NO.3
C.L. EXIT DN LIFTING
SPACE UP
EM'CY DN DN
FIRE PUMP DN LANDING
SPACE SPACE
AUX. BOILER WATER
CIRC. PUMPS
UP PROPULSION
TRANSFORMER
NO.1 MAIN GENERATOR NO.1 NO.2
ENGINE ROOM TRANSFORMER
K CCTV
ROOM K
SEWAGE/ UP
GREY
NO.1 SOOT ATER
DRAIN TK (22M3) UP WOLDING
H
NO.1 MAIN G.E. TK
NO.1 FRESH GAS VALVE DN DN 03 ISSUED FOR CONSTRUCTION 02.11.2023 APN AHH EN
WATER TK UP PROPULSION
UNIT ROOM
UP TRANSFORMER 02 ISSUED FOR INFORMATION 19.09.2023 APN VJN EN
DN NO.1
UP 01 ISSUED FOR REVIEW 29.06.2023 VJN APN EN
UP
REV. No. REVISION DATE BY CHECKED APPROVED
REDUCTION MAIN G.E. MAIN G.E. MAIN G.E. MAIN G.E.
NO.1 GEAR L.O. LOW TBN HIGH TBN LOW TBN HIGH TBN PROJECT
DISTILLED STOR. TK L.O. SETT. L.O. SETT. L.O. STOR. L.O. STOR.
WATER TK TK TK TK TK M.D.O. M.D.O.
L
8
12 21
SERV.TK STOR. TK BW Singapore FSRU L
16
19 ER WATER NO.4 WATER TITLE/SUBTITLE CLIENT
23 BALLAST TK (S) BALLAST TK (S)
27 31 GA of CCTV cameras
35 39 43 66
MSO Compressor skid &
CLIENT DOC. No.
86 F 3RD Deck
RCC DRAWING No. SHEET REVISION FORMAT SCALE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PLOTTED: 02.11.2023 - 09:43
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A A
ACC. A-DECK GENERAL NOTES
1. CCTV Layout developed for conversion shipyard information. To be
developed based on site inspection, test and to vendor information and
B requirements. B
86 F 2. Final location of equipment to be made at site to provide optimum
RCC
010 operational coverage and access for maintence.
DN 3. Consult vendor manuals for correct installation methodes for detectors.
23 DN 35 UP
DN
CREW'S MESS ROOM CREW'S RECREATION ROOM GYMNASIUM
16
C DN
C
NO.2 VENT
FAN ROOM EM'CY UP
GENERATOR
FRESH AIR ROOM
INTAKE EM'CY
D.O. LIFT
TV
TRUNK C.G.L
TANK
CC
COFFERDAM
GCU FAN GCU FAN
NO.3 UP
NO.4 PUB.
T.
ELECTRIC
GALLEY CREW'S UP DN EQUIPMENT ROOM
OFFICERS'
MAIN G.E. DUTY
MESS ROOM
LIFTING
SILENCERS
SPACE
DN
CABLE
GCU FAN GCU FAN TRUNK
NO.2 NO.1
HOSPITAL
SWIMMING
OFFICERS' MESS ROOM
E FRESH AIR
INTAKE
POOL T/B
E
DISPEN
-SARY
CO2
ROOM
NO.1 VENT UP
DN FAN ROOM OFFICERS'
RECREATION ROOM
16 AWNING
AREA
DN
23 DN 31 35 UP
DN
F F
4TH DECK
G G
4TH DECK PLAN
Heat Exchanger 1 for MSO
86 F
RCC
009
Compressor Cooling
31 35 39 43 47 58 66 Electrical Heater for
27 NO.4 WATER
23 NO.2
PURIFIER
Glycol Water
BALLAST TK (P)
19 ROOM
E.R. WATER
16 BALLAST TK (P)
CC
TV
H UP
H
NO.2 PURIFIER SULDGE TK 218 (M3).
A.P.TK DN
UP
UP
UP UP
UP
UP
MAIN GE NO.3 G
IN
IN
L.O. COOLER UP UP
OUT
OUT
A.P.TK
LANDING
LIFTING SPACE
C.L.
J J
SPACE
DN UP
EM'CY UPEM'CY
EXIT
FIRE PUMP
SPACE
UP
NO.1CONVERTER
MAIN G.E. NO.1/2
ROOM
M.G.O. CHILLER UNIT
UP
UP
CASCADE UP DN
A.P.TK UP TK (5.9 M3)
NO.1 PURIFIER SULDGE TK (21.8 M3)
K K
V
23 NO.4 WATER
ER WATER
27 BALLAST TK (S) BALLAST TK (S)
31 35 39 43 66
03 ISSUED FOR CONSTRUCTION 02.11.2023 APN AHH EN
02 ISSUED FOR INFORMATION 19.09.2023 APN VJN EN
86 F 01 ISSUED FOR REVIEW 29.06.2023 VJN APN EN
RCC
REV. No. REVISION DATE BY CHECKED APPROVED
008
Glycol Water Pumps 1 for MSO PROJECT
L
Compressor Cooling BW Singapore FSRU L
Glycol Water Pumps 2 for MSO TITLE/SUBTITLE CLIENT
7/7 03 A1 NTS
M 4522-MM-ED-416-001 THIS DRAWING IS THE PROPERTY OF MOSS MARITIME AS.
M
IT IS NOT TO BE DISCLOSED, COPIED OR IN ANY OTHER WAY
PROJ. No. - SUB SUPPL. - DISCIPLINE & DOC TYPE - SFI No. - SERIAL No USED WITHOUT MOSS MARITIME'S WRITTEN PERMISSION.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PLOTTED: 02.11.2023 - 09:44