Professional Documents
Culture Documents
VP1-C-L1-I-ETA-30098 Rev.ab0 Specification and Drawing for BAHS Control Panel
VP1-C-L1-I-ETA-30098 Rev.ab0 Specification and Drawing for BAHS Control Panel
DOCUMENT TITLE
Specification and Drawing for BAHS Control Panel
相生技設 24. Feb Revised as per owner’s comment and design progress.
C S.Funaki K.Hiramoto H.Takeuchi T.Nagasawa
2021 Page 6-8, 10-15, 21 are revised.
IPC 工事部
22. Dec. Revised as per owner’s comment.
B S.Funaki K.Hiramoto H.Takeuchi T.Nagasawa
IPC 電計部 1 2020 All pages were revised.
現地(JEL) 1 5. Nov.
A Issue for customer K.H K.Hiramoto H.Takeuchi T.Nagasawa
2020
9. Sep.
0 First issue for internal use K.Hiramoto H.Takeuchi T.Nagasawa
2020
NO DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED
SCALE
- Van Phong 1
BOT Thermal Power Plant Project
1ST ANGLE
PROJECTION
VP1
メーカ Specification and Drawing
控 3RD ANGLE for BAHS Control Panel
合 計 15 PROJECTION
DRAWING NO REV
Plant Engineering Dept.
Engineering Center JOB NO CODE NO J
5411-F37
Carbon Solution Business Unit FF10-E20 1
Resources, Energy & Environment Business Area 5411-F38 30
A4表紙A_0
REVISED HISTORY
19. Jul
J As-Built
2023
Reference Drawings
Schematic Diagram
5 FF10-E30 VP1-C-L1-I-ETA-30115
for Bottom Ash Handling System
Operation Philosophy
6 FF10-C01 VP1-C-L1-I-ETA-30103
for Bottom Ash Handling System
(
DRAWING NO 仕
様
JOB NO CODE NO 書
用
5411-F37 FF10-E20 紙
)
A4仕様書用紙_0
(3 / 30)
AS BUILT
(4 / 30)
AS BUILT
(5 / 30)
AS BUILT
(6 / 30)
AS BUILT
(7 / 30)
AS BUILT
(8 / 30)
AS BUILT
(9 / 30)
AS BUILT
(10 / 30)
AS BUILT
(11 / 30)
AS BUILT
(12 / 30)
AS BUILT
(13 / 30)
AS BUILT
(14 / 30)
AS BUILT
(15 / 30)
AS BUILT
(16 / 30)
AS BUILT
(17 / 30)
AS BUILT
(18 / 30)
AS BUILT
(19 / 30)
AS BUILT
(20 / 30)
AS BUILT
(21 / 30)
AS BUILT
(22 / 30)
AS BUILT
(23 / 30)
AS BUILT
(24 / 30)
AS BUILT
(25 / 30)
AS BUILT
(26 / 30)
AS BUILT
(27 / 30)
AS BUILT
(28 / 30)
AS BUILT
(29 / 30)
AS BUILT
(30 / 30)
AS BUILT