Download as pdf or txt
Download as pdf or txt
You are on page 1of 32

As-Built

AB0 19.Jul 2023 As-Built


T.Nagasawa K.Hiramoto

REV DATE DESCRIPTION Approved Checked Prepared


OWNER
VAN PHONG POWER COMPANY LIMITED
PROJECT
Van Phong 1 BOT Thermal Power Plant Project
Status
OWNER’S ENGINEER □Approved
□Approved with Comment
AFRY Switzerland Ltd. □Not Approved
□Reviewed
□Reviewed with Comment
EPC CONTRACTORS
IHI–TESSC–CTCI–DHI CONSORTIUM

PROJECT DOCUMENT No REV


VP1-C-L1-I-ETA-30098 AB0

DOCUMENT TITLE
Specification and Drawing for BAHS Control Panel

EPC EPC DOCUMENT No. REV


IHI Corporation FF10-E20 J
注 意 CAUTION
本図書は株式会社IHIの秘密情報を含んでいます。 THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF
本図書について以下のことをIHIの書面による事前承諾なく行うことを IHI CORPORATION.
禁じます。 THE DOCUMENT ALWAYS REQUIRES PRIOR WRITTEN CONSENT OF IHI FOR
(1) 複製(方法を問わず) (1) ITS REPRODUCTION BY ANY MEANS,
(2) 第三者への開示 (2) ITS DISCLOSURE TO A THIRD PARTY,OR
(3) 供与目的以外への使用 (3) ITS USE FOR ANY PURPOSE OTHER THAN THOSE FOR WHICH IT IS SUPPLIED.

For Unit 1 & Unit 2 As-Built


配布先
Owner 1
TSB 1
CTCI 1 Reference Drawing List
DHI 1
No. Reference Drawing Name Reference Drawing No. (IHI Drawing No.)
CS 品保部 1 Schematic Diagram for Bottom Ash Handling VP1-C-L1-I-ETA-30115 (FF10E30)
CSPJ 統括部
CSPJ プロ部 System
CS 基設 1
2 Boiler Sequence Control Logic Diagram for VP1-C-L1-I-ETA-30020 (FF10C10)
CS 燃部 1
CS 制電部 1 Bottom Ash Handling System
CS 主機 1
3 Boiler Sequence Control Logic Diagram VP1-C-L1-I-ETA-30075 (K710427)
CS 鉄配部 1
(配管) (BAH System Monitoring)
(鉄構)
CS 機器部
CS 品管部 1 9. Sep Revised as per vendor’s shop test result.
CS 運技 1
F T.N A.Watanabe T.Nagasawa
2021 Page 7-12, 22, 29 are revised.
CS 建管 10. Aug Revised as per design progress.
CS 建エンジ E S.Funaki K.Hiramoto H.Takeuchi T.Nagasawa
CS 建計工 1 2021 Page 7, 8, 10-18, 22, 23, 27, 30 are revised.

24. May Revised as per owner’s comment and design progress.


エネ調管 1
D S.Funaki K.Hiramoto H.Takeuchi T.Nagasawa
2021 Page 4, 7-18, 21-23, 25-27 are revised.

相生技設 24. Feb Revised as per owner’s comment and design progress.
C S.Funaki K.Hiramoto H.Takeuchi T.Nagasawa
2021 Page 6-8, 10-15, 21 are revised.

IPC 工事部
22. Dec. Revised as per owner’s comment.
B S.Funaki K.Hiramoto H.Takeuchi T.Nagasawa
IPC 電計部 1 2020 All pages were revised.
現地(JEL) 1 5. Nov.
A Issue for customer K.H K.Hiramoto H.Takeuchi T.Nagasawa
2020

9. Sep.
0 First issue for internal use K.Hiramoto H.Takeuchi T.Nagasawa
2020
NO DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED
SCALE
- Van Phong 1
BOT Thermal Power Plant Project
1ST ANGLE
PROJECTION
VP1
メーカ Specification and Drawing
控 3RD ANGLE for BAHS Control Panel
合 計 15 PROJECTION
DRAWING NO REV
Plant Engineering Dept.
Engineering Center JOB NO CODE NO J
5411-F37
Carbon Solution Business Unit FF10-E20 1
Resources, Energy & Environment Business Area 5411-F38 30
A4表紙A_0
REVISED HISTORY

19. Jul
J As-Built
2023

17. Mar Revised as per DCN.


I T.N A.Watanabe T.Nagasawa
2022 (VP-L1-I-DC-00046-A)

19. Jan Issue for construction


H T.N A.Watanabe T.Nagasawa
2022

9. Dec Revised as per vendor’s shop test result.


G T.N A.Watanabe T.Nagasawa
2021 Page 6, 8, 11, 14, 16, 21~23, 30 are revised.

NO DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED


DRAWING NO REV
Plant Engineering Dept.
Engineering Center JOB NO CODE NO J
Carbon Solution Business Unit 5411-F37
FF10-E20 1-2
Resources, Energy & Environment Business Area 5411-F38 30
A4表紙A_0
( 2 / )

Reference Drawings

IHI Dwg. No. Project Doc. No. Doc. Title

1 KF10-061 VP1-C-L1-P-ETA-30012 P&ID for Bottom Ash Handling System

2 FF10-L33 VP1-C-L1-I-ETA-30109 I/O List for Bottom Ash Handling System

3 FF10-L34 VP1-C-L1-I-ETA-30108 Modbus List for Bottom Ash Handling System

Single Line Diagram


4 FF10-B40 VP1-C-L1-I-ETA-30114
for Bottom Ash Handling System

Schematic Diagram
5 FF10-E30 VP1-C-L1-I-ETA-30115
for Bottom Ash Handling System

Operation Philosophy
6 FF10-C01 VP1-C-L1-I-ETA-30103
for Bottom Ash Handling System

Boiler Sequence Control Logic Diagram


7 FF10-C10 VP1-C-L1-I-ETA-30020
for Bottom Ash Handling System

Electrical and Instrument Arrangement


8 FF10-E43 VP1-C-L1-I-ETA-30116
for Bottom Ash Handling System

Electrical Equipment Layout


9 Issued by Lot 3 VP1-C-L3-E-BG-00003
for Central Control Building


DRAWING NO 仕

JOB NO CODE NO 書

5411-F37 FF10-E20 紙

A4仕様書用紙_0
(3 / 30)

AS BUILT
(4 / 30)

AS BUILT
(5 / 30)

AS BUILT
(6 / 30)

AS BUILT
(7 / 30)

AS BUILT
(8 / 30)

AS BUILT
(9 / 30)

AS BUILT
(10 / 30)

AS BUILT
(11 / 30)

AS BUILT
(12 / 30)

AS BUILT
(13 / 30)

AS BUILT
(14 / 30)

AS BUILT
(15 / 30)

AS BUILT
(16 / 30)

AS BUILT
(17 / 30)

AS BUILT
(18 / 30)

AS BUILT
(19 / 30)

AS BUILT
(20 / 30)

AS BUILT
(21 / 30)

AS BUILT
(22 / 30)

AS BUILT
(23 / 30)

AS BUILT
(24 / 30)

AS BUILT
(25 / 30)

AS BUILT
(26 / 30)

AS BUILT
(27 / 30)

AS BUILT
(28 / 30)

AS BUILT
(29 / 30)

AS BUILT
(30 / 30)

AS BUILT

You might also like