As-Built

AB0 18.Jul 2023 As-Built


T.Nagasawa K.Hiramoto

REV DATE DESCRIPTION Approved Checked Prepared


OWNER
VAN PHONG POWER COMPANY LIMITED
PROJECT
Van Phong 1 BOT Thermal Power Plant Project
Status
OWNER’S ENGINEER □Approved
AFRY Switzerland Ltd. □Approved with Comment
□Not Approved
□Reviewed
□Reviewed with Comment
EPC CONTRACTORS
IHI–TESSC–CTCI–DHI CONSORTIUM

PROJECT DOCUMENT No REV


VP1-C-L1-E-ETA-30101 AB0

DOCUMENT TITLE
Motor List and Drawing for Bottom Ash Handling System

EPC EPC DOCUMENT No. REV


IHI Corporation FF10-L35 E
注 意 CAUTION
本図書は株式会社IHIの秘密情報を含んでいます。 THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF
本図書について以下のことをIHIの書面による事前承諾なく行うことを IHI CORPORATION.
禁じます。 THE DOCUMENT ALWAYS REQUIRES PRIOR WRITTEN CONSENT OF IHI FOR
(1) 複製(方法を問わず) (1) ITS REPRODUCTION BY ANY MEANS,
(2) 第三者への開示 (2) ITS DISCLOSURE TO A THIRD PARTY,OR
(3) 供与目的以外への使用 (3) ITS USE FOR ANY PURPOSE OTHER THAN THOSE FOR WHICH IT IS SUPPLIED.

For Unit 1 & Unit 2 As-Built


配布先
Owner 1 Reference Drawings
TSB
CTCI IHI Dwg. No. Project Doc. No. Doc. Title
DHI

1 KF10-061 VP1-C-L1-P-ETA-30012 P&ID for Bottom Ash Handling System


CS 品保部
CSPJ 統括部
Specification and Drawing
CSPJ プロ部 2 FF10-001 VP1-C-L1-M-ETA-30010
CS 基設 for Bottom Ash Handling System
CS 燃部
Specification and Drawings of Auxiliary
CS 制電部 1 3 FF10010 VP1-C-L1-M-ETA-30097
CS 主機 Equipment for Bottom Ash Handling System
CS 鉄配部
(配管)
Mechanical Equipment List
4 FF10-L01 VP1-C-L1-M-ETA-30021
(鉄鋼) for Bottom Ash Handling System
CS 機器
CS 品管部 1
CS 運技 1

18. Jul As-Built


CS 建管 E
CS 建エンジ
2023
CS 建計工 1
28. Mar Pages 1, 2, 4, 6~10, 12, 17, 21 were revised and pages
D T.N A.Watanabe T.Nagasawa
2022 23, 25, 37 were added as per design progress.
エネ調管(豊) 1
エネ調管(相)
26. Oct Pages 2~6, 8~12,14,16,19,21~23, 26~35 were
相生技設
C CCBarsatan K.Tanaka T.Nagasawa
2021 revised and page 7 was added as per design progress.

27.May Revised as per owner’s comment and design progress.


IPC 工事部 B S.Funaki K.Hiramoto H.Takeuchi T.Nagasawa
IPC 電計部 1 2021 Revised page: 3-5. Added page: 6-11.

現地(JEL) 1 25. Feb Revised as per owner’s comment and design progress.
A S.Funaki K.Hiramoto H.Takeuchi T.Nagasawa
2021 All pages are revised.

20. Nov
0 First issue Y.M K.Hiramoto H.Takeuchi T.Nagasawa
2020
NO DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED
SCALE
- Van Phong 1
BOT Thermal Power Plant Project
1ST ANGLE
PROJECTION
VP1
メーカ Motor List and Drawing
控 3RD ANGLE for Bottom Ash Handling System
合 計 8 PROJECTION

Plant Engineering Group DRAWING NO REV


Basic Design Dept. JOB NO CODE NO E
Engineering Center 5411-F37 FF10-L35
Carbon Solution Business Unit 0-1
Resources, Energy & Environment Business Area 5411-F38 37
A4表紙A_0
0-2 /
(1/37)
ELECTRICAL MOTOR (For Boiler Portion)

MOTOR DATA

EFFICIENCY POWER FACTOR STARTING STARTING TORQUE PERMISSIBL


SAFE
CODE CONNECTE STARTIN LOAD STARTING E NUMBER
EQUIPMENT NO. FULL FULL STALLING SPACE EQUIPMENT Reference
REV ITEM APPLICATIO D SWGR / SERVICE DESCRIPTION G DUTY LOCKED TIME FOR AND ENCLOSU IP Remark Unit No.
(KKS) MOTOR VOLTAGE RATING SERVICE LOAD LOAD TIME FOR HEATER INSULATIO TYPE MTG LOCATION page
N PANEL METHOD [N/S/I] PHASE ROTOR POWER AT 100% AT 80% BREAK 100%V / INTERVAL RE DEGRE
MAKER [V] [KW] FACTOR CURRENT 100% 75% 50% 100% 75% 50% SPEED HOT / RATING N [NOTE 2] [NOTE 3]
CURRE FACTOR VOLTAG VOLTAG DOWN 80%V START PER [NOTE 1] E
[A] [%] [%] [%] [%] [%] [%] [RPM] COLD [W]
NT [%] E E [%]
[Sec.]
[Sec.] Hr. IHI rev
[A] HOT / COLD
BAHS CTRL PNL
D L1M-2 - 10ETA01 GA001 *0ETA01 AF001-M01 Submerged Chain Conveyor VFD N SEW 400 3 15.00 1.00 29.00 93.0% 93.3% 92.3% 80.0% 75.0% 64.0% 98.60 24.0% 275.4Nm - - 1777 4.5/7.8 - - - F TEFC IM H IP55 Outdoor 1 p.2-5
BAHS CTRL PNL 2C/1H &
B L1M-3 - 10ETA01 GA001 *0ETA02 AJ001-M01 Bottom Ash Clinker Crusher DOL N TOSHIBA 400 3 11.00 1.00 23.00 92.1% 92.2% 91.2% 76.7% 69.5% 56.8% 183.00 34.6% 316.0% 202.2% 370.0% 1475 10/20 - INTERVAL60min - F TEFC IM H IP55 Outdoor 1 p.6-10
BAHS CTRL PNL
B L1M-4 - 10ETA01 GA001 *0ETA03 AF001-M01 Bottom Ash Transfer Conveyor VFD N SUMITOMO 400 3 11.00 1.00 21.00 90.1% 91.1% 89.9% 83.9% 80.0% 70.8% 134.00 33.9% 210.0% 134.4% 308.0% 1770 10/15 - 1time/2times - F TEFC IM H IP55 Outdoor 1 p.11-20
BAHS CTRL PNL
B L1M-5 - 10ETA01 GA001 *0ETA04 AB001-M01 Bottom Ash Silo Gate A DOL I Nidec 400 3 1.50 1.00 4.14 73.8% 72.1% 66.7% 70.9% 62.4% 50.5% 24.00 - - - - 1403 - - - - F TENV IM V IP55 Outdoor 1 p.21
BAHS CTRL PNL
B L1M-6 - 10ETA01 GA001 *0ETA04 AB002-M01 Bottom Ash Silo Gate B DOL I Nidec 400 3 1.50 1.00 4.14 73.8% 72.1% 66.7% 70.9% 62.4% 50.5% 24.00 - - - - 1403 - - - - F TENV IM V IP55 Outdoor 1 p.21
B L1M-7 -
BAHS CTRL PNL
10ETA01 GA001 *0ETA04 AU001-M01 Bottom Ash Silo Vibrator A DOL I SFT 400 3 0.12 1.00 0.45 68.0% 64.0% 57.0% 59.0% 49.0% 39.0% 1.70 - 315.0% - - 1410 - - - - B TEFC IM H IP54 Outdoor 1 p.22-23
p.22
B L1M-8 -
BAHS CTRL PNL
10ETA01 GA001 *0ETA04 AU002-M01 Bottom Ash Silo Vibrator B DOL I SFT 400 3 0.12 1.00 0.45 68.0% 64.0% 57.0% 59.0% 49.0% 39.0% 1.70 - 315.0% - - 1410 - - - - B TEFC IM H IP54 Outdoor 1 p.22-23
p.22
B L1M-9 -
BAHS CTRL PNL
10ETA01 GA001 *0ETN51 AP001-M01 Bottom Ash Drain Tank Pump A VFD I Nidec 400 3 0.75 1.00 1.80 70.0% 73.1% 73.6% 86.4% 80.0% 69.3% 8.00 60.0% 241.0% 154.0% 267.0% 3600 10/20 ≦1 10 times - E S IM V IP68 Outdoor 1 p.24-25
p.23
B L1M-10 -
BAHS CTRL PNL
10ETA01 GA001 *0ETN52 AP001-M01 Bottom Ash Drain Tank Pump B VFD S Nidec 400 3 0.75 1.00 1.80 70.0% 73.1% 73.6% 86.4% 80.0% 69.3% 8.00 60.0% 241.0% 154.0% 267.0% 3600 10/20 ≦1 10 times - E S IM V IP68 Outdoor 1 p.24-25
p.23

D L1M-12 -
BAHS CTRL PNL
10ETA01 GA001 *0ETM01 AP001-M01 Bottom Ash Settling Sump Pump A DOL N TOSHIBA 400 3 5.50 1.00 11.70 90.8% 91.0% 89.9% 76.6% 69.0% 55.9% 100.00 39.3% 340.0% 217.0% 403.0% 1465 10 / 20 0.4 / 0.5 1/2 - 155(F) TEFC IM H IP55 Outdoor 1 p.26-27
p.24-25
D L1M-13 -
BAHS CTRL PNL
10ETA01 GA001 *0ETM02 AP001-M01 Bottom Ash Settling Sump Pump B DOL S TOSHIBA 400 3 5.50 1.00 11.70 90.8% 91.0% 89.9% 76.6% 69.0% 55.9% 100.00 39.3% 340.0% 217.0% 403.0% 1465 10 / 20 0.4 / 0.5 1/2 - 155(F) TEFC IM H IP55 Outdoor 1 p.26-27
p.24-25
D L1M-14 -
BAHS CTRL PNL
10ETA01 GA001 *0ETN01 AP001-M01 Bottom Ash Recirculation Water Sump Pump A VFD N TOSHIBA 400 3 7.50 1.00 14.30 91.7% 92.3% 92.0% 84.2% 80.0% 70.5% 109.00 34.7% 280.0% 179.0% 330.0% 1755 10 / 20 - - - 155(F) TEFC IM H IP55 Outdoor 1 p.28-29
p.26-27
D L1M-15 -
BAHS CTRL PNL
10ETA01 GA001 *0ETN02 AP001-M01 Bottom Ash Recirculation Water Sump Pump B VFD S TOSHIBA 400 3 7.50 1.00 14.30 91.7% 92.3% 92.0% 84.2% 80.0% 70.5% 109.00 34.7% 280.0% 179.0% 330.0% 1755 10 / 20 - - - 155(F) TEFC IM H IP55 Outdoor 1 p.28-29
p.26-27
D L1M-16 -
BAHS CTRL PNL
10ETA01 GA001 *0ETN21 AP001-M01 Submerged Chain Conveyor Water Return Pump A DOL N TOSHIBA 400 3 5.50 1.00 11.70 90.8% 91.0% 89.9% 76.6% 69.0% 55.9% 100.00 39.3% 340.0% 217.0% 403.0% 1465 10 / 20 0.3 / 0.5 1/2 - 155(F) TEFC IM H IP55 Outdoor 1 p.26-27
p.24-25
D L1M-17 -
BAHS CTRL PNL
10ETA01 GA001 *0ETN22 AP001-M01 Submerged Chain Conveyor Water Return Pump B DOL S TOSHIBA 400 3 5.50 1.00 11.70 90.8% 91.0% 89.9% 76.6% 69.0% 55.9% 100.00 39.3% 340.0% 217.0% 403.0% 1465 10 / 20 0.3 / 0.5 1/2 - 155(F) TEFC IM H IP55 Outdoor 1 p.26-27
p.24-25
D L1M-18 -
BAHS CTRL PNL
10ETA01 GA001 *0ETN02 AC001-M01 Cooling Tower A DOL N HITACHI 400 3 2.20 1.00 4.90 86.7% 89.2% 88.2% 74.5% 66.4% 53.6% 46.60 350.0% - - - 1500 - 2.5 1/2 - F TEFC IM V IP55 Outdoor 1 p.30-31
p.28-29
D L1M-19 -
BAHS CTRL PNL
10ETA01 GA001 *0ETN02 AC002-M01 Cooling Tower B DOL S HITACHI 400 3 2.20 1.00 4.90 86.7% 89.2% 88.2% 74.5% 66.4% 53.6% 46.60 350.0% - - - 1500 - 2.5 1/2 - F TEFC IM V IP55 Outdoor 1 p.30-31
p.28-29
B L1M-20 -
BAHS CTRL PNL
10ETA01 GA001 *0ETN31 AP001-M01 Bottom Ash Sump Jetting Pump A DOL N TOSHIBA 400 3 55.00 1.00 100.00 95.5% 95.7% 95.2% 84.5% 80.0% 70.2% 980.00 22.4% 240.0% 153.0% 357.0% 1480 10 / 20 0.6 / 0.9 1/2 - 155(F) TEFC IM H IP55 Outdoor 1 p.32-35
p.30-33
B L1M-21 -
BAHS CTRL PNL
10ETA01 GA001 *0ETN32 AP001-M01 Bottom Ash Sump Jetting Pump B DOL S TOSHIBA 400 3 55.00 1.00 100.00 95.5% 95.7% 95.2% 84.5% 80.0% 70.2% 980.00 22.4% 240.0% 153.0% 357.0% 1480 10 / 20 0.6 / 0.9 1/2 - 155(F) TEFC IM H IP55 Outdoor 1 p.32-35
p.30-33
B L1M-22 -
BAHS CTRL PNL
10ETA01 GA001 *0ETN91 AP001-M01 Bottom Ash Recirculation Water Sump Drain Pump DOL I TOSHIBA 400 3 2.20 1.00 5.00 76.7% 77.2% 75.5% 85.0% 77.5% 64.3% 31.00 63.5% 305.0% 195.2% 361.0% 1500 5/9 ≦1 10 times - E S IM V IP68 Outdoor 1 p.36-37
p.34

* All descriptions listed above are applied to Unit1 & Unit2 (except for Unit No. “0”).
* is "1" for Unit1, "2" for Unit2

NOTE 1. EP : EXPLOSION PROOF


O : OPEN, DRIP PROOF
SP : SPLASH PROOF
S : SUBMERSIBLE
TEFC : TOTALLY ENCLOSED FAN COOLED
TESC : TOTALLY ENCLOSED SELF-COOLING
TEAAC : TOTALLY ENCLOSED AIR-TO-AIR COOLED
TEWAC : TOTALLY ENCLOSED WATER-TO-AIR COOLED

NOTE 2. IM : INDUCTION MOTOR


SM : SYNCHRONOUS MOTOR
DM : DIRECT CURRENT MOTOR
VM : VERIABLEL SPEED MOTOR

NOTE 3. H : HORIZONTAL
V : VERTICAL

1 of 1
As-Built

(2/37)
As-Built

(3/37)
As-Built

(4/37)
As-Built

(5/37)
CLINKER

As-Built

(6/37)
As-Built (7/37)
CLINKER

oil drain

As-Built

(8/37)
As-Built (9/37)
As-Built (10/37)
(11/37)
As-Built

(12/37)
(13/37)
As-Built

(14/37)
As-Built

(15/37)
(16/37)
As-Built

(17/37)
(18/37)
As-Built

(19/37)
As-Built

(20/37)
As-Built

(21/37)
As-Built

(22/37)
As-Built (23/37)

Outside view

Terminal Box
(for Bottom Ash Silo Vibrator)

With support

Internal vision

Terminal Box
(for Bottom Ash Silo Vibrator)

With support
As-Built (24/37)
As-Built (25/37)

Outside view

Terminal Box
(for BA Drain Tank Pump)

With support

Internal vision

Terminal Box
(for BA Drain Tank Pump)

With support
As-Built

(26/37)
As-Built

(27/37)
As-Built

(28/37)
As-Built

(29/37)
As-Built (30/37)
As-Built (31/37)
As-Built

(32/37)
As-Built

(33/37)
As-Built

(34/37)
As-Built

(35/37)
(36/37)
As-Built
As-Built (37/37)

Outside view

Terminal Box
(for Recirculation Water Sump
Drain Pump)

With support

Internal vision

Terminal Box

(for BA Recirculation Water Sump


Drain Pump)

With support