LAPORAN AKHIR

PROYEK

BAB I
PENDAHULUAN

1.1 Sasaran Latar Belakang Pekerjaan


PT. Pengembangan Pariwisata Indonesia (Persero) or Indonesia Tourism
Development Corporation (ITDC) is a state-owned enterprise that develops and operates
Mandalika Special Economic Zone (SEZ) ("The Mandalika") located in Kuta Village, Pujut
District, Central Lombok Regency, West Nusa Tenggara, plans to develop road construction
as the main infrastructure of the Mandalika Resort, as well as the construction of utility
networks, and resort supporting facilities in 2019. Therefore, a Construction Management
(CM) consultant is needed to be able to conduct the construction in accordance to the plans
being set, while also maintain a balance in the aspects of cost, quality, time, and productivity.

The main objective of this Assignment is to provide certainty and assurance to PT


Pengembangan Pariwisata Indonesia (Persero) or Indonesia Tourism Development
Corporation (ITDC) that the implemented infrastructure works to be performed for the period
of 2019-2023 is in accordance with the technical plan drawings, technical specifications, and
other requirements are contained in the Contract Documents, as to fulfill requirements both in
administrative, cost, technical, and environmental terms, as well as quality and time.

1.2 Maksud Penyusunan Laporan


Tujuan dari penyusunan laporan ini adalah untuk melaporkan kepada instansi-instansi
yang terkait mengenai perkembangan proyek secara berkala perbulan mengenai Progres
Kemajuan Pekerjaan, Progres Monitoring Report, Summary, Sertifikat Pembayaran, Quality
Control Report, dokumentasi pelaksanaan pekerjaan, dan laporan pemantauan lingkungan
dalam bentuk buku laporan bulanan.

Mandalika Urban & Turism Infrastruture Page | 1


Project
LAPORAN AKHIR
PROYEK

1.3 Lokasi Proyek


Adapun lokasi proyek adalah di kawasan Mandalika, Kuta, Kabupaten Lombok Tengah, Kecamatan Pujut, Nusa Tenggara Barat. Untuk jelasnya
dapat dilihat pada Peta Lokasi Proyek berikut ini;

Gambar 1 Mapping Lokasi Paket 1

Mandalika Urban & Turism Infrastruture Page | 2


Project
LAPORAN AKHIR
PROYEK

Gambar 2 Mapping Lokasi Paket 2

Mandalika Urban & Turism Infrastruture Page | 3


Project
LAPORAN AKHIR
PROYEK

1.4 Laporan Akhir Proyek


Laporan Akhir ini dibuat untuk menyajikan informasi mulai dari Pre Construction
Meeting (PCM) sampai dengan Partial Hand Over (PHO). Laporan meliputi administrasi,
pembiayaan, schedule serta hal- hal yang berkaitan dengan teknis.
Laporan akhir ini terdiri dari
1. Buku I : Informasi Umum
2. Buku II : Lampiran A Monitoring
- Monitoring DED
- Monitoring Shop Drawing
- Monitoring Approval Material
- Monitoring Methode Statement
- Monitoring Asbuilt Drawing
- Monitoring Submittal & Korenspondens
- Monitoring SIR
- Monitorig VME
- Monitoring Man Power
- Monitoring Equipment
3. Buku III : Lampiran B Back Up Data Geodetik
- MC-0 % (Survey Geodetik)
- MC-100 % (Survey Geodetik)
4. Buku IV : Lampiran C Back Up Quantity
- Time Schedule
- S-Curve Rencana & Actual Lapangan
- Rekapitulasi Final Account
- Progress Weekly & Monthly
- IPC / IPA
- Variation Order (VO)
5. Buku V : Lampiran D Back Up Quality
- Data – Data pengujian / test laboratotium dan lapangan (QC)
- Monitoring data QC
6. Buku VI : Lampiran E Engineering
- Project Prioritas
- Justifikasi Teknis (Justek)
7. Buku VII : Lampiran F ESHS
- ….
- ….

Mandalika Urban & Turism Infrastruture Page | 4


Project
LAPORAN AKHIR
PROYEK

8. Buku VIII : Lampiran G


- Strip Map
- Dokumentasi Drone