PT. Pengembangan Pariwisata Indonesia (Persero) or Indonesia Tourism Development Corporation (ITDC) is a state-owned enterprise that develops and operates Mandalika Special Economic Zone (SEZ) ("The Mandalika") located in Kuta Village, Pujut District, Central Lombok Regency, West Nusa Tenggara, plans to develop road construction as the main infrastructure of the Mandalika Resort, as well as the construction of utility networks, and resort supporting facilities in 2019. Therefore, a Construction Management (CM) consultant is needed to be able to conduct the construction in accordance to the plans being set, while also maintain a balance in the aspects of cost, quality, time, and productivity.
The main objective of this Assignment is to provide certainty and assurance to PT
Pengembangan Pariwisata Indonesia (Persero) or Indonesia Tourism Development Corporation (ITDC) that the implemented infrastructure works to be performed for the period of 2019-2023 is in accordance with the technical plan drawings, technical specifications, and other requirements are contained in the Contract Documents, as to fulfill requirements both in administrative, cost, technical, and environmental terms, as well as quality and time.
1.2 Maksud Penyusunan Laporan
Tujuan dari penyusunan laporan ini adalah untuk melaporkan kepada instansi-instansi yang terkait mengenai perkembangan proyek secara berkala perbulan mengenai Progres Kemajuan Pekerjaan, Progres Monitoring Report, Summary, Sertifikat Pembayaran, Quality Control Report, dokumentasi pelaksanaan pekerjaan, dan laporan pemantauan lingkungan dalam bentuk buku laporan bulanan.
Mandalika Urban & Turism Infrastruture Page | 1
Project LAPORAN AKHIR PROYEK
1.3 Lokasi Proyek
Adapun lokasi proyek adalah di kawasan Mandalika, Kuta, Kabupaten Lombok Tengah, Kecamatan Pujut, Nusa Tenggara Barat. Untuk jelasnya dapat dilihat pada Peta Lokasi Proyek berikut ini;
Gambar 1 Mapping Lokasi Paket 1
Mandalika Urban & Turism Infrastruture Page | 2
Project LAPORAN AKHIR PROYEK
Gambar 2 Mapping Lokasi Paket 2
Mandalika Urban & Turism Infrastruture Page | 3
Project LAPORAN AKHIR PROYEK
1.4 Laporan Akhir Proyek
Laporan Akhir ini dibuat untuk menyajikan informasi mulai dari Pre Construction Meeting (PCM) sampai dengan Partial Hand Over (PHO). Laporan meliputi administrasi, pembiayaan, schedule serta hal- hal yang berkaitan dengan teknis. Laporan akhir ini terdiri dari 1. Buku I : Informasi Umum 2. Buku II : Lampiran A Monitoring - Monitoring DED - Monitoring Shop Drawing - Monitoring Approval Material - Monitoring Methode Statement - Monitoring Asbuilt Drawing - Monitoring Submittal & Korenspondens - Monitoring SIR - Monitorig VME - Monitoring Man Power - Monitoring Equipment 3. Buku III : Lampiran B Back Up Data Geodetik - MC-0 % (Survey Geodetik) - MC-100 % (Survey Geodetik) 4. Buku IV : Lampiran C Back Up Quantity - Time Schedule - S-Curve Rencana & Actual Lapangan - Rekapitulasi Final Account - Progress Weekly & Monthly - IPC / IPA - Variation Order (VO) 5. Buku V : Lampiran D Back Up Quality - Data – Data pengujian / test laboratotium dan lapangan (QC) - Monitoring data QC 6. Buku VI : Lampiran E Engineering - Project Prioritas - Justifikasi Teknis (Justek) 7. Buku VII : Lampiran F ESHS - …. - ….