NTS 7/150/SBS/3004 - B
7-150/SBS/3004.DWG
NOTES:
CP107 - RAILWAY SYSTEMS AND TRACKWORK
1. AFTER COMPLETE ALL JOINTING WORK INCLUDE FILLING INSULATING OIL TO CABLE JOINT FOR A TIME, WATER LEVEL IS NO PROBLEM
JAKARTA MASS RAPID TRANSIT PROJECT
2. SNAKING IF APPLIED WILL BE DONE OUTSITE CABLE TRENCH, NOT INSIDE DUE TO BENDING RADIUS OF CABLE
3. IF POSSIBLE TO MAKE WATER SEAL FOR CABLE TRENCH IT WILL BE BETTER, AND NO PROBLEM IF IMPOSSIBLE
NTS 7/150/SBS/3004 - B
7-150-SBS-3004.DWG
LINK BOX
Earthing cable
NOTES:
CP107 - RAILWAY SYSTEMS AND TRACKWORK
1. AFTER COMPLETE ALL JOINTING WORK INCLUDE FILLING INSULATING OIL TO CABLE JOINT FOR A TIME, WATER LEVEL IS NO PROBLEM
JAKARTA MASS RAPID TRANSIT PROJECT
2. SNAKING IF APPLIED WILL BE DONE OUTSITE CABLE TRENCH, NOT INSIDE DUE TO BENDING RADIUS OF CABLE
3. IF POSSIBLE TO MAKE WATER SEAL FOR CABLE TRENCH IT WILL BE BETTER, AND NO PROBLEM IF IMPOSSIBLE
NTS 7/150/SBS/3004 - B
7-150-SBS-3004.DWG