11-152110-4800000648-MGC-MEC-ITP-000041_01
11-152110-4800000648-MGC-MEC-ITP-000041_01
11-152110-4800000648-MGC-MEC-ITP-000041_01
Contract Title Transmission System From Gayal To Al Badaa Reservoir And Magna BPT
Work Order Title Transmission System From Gayal To Al Badaa Reservoir And Magna BPT
Signatures:
Electronic documents once printed, are uncontrolled and may become out-dated. Refer to Aconex for current revision
06 June, 2024
Document approval
1 Document reveiw
Legend:
2 Material receiving
2.1
Overhead Crane and Drawings Submittal From NEOM General
MIR, Review of Suppliers/providers per-
Accessories Specification: SCH 3B, Sec-32090 PQD Approval, IFC, MAT& Ref
qualification approval H H W W
Documents
Factory fat test and sample test
FAT Test certificates, & CL 008
3 Installation
Dimension check for Runway
Survey WIR, AS PER APPROVED TEST
rail for each column, Strightness, Approved Drawings & TEST
3.1 PROCEDURE & DRAWINGS Specification: SCH 3B, Sec-33090 H H R R
elevation and Runway length. PROCDURE, & CL 009
Legend:
All electrical activities itp to be Project Specs/ Approved Test Project Specs/ Approved Test
3.9 ITP, Project Specs/ Approved Test procedure H H R R
submit later procedure procedure, & CL 009
Manufacturer certification of Project Specs/ Approved Test Project Specs/ Approved Test
3.11 Review certificates H H R R
proper installation procedure procedure, & CL 009
Documents like as built Project Specs/ Approved Test Specification: SCH 3B, Sec-33090
3.13 Review of as built drawings H H R R
drawings procedure & CL 009
4 TESTING
Legend:
WIR, AS PER APPROVED TREST PROCEDURE & Specification: SCH 3B, Sec-33090
4.1 Assembly Check for Crane & Hoist DRAWINGS Specification: SCH 3B, Sec-33090 & H H W W
APPROVED TEST PROCEDURE,
& CL 010
GENERAL NOTES:
The first (3) of each inspection or testing activities listed require 100% participation of client site inspection personnel. After this period, client inspection may adjust the level of client participation based on the contractor's performance.
Hold: QA/QC team shall be notified of the schedule of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC Team/Client representative in attendance.
Review: Required qualification/certification/reports shall be submitted for the QA/QC team review and approval.
Witness: QA/QC team shall be notified of the schedule of inspection or test in advance. If the QA/QC Team/Client representative does not come on time for inspection, the activity can proceed.
Surveillance: QA/QC team to monitor work in progress without notice from the construction organization/Random check selection.
Legend:
NEO-008
PROJECT TITLE CONTRACT CONTRACTOR
NUMBER
Water Transmission System from Gayal To Al Bada Reservoir Tank & Magna BPT MGC
4800000648
A.1
Ensure over head crane & accessories shall be inspected for:
1. Damage
2. Compliance with Specifications
Quantity
A.2
Ensure overhead crane and accessories shall be stored as recommended
by the manufacturer.
A.3
Verify crane & accessories shall be unloaded carefully
A.4
Items to be handled must be suitably packed in weather proof cases as may be
required considering site conditions.
A.5
Prior to handling of the crates or boxes, necessary chain marks to be located
on the same and proper rigging equipment must be identified.
A.6
Slings, shackles, belts must be chosen based on the nature of packing. Care
should be taken that painted surfaces are not handled using bare metallic
chains.
A.7
Prior to handling, confirm that the area for unloading the same is cleared and
suitable wooden sleepers or other packing materials is placed.
A.8
The boxes containing mechanical parts and electrical components shall
be stored either under weather proof wrap or in properly ventilated ware houses
.
A.9
Care should be taken that the boxes are not to exposed to water resulting from
high humidity, rainfall or drainage depending on the site conditions.
A.10
Hollow sections, if any, should be properly sealed at all ends to prevent
accumulations of debris / dust or moisture inclusions.
REMARKS:
REFERENCE DOCUMENTS:
1. PROJECT SPECIFICATION
Contractor NEOM
Construction Representative PMCEPM REPRESENTATIVE
NAME, Work is completed and ready for Inspection NAME, T&I QC Record Review Work Verified
SIGN, SIGN, Witnessed
DATE DATE
QC Supervisor
NAME, Performed Inspection Work/rework may
SIGN, proceed
DATE
INSPECTION CHECKLIST CHECK PREPARED DATE DISCIPLINE
LIST
OVER DOCUMENT REVIEW & INSTALLATION NUMBER 06.06.2024 MECHANICAL
NEO-009
PROJECT TITLE CONTRACT CONTRACTOR
NUMBER
Water Transmission System from Gayal To Al Bada Reservoir Tank & Magna BPT MGC
4800000648
A.1
Review documents for Material. .
A.2
Approved drawings are available.
A.3
Approved material submittal is available.
A.4
Approved method statement is available.
A.5
Approved PQD for supplier available.
A.6
FAT test report is available
A.7
Approved ndt technician documents
A.8
Approved coating inspector documents
A.9
Approved WPS for welding
A.10
Check welders IDS cards
A.11
Check clearance from civil & elec dept
B INSTALLATION
B.1 Dimension check for Runway rail Span for each column, Strightness, elevation
and Runway length.
B.2
Strightness & elevation for base plates
B.3
Strightness & elevation for crane beams
B.5
NDT (PT/MPT) Runway Rail.
B.6
Surface preparation & surface profile
B.7
Visual Inspection for painting
B.8
DFT inspection for painting
B9.
All electrical activities itp to be submit later
B.10 Cleaning & tagging of crane elements
B.11
Manufacturer certification of proper installation
B. 12
Final protection for over head crane elements
B. 13
Documents like as built drawings
REMARKS:
REFERENCE DOCUMENTS:
1. PROJECT SPECIFICATION
Contractor NEOM
Construction Representative PMCEPM REPRESENTATIVE
NAME, Work is completed and ready for Inspection NAME, T&I QC Record Review Work Verified
SIGN, SIGN, Witnessed
DATE DATE
QC Supervisor
NAME, Performed Inspection Work/rework may
SIGN, proceed
DATE
INSPECTION CHECKLIST CHECK PREPARED DATE DISCIPLINE
NUMBER
OVER HEAD TESTING 06.06.2024 MECHANICAL
NEO-010
PROJECT TITLE CONTRACT CONTRACTOR
NUMBER
Water Transmission System from Gayal To Al Bada Reservoir Tank & Magna BPT MGC
4800000648
A.1
A.2
Ensure the mechanical connections and nut
bolt connections for required Torque tightness.
A.3
A.4
A.5
Proof Load testing @ 125% Load
REMARKS:
REFERENCE DOCUMENTS:
1. PROJECT SPECIFICATION
Contractor NEOM
Construction Representative PMCEPM REPRESENTATIVE
NAME, Work is completed and ready for Inspection NAME, T&I QC Record Review Work Verified
SIGN, SIGN, Witnessed
DATE DATE
QC Supervisor
NAME, Performed Inspection Work/rework may
SIGN, proceed
DATE
INSPECTION CHECKLIST IC NUMBER PREPARED DATE DISCIPLINE
MGC-MECH-00XX 06.06.2024
OVERHEAD CRANE Torque and bolt tightening Electrical
Water Transmission System from Gayal To Al Bada Reservoir Tank & Magna BPT 4800000648 MGC
REMARKS:
REFERENCE DOCUMENTS:
1. PROJECT SPECIFICATION
Contractor NEOM
QC SUPERVISOR