Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Annex “C”

Barangay Biasong
Monthly Monitoring Report
On Barangay Road Clearing Operations (BaRCO)
(Latest DILG Memorandum Circular No. 2022-085 dated June 20, 2022, DILG MC No. 2023-017 dated January 25, 2023 and DILG MC No. 2024-053 dated April 16, 2024)
For the Month of April CY 2024
Conducted Road Clearing Remarks (should include
Operations Inventory of Barangay Roads, Streets, Alleys details on the conduct of
[Check appropriate column] & Turned Over Road/s Road Length (in km) Date of Clearing Action Taken BaRCO from the 20th day to
YES NO [Location/Street name/Address] (d) Operation (f) the last day of the previous
(a) (b) (c) (e) month; type of MOV/s,
other information/details)
(g)
 1. Purok 7 going to Purok 8 300 meters 4/5/2024 Accomplished Total Weight Kgs (Waste)
circumferential Road taken is 26 Kg
 2. Barangay Vicinity and Covered Court Station 4/12/2024 Accomplished Total Weight Kgs (Waste)
taken is 15 Kg
 3. Calibo St., turned to Bonifacio St., 500 meters 4/19/2024 Accomplished Total Weight Kgs (Waste)
turned to CP. Garcia St. taken is 37 Kg
4. Purok 7 going to Purok 8 300 meters 4/26/2024 Accomplished Total Weight Kgs (Waste)
circumferential Road taken is 58 Kg
Total

Prepared by: I hereby CERTIFY and DECLARE that the above information
and activities are true and accurate to the best of my knowledge.
KRISSA NOAHMAE S. PACION
Barangay Secretary
JOSE MORENO B. NARVAEZ
Punong Barangay

“Kalinisan at Kaayusan sa Bagong Pilipinas”

Page 1 of 1

You might also like