Title:MEPL-PRC-OMD-MEL-006

MEENAKSHI ENERGY Page: Page 1 of 7


Date: 11/07/2016
PVT LTD Rev: A
Maintenance
Procedure Standard Procedure for Biennial Preventive
Maintenance maintenance of 400kV Wave Trap
Section-Electrical

MEPL POWER PLANT


Standard Procedure for Biennial Preventive
Maintenance of 400kV Wave Trap

This procedure is due to be revised on or before


01/01/2018.

11-07- Holiram First


A Kirupakaran V Seshagiri Rao
2016 Chinni issue

REV DATE PREPARED BY SIGN CHECKED BY SIGN APPROVED SIGN REASON FOR
BY
REVISION
Title:MEPL-PRC-OMD-MEL-006
MEENAKSHI ENERGY Page: Page 2 of 7
Date: 11/07/2016
PVT LTD Rev: A
Maintenance
Procedure Standard Procedure for Biennial Preventive
Maintenance maintenance of 400kV Wave Trap
Section-Electrical

REVISION CHART
REVISION REVISION REVISION
PAGE PAGE ATTACH
A B C A B C MENTS A B C
1 X
2 X

3 X

4 X

5 X

6 X

7 X
Title:MEPL-PRC-OMD-MEL-006
MEENAKSHI ENERGY Page: Page 3 of 7
Date: 11/07/2016
PVT LTD Rev: A
Maintenance
Procedure Standard Procedure for Biennial Preventive
Maintenance maintenance of 400kV Wave Trap
Section-Electrical

Table of contents

1 Purpose.........................................................................................
2 Scope............................................................................................
3 Responsibility.................................................................................
4 Safety, Health and Environment Issues..............................................
5 Reference Documents & Protocols.....................................................
6 Special Tools, Spares & Consumables................................................
7 Precautions....................................................................................
8 Procedure......................................................................................
9 Revision History..............................................................................

1 Purpose:
Title:MEPL-PRC-OMD-MEL-006
MEENAKSHI ENERGY Page: Page 4 of 7
Date: 11/07/2016
PVT LTD Rev: A
Maintenance
Procedure Standard Procedure for Biennial Preventive
Maintenance maintenance of 400kV Wave Trap
Section-Electrical

Purpose of this document is to provide a detailed procedures for carrying


out the Preventive maintenance of 400 kV Wave Trap in a safe and
effective manner to improve the reliability and to upkeep the long term
healthiness of the same.

2 Scope:
This document applicable for the bi annual preventive maintenance of all
2 No’s of 400 kV Wave Trap installed in the switchyard.

3 Responsibility:
Maintenance Apply for PTW, receive PTW, Guide technicians in
Engineer carrying out the job and clear the PTW.
Area Operator/SCE: Issue of PTW.
Personal Supervisor Supervise the job continuously without leaving the work
area till the work is completed or suspended.
Maintenance Execute the job safely and efficiently as per the
Technician: Standard Maintenance Procedure and fill the protocols.

4 Safety, Health and Environment Issues:


Safety document required PTW
Confirm isolation Yes
Special Safety Gear Suitable Arc Flash Suit
Hot Work Cert: Not required
Portable Fire Extinguisher: Not required

5 Reference Documents & Protocols:


 Line Trap manual - Areva make Manual
Title:MEPL-PRC-OMD-MEL-006
MEENAKSHI ENERGY Page: Page 5 of 7
Date: 11/07/2016
PVT LTD Rev: A
Maintenance
Procedure Standard Procedure for Biennial Preventive
Maintenance maintenance of 400kV Wave Trap
Section-Electrical

(Volume-R, Part-XI of O&M manual


documents)
 MEPL-PRT-OMD-MEL-006 - Protocol for Annual Biennial Preventive
Maintenance of 400 kV Wave Trap

6 Special Tools, Spares & Consumables


Special Tools /Test Insulated platform or Man Lifter Machine, Insulation
Equipment Resistance Kit(5kV Megger) ,
Spares / consumables Nuts & Bolts,

7 Precautions:
 Wear all the required PPE
 Ensure the Isolation of correct Breaker and Isolators.
 Ensure the line has been disconnected from other end, since the wave
trap has installed in direct line. The isolation of the wave trap is both
end party matter (M/s. MEPL vs. M/s. PGCIL).
 Ensure that live equipment beside is cordoned off.
 Follow standard EHS and engineering practices throughout the job.

8 Procedure:
Opportunity Based:

 Clean the insulators with cloth.


 Clean the Corona ring with cloth.
 Tighten the bolt, nut of over voltage arrestor, Tuning unit and HV
terminal with proper tool & Tackles.
 Do the insulation Resistance test for insulators with HV IR Tester.
 Do the insulation Resistance test (Use the 1kV IR Tester ) for Lightning
Arrestor which is intended to protect tuning device and main coil of the
trap against over voltages and it is located in inside of the main coil of
trap.
 Check the insulation for Cracks of Tensile Rods.
Title:MEPL-PRC-OMD-MEL-006
MEENAKSHI ENERGY Page: Page 6 of 7
Date: 11/07/2016
PVT LTD Rev: A
Maintenance
Procedure Standard Procedure for Biennial Preventive
Maintenance maintenance of 400kV Wave Trap
Section-Electrical

 Check the insulation rings for cracks of end rings.


 Clear all the tools and tackles from the location and clean the area.
 Clear the PTW
 Fill up the protocol sheet with all relevant data. Record any
abnormalities in the remarks column of the protocol.
 Submit all records to Electrical Maintenance Engineer for review.
 Update the data in the computerized maintenance management
system.
 Close the Work Order.

9 Revision History:
Date Revision# Page # Purpose
11-07-2016 A All First issue