Professional Documents
Culture Documents
standard procedure for BIENNIAL PM of 400kV Wave Trap
standard procedure for BIENNIAL PM of 400kV Wave Trap
REV DATE PREPARED BY SIGN CHECKED BY SIGN APPROVED SIGN REASON FOR
BY
REVISION
Title:MEPL-PRC-OMD-MEL-006
MEENAKSHI ENERGY Page: Page 2 of 7
Date: 11/07/2016
PVT LTD Rev: A
Maintenance
Procedure Standard Procedure for Biennial Preventive
Maintenance maintenance of 400kV Wave Trap
Section-Electrical
REVISION CHART
REVISION REVISION REVISION
PAGE PAGE ATTACH
A B C A B C MENTS A B C
1 X
2 X
3 X
4 X
5 X
6 X
7 X
Title:MEPL-PRC-OMD-MEL-006
MEENAKSHI ENERGY Page: Page 3 of 7
Date: 11/07/2016
PVT LTD Rev: A
Maintenance
Procedure Standard Procedure for Biennial Preventive
Maintenance maintenance of 400kV Wave Trap
Section-Electrical
Table of contents
1 Purpose.........................................................................................
2 Scope............................................................................................
3 Responsibility.................................................................................
4 Safety, Health and Environment Issues..............................................
5 Reference Documents & Protocols.....................................................
6 Special Tools, Spares & Consumables................................................
7 Precautions....................................................................................
8 Procedure......................................................................................
9 Revision History..............................................................................
1 Purpose:
Title:MEPL-PRC-OMD-MEL-006
MEENAKSHI ENERGY Page: Page 4 of 7
Date: 11/07/2016
PVT LTD Rev: A
Maintenance
Procedure Standard Procedure for Biennial Preventive
Maintenance maintenance of 400kV Wave Trap
Section-Electrical
2 Scope:
This document applicable for the bi annual preventive maintenance of all
2 No’s of 400 kV Wave Trap installed in the switchyard.
3 Responsibility:
Maintenance Apply for PTW, receive PTW, Guide technicians in
Engineer carrying out the job and clear the PTW.
Area Operator/SCE: Issue of PTW.
Personal Supervisor Supervise the job continuously without leaving the work
area till the work is completed or suspended.
Maintenance Execute the job safely and efficiently as per the
Technician: Standard Maintenance Procedure and fill the protocols.
7 Precautions:
Wear all the required PPE
Ensure the Isolation of correct Breaker and Isolators.
Ensure the line has been disconnected from other end, since the wave
trap has installed in direct line. The isolation of the wave trap is both
end party matter (M/s. MEPL vs. M/s. PGCIL).
Ensure that live equipment beside is cordoned off.
Follow standard EHS and engineering practices throughout the job.
8 Procedure:
Opportunity Based:
9 Revision History:
Date Revision# Page # Purpose
11-07-2016 A All First issue