Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

Version 7.2.

11

PVsyst - Simulation report


Grid-Connected System

Project: Batmete
Variant: ICOD Jinko
Sheds, single array
System power: 220.0 MWp
Batmete - Algeria

POWERCHINA HUADONG
HDEC MIDDLE EAST CO DMCC (United arab emirates)
Project: Batmete
Variant: ICOD Jinko

PVsyst V7.2.11 HDEC MIDDLE EAST CO DMCC (United arab emirates)


VC0, Simulation date:
17/06/23 10:30
with v7.2.11

Project summary
Geographical Site Situation Project settings
Batmete Latitude 35.20 °N Albedo 0.30
Algeria Longitude 3.73 °E
Altitude 783 m
Time zone UTC

Meteo data
Batmete
SolarGIS Monthly aver. , period not spec. - Synthetic

System summary
Grid-Connected System Sheds, single array

PV Field Orientation Near Shadings User's needs


Fixed plane Linear shadings Unlimited load (grid)
Tilt/Azimuth 29 / 0 °

System information
PV Array Inverters
Nb. of modules 379344 units Nb. of units 200 units
Pnom total 220.0 MWp Pnom total 220.0 MWac
Pnom ratio 1.000

Results summary
Produced Energy 415146 MWh/year Specific production 1887 kWh/kWp/year Perf. Ratio PR 86.79 %

Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Near shading definition - Iso-shadings diagram 6
Main results 7
Loss diagram 8
Special graphs 9

17/06/23 PVsyst Licensed to HDEC MIDDLE EAST CO DMCC (United arab emirates) Page 2/9
Project: Batmete
Variant: ICOD Jinko

PVsyst V7.2.11 HDEC MIDDLE EAST CO DMCC (United arab emirates)


VC0, Simulation date:
17/06/23 10:30
with v7.2.11

General parameters
Grid-Connected System Sheds, single array

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane Nb. of sheds 168 units Transposition Perez
Tilt/Azimuth 29 / 0 ° Single array Diffuse Perez, Meteonorm
Sizes Circumsolar separate
Sheds spacing 8.50 m
Collector width 4.58 m
Ground Cov. Ratio (GCR) 53.8 %
Top inactive band 0.02 m
Bottom inactive band 0.02 m
Shading limit angle
Limit profile angle 26.4 °

Horizon Near Shadings User's needs


Free Horizon Linear shadings Unlimited load (grid)

Bifacial system
Model 2D Calculation
unlimited sheds
Bifacial model geometry Bifacial model definitions
Sheds spacing 8.50 m Ground albedo 0.30
Sheds width 4.62 m Bifaciality factor 77 %
Limit profile angle 26.4 ° Rear shading factor 5.0 %
GCR 54.3 % Rear mismatch loss 10.0 %
Height above ground 0.81 m Shed transparent fraction 0.0 %

PV Array Characteristics
PV module Inverter
Manufacturer Jinkosolar Manufacturer Sungrow
Model JKM580N-72HL4-BDV Model SG1100UD-20
(Custom parameters definition) (Custom parameters definition)
Unit Nom. Power 580 Wp Unit Nom. Power 1100 kWac
Number of PV modules 379344 units Number of inverters 200 units
Nominal (STC) 220.0 MWp Total power 220000 kWac
Modules 13548 Strings x 28 In series Operating voltage 938-1500 V
At operating cond. (50°C) Max. power (=>12°C) 1320 kWac
Pmpp 204.1 MWp Pnom ratio (DC:AC) 1.00
U mpp 1096 V
I mpp 186248 A

Total PV power Total inverter power


Nominal (STC) 220020 kWp Total power 220000 kWac
Total 379344 modules Number of inverters 200 units
Module area 979941 m² Pnom ratio 1.00
Cell area 901868 m²

17/06/23 PVsyst Licensed to HDEC MIDDLE EAST CO DMCC (United arab emirates) Page 3/9
Project: Batmete
Variant: ICOD Jinko

PVsyst V7.2.11 HDEC MIDDLE EAST CO DMCC (United arab emirates)


VC0, Simulation date:
17/06/23 10:30
with v7.2.11

Array losses
Array Soiling Losses Thermal Loss factor DC wiring losses
Loss Fraction 2.0 % Module temperature according to irradiance Global array res. 0.13 mΩ
Uc (const) 29.0 W/m²K Loss Fraction 2.0 % at STC
Uv (wind) 0.0 W/m²K/m/s

LID - Light Induced Degradation Module Quality Loss Module mismatch losses
Loss Fraction 0.8 % Loss Fraction -0.2 % Loss Fraction 1.0 % at MPP

Strings Mismatch loss


Loss Fraction 0.1 %

IAM loss factor


Incidence effect (IAM): Fresnel AR coating, n(glass)=1.526, n(AR)=1.290

0° 30° 50° 60° 70° 75° 80° 85° 90°


1.000 0.999 0.987 0.962 0.892 0.816 0.681 0.440 0.000

System losses
Auxiliaries loss
Proportionnal to Power 4.0 W/kW
0.0 kW from Power thresh.

AC wiring losses
Inv. output line up to MV transfo
Inverter voltage 660 Vac tri
Loss Fraction 0.00 % at STC
Inverter: SG1100UD-20
Wire section (200 Inv.) Copper 200 x 3 x 700 mm²
Average wires length 0m

MV line up to HV Transfo
MV Voltage 30 kV
Average each inverter
Wires Copper 3 x 500 mm²
Length 13800 m
Loss Fraction 0.50 % at STC

AC losses in transformers
MV transfo
Medium voltage 30 kV
Operating losses at STC
Nominal power at STC 216300 kVA
Iron loss (24/24 Connexion) 8.65 kW/Inv.
Loss Fraction 0.10 % at STC
Coils equivalent resistance 3 x 0.50 mΩ/inv.
Loss Fraction 1.00 % at STC

17/06/23 PVsyst Licensed to HDEC MIDDLE EAST CO DMCC (United arab emirates) Page 4/9
Project: Batmete
Variant: ICOD Jinko

PVsyst V7.2.11 HDEC MIDDLE EAST CO DMCC (United arab emirates)


VC0, Simulation date:
17/06/23 10:30
with v7.2.11

AC losses in transformers
HV transfo
Grid voltage 220 kV
Transformer from Datasheets Operating losses at STC
Nominal power 330000 kVA Nominal power at STC 216300 kVA
Iron loss 600.00 kVA Iron loss (24/24 Connexion) 600.00 kW
Loss Fraction 0.18 % of PNom Loss Fraction 0.28 % at STC
Copper loss 900.00 kVA Coils equivalent resistance 3 x 7.44 mΩ
Loss Fraction 0.27 % of PNom Loss Fraction 0.18 % at STC

17/06/23 PVsyst Licensed to HDEC MIDDLE EAST CO DMCC (United arab emirates) Page 5/9
Project: Batmete
Variant: ICOD Jinko

PVsyst V7.2.11 HDEC MIDDLE EAST CO DMCC (United arab emirates)


VC0, Simulation date:
17/06/23 10:30
with v7.2.11

Near shadings parameter


Perspective of the PV-field and surrounding shading scene

Iso-shadings diagram
Orientation #1

17/06/23 PVsyst Licensed to HDEC MIDDLE EAST CO DMCC (United arab emirates) Page 6/9
Project: Batmete
Variant: ICOD Jinko

PVsyst V7.2.11 HDEC MIDDLE EAST CO DMCC (United arab emirates)


VC0, Simulation date:
17/06/23 10:30
with v7.2.11

Main results
System Production
Produced Energy 415146 MWh/year Specific production 1887 kWh/kWp/year
Performance Ratio PR 86.79 %

Normalized productions (per installed kWp) Performance Ratio PR

Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² MWh MWh ratio
January 88.7 31.00 7.30 138.0 126.4 27702 26284 0.866
February 106.6 37.40 8.60 147.8 138.4 30348 28927 0.889
March 156.9 54.90 12.00 190.3 179.3 38847 37051 0.885
April 182.4 66.20 15.50 195.9 183.5 39710 37947 0.880
May 216.1 79.40 20.50 211.2 197.6 42608 40752 0.877
June 226.5 81.10 26.20 214.3 200.8 42575 40749 0.864
July 231.1 87.60 30.20 223.6 209.5 43736 41865 0.851
August 205.6 79.70 29.10 214.6 201.5 41870 40053 0.848
September 162.7 63.20 23.30 188.3 176.9 37315 35669 0.861
October 134.0 48.60 18.20 177.2 166.6 35522 33898 0.869
November 93.5 34.30 11.90 139.5 129.5 28191 26814 0.874
December 81.9 29.60 8.19 133.5 120.9 26469 25136 0.856
Year 1886.0 693.00 17.64 2174.1 2030.9 434893 415146 0.868

Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

17/06/23 PVsyst Licensed to HDEC MIDDLE EAST CO DMCC (United arab emirates) Page 7/9
Project: Batmete
Variant: ICOD Jinko

PVsyst V7.2.11 HDEC MIDDLE EAST CO DMCC (United arab emirates)


VC0, Simulation date:
17/06/23 10:30
with v7.2.11

Loss diagram
1886 kWh/m² Global horizontal irradiation
+15.3% Global incident in coll. plane

-3.19% Near Shadings: irradiance loss


-1.83% IAM factor on global
-2.00% Soiling loss factor
+0.29% Ground reflection on front side

Bifacial

Global incident on ground


753 kWh/m² on 1804484 m²

-70.00% (0.30 Gnd. albedo)


Ground reflection loss

-69.38% View Factor for rear side

+8.89% Sky diffuse on the rear side


+0.05% Beam effective on the rear side
-5.00% Shadings loss on rear side
6.49% Global Irradiance on rear side (132 kWh/m²)
2031 kWh/m² * 979941 m² coll. Effective irradiation on collectors

efficiency at STC = 22.46% PV conversion, Bifaciality factor = 0.77

469290 MWh Array nominal energy (at STC effic.)


+0.31% PV loss due to irradiance level

-4.04% PV loss due to temperature


+0.20% Module quality loss

-0.80% LID - Light induced degradation


-1.10% Mismatch loss, modules and strings
-0.62% Mismatch for back irradiance
-1.46% Ohmic wiring loss
434893 MWh Array virtual energy at MPP
-1.44% Inverter Loss during operation (efficiency)
0.00% Inverter Loss over nominal inv. power
0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
0.00% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
-0.01% Night consumption
428619 MWh Available Energy at Inverter Output

-0.40% Auxiliaries (fans, other)


0.00% AC ohmic loss
-1.09% Medium voltage transfo loss
-0.32% MV line ohmic loss
-1.37% High voltage transfo loss
415146 MWh Energy injected into grid

17/06/23 PVsyst Licensed to HDEC MIDDLE EAST CO DMCC (United arab emirates) Page 8/9
Project: Batmete
Variant: ICOD Jinko

PVsyst V7.2.11 HDEC MIDDLE EAST CO DMCC (United arab emirates)


VC0, Simulation date:
17/06/23 10:30
with v7.2.11

Special graphs
每日的 输入/输出 能量图

系统输出功率的分布

17/06/23 PVsyst Licensed to HDEC MIDDLE EAST CO DMCC (United arab emirates) Page 9/9